October 7, 2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION2014 to 2021 Construction Work PlanDivision 4 – Sheet 1 of 2US-281 over S. Canadian River Caddo C/LFFY 2016 Bridge & Approaches$10,000,000 FFY 2014 Right Of Way$ 302,824 FFY 2014 Utilities$ 358,000 $10,660,824US-60 from Garland Rd. E. 1.5 mi.FFY 2014 Shoulder Rehab.$ 419,940SH-164 over East Warren CreekFFY 2014 Bridge & Approaches$ 770,210US-270 over Unnamed Creek FFY 2017 Bridge & Approaches$ 1,490,487 FFY 2014 Right Of Way$ 163,500 FFY 2014 Utilities$ 163,500 $ 1,817,487I-40 EB & WB over South Canadian RiverFFY 2016 Bridge & Approaches$10,544,563 FFY 2016 Bridge & Approaches$ 9,367,606 $19,912,169I-40B over UPAC RailroadFFY 2018 Bridge & Approaches$ 6,500,000 FFY 2014 Right Of Way$ 93,360 FFY 2014 Utilities$ 118,379 $ 6,711,739US-281 Spur over I-40FFY 2018 Bridge & Approaches$ 2,657,880SH-152 from US-81 E. 9 mi.FFY 2019 Shoulder Improvement & Resurface$10,067,691 FFY 2016 Right Of Way$ 1,060,000FFY 2016 Utilities$ 1,060,000 $12,187,691SH-45 over Unnamed CreekFFY 2014 Bridge & Approaches$ 1,594,929SH-132 over Turkey CreekFFY 2014 Bridge & Approaches$ 1,992,171US-64/US-412 EB & WB over Blackbear CreekFFY 2018 Bridge & Approaches$ 854,820US-60 from 1 mi. N. of SH-45 N. 7.9 mi.FFY 2020 Shoulder Rehab.$ 3,354,388US-81 from SH-45 N. of Enid N. 8 mi.FFY 2019 Pavement Rehabilitation$ 6,095,065US-60 from Chestnut Ave. N. 5.4 mi.FFY 2019 Shoulder Rehab.$ 2,172,053US-60 over BNSF RailroadFFY 2018 Bridge & Approaches$ 4,000,000FFY 2016 Right-of-Way$ 200,000FFY 2016 Utilities$ 200,000 Total $ 4,400,000SH-11 from 6.43 mi. E. of Alfalfa C/L E. 6.57 mi.FFY 2014 Shoulder Improvement & Resurface$ 7,146,360US-64 over Unnamed CreekFFY 2014 Bridge & Approaches$ 805,471US-81 over Pole Cat & Unnamed CreeksFFY 2014 Bridge & Approaches$ 6,210,224US-64 over Unnamed CreekFFY 2014 Bridge & Approaches$ 583,927SH-74 over Unnamed CreekFFY 2017 Bridge & Approaches$ 747,489 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 1,047,464SH-11 over Polecat CreekFFY 2014 Bridge & Approaches$ 1,906,068SH-11 over Cottonwood CreekFFY 2017 Bridge & Approaches$ 1,103,360SH-11 over Osage CreekFFY 2017 Bridge & Approaches$ 1,055,395SH-11 over Pond CreekFFY 2017 Bridge & Approaches$ 1,224,452SH-11 from 13 mi. E. of Alfalfa C/L E. to US-81FFY 2017 Shoulder Improvement & Resurface$11,750,802SH-11 over Crooked CreekFFY 2014 Bridge & Approaches$ 1,430,892SH-15 over I-35FFY 2018 Bridge & Approaches$ 1,523,880SH-86 over Cow CreekFFY 2017 Bridge & Approaches$ 930,290US-177 from US-64 (Bills Corner) N. 6.1 mi.FFY 2014 Grade, Draining, Bridge & Surface$ 4,338,771SH-156 over Deadman CreekFFY 2014 Bridge & Approaches$ 541,060US-64 from 7 M. E. of Boundary St. E. 4.5 mi.FFY 2014 Surface$ 7,542,662US-177 from Cimarron Turnpike Spur N. 4 mi.FFY 2020 Grade, Drain & Surface$13,000,000 FFY 2018 Right Of Way$ 828,661 FFY 2018 Utilities$ 511,748 $14,340,409Note: The depicted information is based on project data currently available. Project estimates and schedules will remain subject to further refinement as more definitive data becomes available.I-35 from MM 229.33 & N. to MM 235.96FFY 2021 Pavement Rehabilitation$24,828,640SH-51 over Boomer CreekFFY 2015 Bridge & Approaches$ 5,822,439US-270 over Unnamed Creek FFY 2017 Bridge & Approaches$ 1,559,999 FFY 2014 Right Of Way$ 163,500 FFY 2014 Utilities$ 163,500 $ 1,886,999Fountain Road over I-35FFY 2018 Bridge & Approaches$ 1,523,880SH-156 over Cowskin CreekFFY 2019 Bridge & Approaches$ 750,000 FFY 2015 Right Of Way$ 93,360 FFY 2015 Utilities$ 118,379 $ 961,739SH-11 from I-35 E. 2 mi. (WB Only)FFY 2014 Shoulder Rehab.$ 566,116US-177 over Unnamed CreekFFY 2017 Bridge & Approaches$ 747,489 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 1,047,464US-177 over Unnamed CreekFFY 2017 Bridge & Approaches$ 568,339 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 868,314US-77 from Newkirk City Limits N. 3.2 mi.FFY 2017 Shoulder Improvement & Resurface$ 6,144,147US-77 from SH-11W N. 4.5 mi.FFY 2017 Shoulder Rehab.$ 2,334,734US-60 from Waverly St. E. 1.8 mi.FFY 2018 Pavement Rehabilitation$ 3,202,200US-60 over Bois D'Arc CreekFFY 2014 Bridge & Approaches$ 7,455,888US-60B EB & WB over Bois D' Arc CreekFFY 2019 Bridge & Approaches$ 2,363,040Bender Road over I-35FFY 2018 Bridge & Approaches$ 1,523,880I-35 NB & SB over Abandoned RailroadFFY 2018 Bridge Rehabilitation$ 2,000,000I-35 from MM 220 N. to MM 224.43FFY 2018 Resurface$18,000,000Hubbard Road over I-35FFY 2017 Bridge & Approaches$ 1,708,668 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 2,008,643I-35 from MM 213.91 N. to MM 220FFY 2019 Pavement Rehabilitation$23,302,130SH-51 over Turkey CreekFFY 2014 Bridge & Approaches$ 5,356,038US-81 from 5.4 mi. N. of Canadian C/L N. 3 mi.FFY 2015 Grade, Drain & Surface$ 3,636,000SH-51 from US-81 E. 7.53 mi.FFY 2017 Shoulder Improvement & Resurface$ 9,768,470FFY 2017 Bridge & Approaches$ 1,463,260 FFY 2014 Right Of Way$ 412,000 FFY 2014 Utilities$ 412,000 Total $12,055,730SH-33 over Campbell CreekFFY 2014 Bridge & Approaches$ 1,663,362SH-33 over Uncle John's Overflow & Unnamed CreeksFFY 2014 Bridge & Approaches$ 1,910,291SH-51 over Skeleton CreekFFY 2017 Bridge Rehabilitation$ 3,120,000US 81 Over Kingfisher CreekFFY 2018 Bridge & Approaches$ 4,000,000FFY 2017 Right Of Way$ 103,999FFY 2017 Utilities$ 103,999$ 4,207,998US-33 over Foreman CreekFFY 2018 Bridge & Approaches$ 750,000FFY 2016 Right Of Way$ 150,000FFY 2016 Utilities$ 150,000$ 1,050,000US-77 over Cimarron RiverFFY 2017 Bridge & Approaches$ 6,637,887 FFY 2014 Right Of Way$ 158,070 FFY 2014 Utilities$ 141,904 $ 6,937,861SH-33 from Drexel St. E. 1.3 mi. to SH-105FFY 2014 Pavement Rehabilitation$ 2,000,000SH-33 over Cottonwood Creek/Noble Street RailroadFFY 2016 Bridge & Approaches$15,194,369US-77 over Lawrie CreekFFY 2014 Bridge & Approaches$ 959,261SH-33 from Kingfisher C/L E. 3.51 mi.FFY 2017 Shoulder Improvement & Resurface$ 6,239,999FFY 2014 Right Of Way$ 632,576 FFY 2014 Utilities$ 979,590 $ 7,852,165SH-51 over Bridge CreekFFY 2018 Bridge & Approaches$ 1,671,300 FFY 2015 Right Of Way$ 158,071 FFY 2015 Utilities$ 141,904 $ 1,971,275SH-74 over Skeleton CreekFFY 2014 Bridge & Approaches$ 4,570,605SH-51 over Middle Beaver CreekFFY 2017 Bridge & Approaches$ 1,107,194 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 1,407,169SH-51 over East Beaver CreekFFY 2018 Bridge & Approaches$13,548,600 FFY 2015 Right Of Way$ 2,060,000 FFY 2015 Utilities$ 1,854,000 $17,462,600SH-51 over West Beaver CreekFFY 2017 Bridge & Approaches$ 4,179,427 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 4,479,402SH-18 from 2 mi. N. of SH-33 N. 6.5 mi.FFY 2020 Shoulder Improvement & Resurface$ 9,617,400 FFY 2015 Right Of Way$ 462,081 FFY 2015 Utilities$ 504,612 $10,584,093SH-18 over Salt CreekFFY 2014 Bridge & Approaches$ 1,485,450SH-51 EB over Unnamed CreekFFY 2017 Bridge & Approaches$ 4,244,427 FFY 2014 Right Of Way$ 158,070 FFY 2014 Utilities$ 141,904 $ 4,544,401SH-33 at SH-18 (Little Ave.) & Linwood Ave.FFY 2018 Intersect Modif$ 1,749,480 FFY 2018 Pavement Rehabilitation$ 4,667,140 $ 6,416,620SH-33 over Unnamed CreekFFY 2014 Widen, Resurface & Bridge$ 3,140,000SH-33 from 6.5 mi. W. of US-177 E. 4 mi.FFY 2021 Grade, Draining, Bridge & Surface$ 7,800,000SH-51 over Salt CreekFFY 2018 Bridge Rehabilitation$ 500,000SH-51 from E. of SH-18 E. 10.80 mi.FFY 2018 Pavement Rehabilitation$ 9,168,120SH-51 from SH-108 North, E. 12 mi.FFY 2018 Guardrail$ 943,396SH-51 over West & East Brush CreekFFY 2018 Bridge Rehabilitation$ 700,000US-60 from E. Pond Creek C/L E. 7 mi.FFY 2017 Right Of Way$ 780,000 FFY 2017 Utilities$ 780,000 $ 1,560,000SH-11 over Deer CreekFFY 2020 Bridge & Approaches$ 500,000 FFY 2017 Right Of Way$ 52,000 FFY 2017 Utilities$ 52,000 $ 604,000SH-33 over Gar CreekFFY 2020 Bridge & Approaches$ 2,000,000 FFY 2017 Right Of Way$ 52,000 FFY 2017 Utilities$ 52,000 $ 2,104,000SH-18 from SH-51 N. 3.75 mi.FFY 2021 Shoulder Improvement & Resurface$ 3,000,000 FFY 2017 Right Of Way$ 520,000 FFY 2017 Utilities$ 520,000 $ 4,040,000SH-132 over Unnamed CreekFFY 2018 Bridge & Approaches$ 917,431 FFY 2016 Right Of Way$ 204,000 FFY 2016 Utilities$ 204,000 $ 1,325,431I-35 NB & SB over AT&SF RRFFY 2020 Bridge & Approaches$ 6,000,000SH-11 over Thompson CreekFFY 2020 Bridge & Approaches$ 500,000 FFY 2017 Right Of Way$ 52,000 FFY 2017 Utilities$ 52,000 $ 604,000US-81 over UP RRFFY 2020 Bridge & Approaches$ 4,000,000SH-74D over Rock CreekFFY 2018 Bridge & Approaches$ 1,500,000 FFY 2015 Right Of Way$ 150,000 FFY 2015 Utilities$ 150,000 $ 1,800,000I-35 over Airport RoadFFY 2020 Bridge & Approaches$ 6,000,000US-177 from McElroy Rd. N. 1 mi.FFY 2020 Widen & Resurface$ 1,700,000SH-33 from US-81 E. 0.4 mi. & from SH-33 S. 2 BlocksFFY 2021 Pavement Rehabilitation$ 600,000SH-51 from 7.53 mi. E. of US-81 E. to SH-74E FFY 2021 Right Of Way$ 800,000 FFY 2021 Utilities$ 800,000 $ 1,600,000SH-74 from Adams St. S. 0.5 mi.FFY 2020 Pavement Rehabilitation$ 1,000,000I-35 from MM 156 N. to MM 158.198FFY 2021 Grade, Draining, Bridge & Surface$24,000,000County Road EW 760 over I-35FFY 2021 Bridge & Approaches$ 2,000,000US-81 on SB US-81 BridgeFFY 2021 Bridge Rehabilitation$ 2,000,000US-60 over the Chikaskia RiverFFY 2018 Bridge Rehabilitation$ 750,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 550,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 600,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 800,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 600,000See Sheet 2 forOKC Area Projects
Object Description
Okla State Agency |
Transportation, Oklahoma Department of |
Okla Agency Code |
'345' |
Title | Construction work plan, 2013/21 division 4 map |
Alternative title | 2014 to 2021 construction work plan division 4 |
Authors | Oklahoma. Department of Transportation. |
Publication Date | 2013-10-07 |
Publication type |
Map Planning Document |
Notes | 1 of 10 parts |
For all parts click | T1300.3 C758w 2013/21 |
For all issues click | T1300.3 C758w |
Digital Format | PDF, Adobe Reader required |
ODL electronic copy | Downloaded from agency website: http://www.odot.org/cwp-8-year-plan/cwp_ffy2014-ffy2021/cwp_ffy2014-ffy2021_division4-map.pdf |
Rights and Permissions | This Oklahoma state government publication is provided for educational purposes under U.S. copyright law. Other usage requires permission of copyright holders. |
Language | English |
Date created | 2014-04-22 |
Date modified | 2014-04-22 |
OCLC number | 890230005 |
Description
Title | cwp_ffy2014-ffy2021_division4-map 1 |
Full text | October 7, 2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION2014 to 2021 Construction Work PlanDivision 4 – Sheet 1 of 2US-281 over S. Canadian River Caddo C/LFFY 2016 Bridge & Approaches$10,000,000 FFY 2014 Right Of Way$ 302,824 FFY 2014 Utilities$ 358,000 $10,660,824US-60 from Garland Rd. E. 1.5 mi.FFY 2014 Shoulder Rehab.$ 419,940SH-164 over East Warren CreekFFY 2014 Bridge & Approaches$ 770,210US-270 over Unnamed Creek FFY 2017 Bridge & Approaches$ 1,490,487 FFY 2014 Right Of Way$ 163,500 FFY 2014 Utilities$ 163,500 $ 1,817,487I-40 EB & WB over South Canadian RiverFFY 2016 Bridge & Approaches$10,544,563 FFY 2016 Bridge & Approaches$ 9,367,606 $19,912,169I-40B over UPAC RailroadFFY 2018 Bridge & Approaches$ 6,500,000 FFY 2014 Right Of Way$ 93,360 FFY 2014 Utilities$ 118,379 $ 6,711,739US-281 Spur over I-40FFY 2018 Bridge & Approaches$ 2,657,880SH-152 from US-81 E. 9 mi.FFY 2019 Shoulder Improvement & Resurface$10,067,691 FFY 2016 Right Of Way$ 1,060,000FFY 2016 Utilities$ 1,060,000 $12,187,691SH-45 over Unnamed CreekFFY 2014 Bridge & Approaches$ 1,594,929SH-132 over Turkey CreekFFY 2014 Bridge & Approaches$ 1,992,171US-64/US-412 EB & WB over Blackbear CreekFFY 2018 Bridge & Approaches$ 854,820US-60 from 1 mi. N. of SH-45 N. 7.9 mi.FFY 2020 Shoulder Rehab.$ 3,354,388US-81 from SH-45 N. of Enid N. 8 mi.FFY 2019 Pavement Rehabilitation$ 6,095,065US-60 from Chestnut Ave. N. 5.4 mi.FFY 2019 Shoulder Rehab.$ 2,172,053US-60 over BNSF RailroadFFY 2018 Bridge & Approaches$ 4,000,000FFY 2016 Right-of-Way$ 200,000FFY 2016 Utilities$ 200,000 Total $ 4,400,000SH-11 from 6.43 mi. E. of Alfalfa C/L E. 6.57 mi.FFY 2014 Shoulder Improvement & Resurface$ 7,146,360US-64 over Unnamed CreekFFY 2014 Bridge & Approaches$ 805,471US-81 over Pole Cat & Unnamed CreeksFFY 2014 Bridge & Approaches$ 6,210,224US-64 over Unnamed CreekFFY 2014 Bridge & Approaches$ 583,927SH-74 over Unnamed CreekFFY 2017 Bridge & Approaches$ 747,489 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 1,047,464SH-11 over Polecat CreekFFY 2014 Bridge & Approaches$ 1,906,068SH-11 over Cottonwood CreekFFY 2017 Bridge & Approaches$ 1,103,360SH-11 over Osage CreekFFY 2017 Bridge & Approaches$ 1,055,395SH-11 over Pond CreekFFY 2017 Bridge & Approaches$ 1,224,452SH-11 from 13 mi. E. of Alfalfa C/L E. to US-81FFY 2017 Shoulder Improvement & Resurface$11,750,802SH-11 over Crooked CreekFFY 2014 Bridge & Approaches$ 1,430,892SH-15 over I-35FFY 2018 Bridge & Approaches$ 1,523,880SH-86 over Cow CreekFFY 2017 Bridge & Approaches$ 930,290US-177 from US-64 (Bills Corner) N. 6.1 mi.FFY 2014 Grade, Draining, Bridge & Surface$ 4,338,771SH-156 over Deadman CreekFFY 2014 Bridge & Approaches$ 541,060US-64 from 7 M. E. of Boundary St. E. 4.5 mi.FFY 2014 Surface$ 7,542,662US-177 from Cimarron Turnpike Spur N. 4 mi.FFY 2020 Grade, Drain & Surface$13,000,000 FFY 2018 Right Of Way$ 828,661 FFY 2018 Utilities$ 511,748 $14,340,409Note: The depicted information is based on project data currently available. Project estimates and schedules will remain subject to further refinement as more definitive data becomes available.I-35 from MM 229.33 & N. to MM 235.96FFY 2021 Pavement Rehabilitation$24,828,640SH-51 over Boomer CreekFFY 2015 Bridge & Approaches$ 5,822,439US-270 over Unnamed Creek FFY 2017 Bridge & Approaches$ 1,559,999 FFY 2014 Right Of Way$ 163,500 FFY 2014 Utilities$ 163,500 $ 1,886,999Fountain Road over I-35FFY 2018 Bridge & Approaches$ 1,523,880SH-156 over Cowskin CreekFFY 2019 Bridge & Approaches$ 750,000 FFY 2015 Right Of Way$ 93,360 FFY 2015 Utilities$ 118,379 $ 961,739SH-11 from I-35 E. 2 mi. (WB Only)FFY 2014 Shoulder Rehab.$ 566,116US-177 over Unnamed CreekFFY 2017 Bridge & Approaches$ 747,489 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 1,047,464US-177 over Unnamed CreekFFY 2017 Bridge & Approaches$ 568,339 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 868,314US-77 from Newkirk City Limits N. 3.2 mi.FFY 2017 Shoulder Improvement & Resurface$ 6,144,147US-77 from SH-11W N. 4.5 mi.FFY 2017 Shoulder Rehab.$ 2,334,734US-60 from Waverly St. E. 1.8 mi.FFY 2018 Pavement Rehabilitation$ 3,202,200US-60 over Bois D'Arc CreekFFY 2014 Bridge & Approaches$ 7,455,888US-60B EB & WB over Bois D' Arc CreekFFY 2019 Bridge & Approaches$ 2,363,040Bender Road over I-35FFY 2018 Bridge & Approaches$ 1,523,880I-35 NB & SB over Abandoned RailroadFFY 2018 Bridge Rehabilitation$ 2,000,000I-35 from MM 220 N. to MM 224.43FFY 2018 Resurface$18,000,000Hubbard Road over I-35FFY 2017 Bridge & Approaches$ 1,708,668 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 2,008,643I-35 from MM 213.91 N. to MM 220FFY 2019 Pavement Rehabilitation$23,302,130SH-51 over Turkey CreekFFY 2014 Bridge & Approaches$ 5,356,038US-81 from 5.4 mi. N. of Canadian C/L N. 3 mi.FFY 2015 Grade, Drain & Surface$ 3,636,000SH-51 from US-81 E. 7.53 mi.FFY 2017 Shoulder Improvement & Resurface$ 9,768,470FFY 2017 Bridge & Approaches$ 1,463,260 FFY 2014 Right Of Way$ 412,000 FFY 2014 Utilities$ 412,000 Total $12,055,730SH-33 over Campbell CreekFFY 2014 Bridge & Approaches$ 1,663,362SH-33 over Uncle John's Overflow & Unnamed CreeksFFY 2014 Bridge & Approaches$ 1,910,291SH-51 over Skeleton CreekFFY 2017 Bridge Rehabilitation$ 3,120,000US 81 Over Kingfisher CreekFFY 2018 Bridge & Approaches$ 4,000,000FFY 2017 Right Of Way$ 103,999FFY 2017 Utilities$ 103,999$ 4,207,998US-33 over Foreman CreekFFY 2018 Bridge & Approaches$ 750,000FFY 2016 Right Of Way$ 150,000FFY 2016 Utilities$ 150,000$ 1,050,000US-77 over Cimarron RiverFFY 2017 Bridge & Approaches$ 6,637,887 FFY 2014 Right Of Way$ 158,070 FFY 2014 Utilities$ 141,904 $ 6,937,861SH-33 from Drexel St. E. 1.3 mi. to SH-105FFY 2014 Pavement Rehabilitation$ 2,000,000SH-33 over Cottonwood Creek/Noble Street RailroadFFY 2016 Bridge & Approaches$15,194,369US-77 over Lawrie CreekFFY 2014 Bridge & Approaches$ 959,261SH-33 from Kingfisher C/L E. 3.51 mi.FFY 2017 Shoulder Improvement & Resurface$ 6,239,999FFY 2014 Right Of Way$ 632,576 FFY 2014 Utilities$ 979,590 $ 7,852,165SH-51 over Bridge CreekFFY 2018 Bridge & Approaches$ 1,671,300 FFY 2015 Right Of Way$ 158,071 FFY 2015 Utilities$ 141,904 $ 1,971,275SH-74 over Skeleton CreekFFY 2014 Bridge & Approaches$ 4,570,605SH-51 over Middle Beaver CreekFFY 2017 Bridge & Approaches$ 1,107,194 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 1,407,169SH-51 over East Beaver CreekFFY 2018 Bridge & Approaches$13,548,600 FFY 2015 Right Of Way$ 2,060,000 FFY 2015 Utilities$ 1,854,000 $17,462,600SH-51 over West Beaver CreekFFY 2017 Bridge & Approaches$ 4,179,427 FFY 2014 Right Of Way$ 158,071 FFY 2014 Utilities$ 141,904 $ 4,479,402SH-18 from 2 mi. N. of SH-33 N. 6.5 mi.FFY 2020 Shoulder Improvement & Resurface$ 9,617,400 FFY 2015 Right Of Way$ 462,081 FFY 2015 Utilities$ 504,612 $10,584,093SH-18 over Salt CreekFFY 2014 Bridge & Approaches$ 1,485,450SH-51 EB over Unnamed CreekFFY 2017 Bridge & Approaches$ 4,244,427 FFY 2014 Right Of Way$ 158,070 FFY 2014 Utilities$ 141,904 $ 4,544,401SH-33 at SH-18 (Little Ave.) & Linwood Ave.FFY 2018 Intersect Modif$ 1,749,480 FFY 2018 Pavement Rehabilitation$ 4,667,140 $ 6,416,620SH-33 over Unnamed CreekFFY 2014 Widen, Resurface & Bridge$ 3,140,000SH-33 from 6.5 mi. W. of US-177 E. 4 mi.FFY 2021 Grade, Draining, Bridge & Surface$ 7,800,000SH-51 over Salt CreekFFY 2018 Bridge Rehabilitation$ 500,000SH-51 from E. of SH-18 E. 10.80 mi.FFY 2018 Pavement Rehabilitation$ 9,168,120SH-51 from SH-108 North, E. 12 mi.FFY 2018 Guardrail$ 943,396SH-51 over West & East Brush CreekFFY 2018 Bridge Rehabilitation$ 700,000US-60 from E. Pond Creek C/L E. 7 mi.FFY 2017 Right Of Way$ 780,000 FFY 2017 Utilities$ 780,000 $ 1,560,000SH-11 over Deer CreekFFY 2020 Bridge & Approaches$ 500,000 FFY 2017 Right Of Way$ 52,000 FFY 2017 Utilities$ 52,000 $ 604,000SH-33 over Gar CreekFFY 2020 Bridge & Approaches$ 2,000,000 FFY 2017 Right Of Way$ 52,000 FFY 2017 Utilities$ 52,000 $ 2,104,000SH-18 from SH-51 N. 3.75 mi.FFY 2021 Shoulder Improvement & Resurface$ 3,000,000 FFY 2017 Right Of Way$ 520,000 FFY 2017 Utilities$ 520,000 $ 4,040,000SH-132 over Unnamed CreekFFY 2018 Bridge & Approaches$ 917,431 FFY 2016 Right Of Way$ 204,000 FFY 2016 Utilities$ 204,000 $ 1,325,431I-35 NB & SB over AT&SF RRFFY 2020 Bridge & Approaches$ 6,000,000SH-11 over Thompson CreekFFY 2020 Bridge & Approaches$ 500,000 FFY 2017 Right Of Way$ 52,000 FFY 2017 Utilities$ 52,000 $ 604,000US-81 over UP RRFFY 2020 Bridge & Approaches$ 4,000,000SH-74D over Rock CreekFFY 2018 Bridge & Approaches$ 1,500,000 FFY 2015 Right Of Way$ 150,000 FFY 2015 Utilities$ 150,000 $ 1,800,000I-35 over Airport RoadFFY 2020 Bridge & Approaches$ 6,000,000US-177 from McElroy Rd. N. 1 mi.FFY 2020 Widen & Resurface$ 1,700,000SH-33 from US-81 E. 0.4 mi. & from SH-33 S. 2 BlocksFFY 2021 Pavement Rehabilitation$ 600,000SH-51 from 7.53 mi. E. of US-81 E. to SH-74E FFY 2021 Right Of Way$ 800,000 FFY 2021 Utilities$ 800,000 $ 1,600,000SH-74 from Adams St. S. 0.5 mi.FFY 2020 Pavement Rehabilitation$ 1,000,000I-35 from MM 156 N. to MM 158.198FFY 2021 Grade, Draining, Bridge & Surface$24,000,000County Road EW 760 over I-35FFY 2021 Bridge & Approaches$ 2,000,000US-81 on SB US-81 BridgeFFY 2021 Bridge Rehabilitation$ 2,000,000US-60 over the Chikaskia RiverFFY 2018 Bridge Rehabilitation$ 750,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 550,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 600,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 800,000US-60 over the Chikaskia River OverflowFFY 2018 Bridge Rehabilitation$ 600,000See Sheet 2 forOKC Area Projects |
Date created | 2014-04-22 |
Date modified | 2014-04-22 |