2012-2019 Construction work plan |
Previous | 1 of 18 | Next |
|
small (250x250 max)
medium (500x500 max)
Large
Extra Large
large ( > 500x500)
Full Resolution
|
This page
All
|
OKLAHOMA DEPARTMENT OF TRANSPORTATION FFY-2012 through FFY-2019 Construction Work Plan Volume IX Table of Contents SECTION I FOREWORD - Letter from the Director SECTION II BUDGETARY PROJECTIONS SECTION III BALANCING PROCESS SECTION IV SUMMARY REPORT SECTION V CONSTRUCTION WORK PLAN Sorted by Federal Fiscal Year and by County Presented for Transportation Commission Consideration October 3, 2011 FOREWORD The Oklahoma Department of Transportation is pleased to provide the 2012-2019 Construction Work Plan, Volume IX. The Plan encompasses critically needed transportation improvement projects on our State and US highways and our Interstates. These projects are recommended through an annual validation and consideration process led by our eight Field Division Engineers and approved by the Transportation Commission. The State owned highway system in Oklahoma is comprised of the State numbered route highways, the US numbered route highways and the interstate highway system. The state system of highways encompasses 12,265 centerline miles as measured in one direction along the dividing stripe of two lane facilities and in one direction along the general median of multilane facilities. Transportation on our highways is also facilitated via 6,788 bridge structures that span major rivers and lakes, named and unnamed perennial streams and creeks, other roads and highways and railroads. On the average, passenger vehicles, buses and light and heavy trucks traveled more than 66 million vehicle miles each day (daily vehicle miles traveled or DVMT) in 2010 on the non-toll highways in the State of Oklahoma. The conditional issues that manifest in our bridge infrastructure are well known. Since the year 2000 Oklahoma has consistently ranked as one of the worst states on the national list of structurally deficient bridges. At the most recent peak in 2005 1,163 bridges or a full 17% of all highway system bridges were classified as structurally deficient. The Department has placed a priority and focused available resources on this chronic problem in earnest since 2003. With the passage of House Bill 1078 in 2005, which initiated the Rebuilding Oklahoma Access and Driver Safety (ROADS) fund, a more diverse funding pool has been brought to bear. As a result, our structurally deficient bridge numbers are expected to drop to 706 of the recorded 6,788 or 10.4% with the release of the adjusted 2010 annual bridge inspection reports. A thorough review of the current Asset Preservation Plan and the 2011-2018 Construction Work Plan revealed that only 293 of the identified structurally deficient bridges are unfunded and have no scheduled solution. Therefore, as we finalize our annual rebalancing of the Construction Work Plan, it has become increasingly clear that the enormity of the structurally deficient bridge problem that has plagued the highway system for many years can be substantially reduced. Governor Fallin has chosen to confront this long standing problem head on. She has challenged the Department to prepare an investment strategy that will visit all known structurally deficient bridge conditional issues within an eight year window. In response, this Construction Work Plan includes an additional 126 of the 293 remaining unfunded structurally deficient bridges. The structurally deficient bridges identified as unfunded encompass the remaining 167 structures located in all areas of the State with an estimated improvement cost of $439.3 million in today’s dollars. Fully implemented, Governor Fallin’s bold infrastructure investment challenge will provide funding for the remaining structurally deficient bridges and the Department stands ready to effect the improvements. Oklahoman’s will witness a complete reversal of our bridge infrastructure conditional standing, as we move from the bottom to near the top during the time period encompassed by this very Construction Work Plan. As envisioned, the Governor sends a clear message regarding our resolve to control our own destiny by investing in ourselves to the betterment of our citizens and in the interest of furthering our economic progress. Gary M. Ridley Secretary of Transportation BUDGETARY PROJECTIONS Budgetary Projections CONSTRUCTION WORK PLAN - FFY 2012 through FFY 2019 The budgetary projections utilized for the basis of the fiscally responsible and financially balanced Construction Work Plan were established through a systematic evaluation of the Department’s anticipated State-Aid and Federal-Aid revenues and expenditures. Projections were performed for Federal Fiscal Years 2012 - 2019 with the Federal Fiscal Year defined as beginning October 1st and ending on September 30th. The budgetary projections only address funding that has been historically and/or categorically committed to State, Federal and Interstate highway system improvements and does not address Department earmarks or other mandated programs. For the purposes of the initial projections, an estimated baseline State-Aid amount of $82.17 million and an estimated Federal-Aid amount of $333.9 million was utilized as the Fiscal Year 2012 benchmark. The Federal-Aid amount includes a 7.5% projection overstatement to avoid any potential loss of future Federal-Aid funds due to under programming. Of particular note, the annual baseline State-Aid amount available for Construction Work Plan projects is expected to grow to over $317.8 million during the next eight years. As the benchmark amount will vary based upon the results of the annual Congressional budgeting process, the estimated projections will require further adjustment and we will adapt our Construction Work Plan accordingly. Once the Statewide projections are recorded by Fiscal Year, the following formula is applied to establish a baseline Fiscal Year projection for each Field Division: % of Population + % of Mainline Highway System Miles + % of Previous 15 Year Const. Program 3 This formula considers common demographic, physical and historical criteria and yields a Divisional percentage that renders an equitable distribution of the available funds. CORRIDOR PLAN PROJECTS The budgetary projections for Federal Fiscal Years 2012 - 2019 are adjusted accordingly to reflect the debt service requirements of the Corridor Plan projects. The individual project estimates exemplified in the Construction Work Plan constitute approximately 100% of the Federal Fiscal Years 2012 - 2019 anticipated available State and Federal formula funds including the 7.5% overstatement of Federal-Aid and the earmarked Interstate Maintenance funds and excludes the Corridor Plan debt service. BALANCING PROCESS Balancing Process The balancing of the Construction Work Plan progressed in accordance with the roles and responsibilities generally defined in the following outline: Field Division Engineers The development of Construction Work Plan begins with our Field Division Engineers and is guided by their knowledge of the transportation needs and priorities in their respective Divisions. They and their staff work to maintain an understanding of the condition of the roads and bridges in their areas of responsibility. In addition, other key Department Divisions collect and analyze transportation data factoring the following general characteristics as applicable and listed in no particular order: surface condition bridge condition geometrics (vertical and horizontal alignment) average annual daily traffic (AADT) percentage of truck traffic accident history local, regional and national traffic patterns capacity The understanding gained from this information is then coupled with the careful consideration of the Field Division’s condition and capacity assessments of the highway network and the associated critical needs, their anticipated improvement budgets, and further communication with the Division’s Transportation Commissioner. The Field Division Engineers then review and validate the scheduled Construction Work Plan projects and formulate a group of new projects to be added in accordance with the projected funding availability. Planning & Research Division The Planning & Research Division is responsible for coordinating the State’s transportation planning efforts with those of Oklahoma’s Metropolitan Planning Organizations, and consulting with the tribal governments and local officials with responsibilities for transportation. The development of the Long Range Plan, the maintenance of the Statewide Transportation Improvement Plan as derived from the first four years of the ODOT Eight Year Construction Work Plan, Corridor Studies, as well as early project development all include opportunities for public participation and review. The results of this public involvement, input from ongoing coordination and consultation, and the planning documents are provided to the Field Division Engineers for their consideration as the Work Plan is developed. Project Management Division The Project Management Division works directly with and assists the Field Division Engineers in the development of their respective Division’s Construction Work Plan and in the subsequent daily management of the project development activities. Projects proposed by the Field Division Engineers that did not previously exist in the Construction Work Plan are validated to the extent possible in order to institute a preliminary scope, schedule and budget. Concurrently and to the extent possible, the scope, schedule and budget of projects that previously existed in the Construction Work Plan are re-validated. The Project Management Division then continues to facilitate necessary modifications to the scope, schedule and/or budgets of approved Construction Work Plan projects as more detailed information becomes available during the course of Project Development. Validation of projects is accomplished through drive outs and/or other project team meetings with the complete participation of appropriate Preconstruction and Operations Divisions as deemed necessary. The responsible Project Manager schedules, coordinates, documents and facilitates these meetings. Director, Deputy Director and the Chief Engineer The Director, Deputy Director and Chief Engineer, in concert with the Director of Engineering, Director of Operations, Director of Capital Programs and Information Management, Director of Finance and Administration, the Programs Division, the Project Management Division and the Field Division Engineers work to fiscally constrain and balance the Construction Work Plan in accordance with the percentage requirements of the IM, NH, STP, and BR Federal funding categories. The Work Plan balancing is performed with foremost consideration for maintaining the integrity of the Field Division Engineer’s and the Transportation Commissioner’s project priorities. In addition, the balancing process seeks to insure that each Field Division is allocated available funding in accordance with the aggregate State and Federal budget projections. ADDITIONAL CONSIDERATIONS Given the number of extreme variables and the inherent need to maintain a balance between available funds and the Divisional funding commitments, the final Divisional projections are adjusted within a given year. Any adjustments are initiated with consideration for the debt service requirements of the Corridor Plan projects, the ability to schedule and prepare projects for construction in the appropriate Federal-Aid funding categories and the ability to sustain a reasonable annual Construction Work Plan in each Division. The Construction Work Plan is balanced within these guidelines and has been determined to be an equitable representation to the satisfaction of the Department and the Transportation Commission. The Interstate Maintenance Earmarking commitment is continued and adjusted as necessary to encourage the substantial replacement, repair and preservation of the Interstate System. The IM Earmark commitment corresponds with the Divisional budgetary dedication by fiscal year. The Programs Division and the Project Management Division will work in concert with the Field and Central Office Divisions to continue the monitoring and management of the Construction Work Plan in accordance with the provisions of the Construction Work Plan Management Process. FFY 1 FFY 2 FFY 3 FFY 4 FFY 5 FFY 6 FFY 7 FFY 8 Statewide Construction Work Plan Statewide Transportation Improvement Program Transition Year Extended Program Current Year Non Flexible Low Flexibility Moderate Flexibility CONSTRUCTION WORK PLAN MANAGEMENT PROCESS Projects are “Locked” Only modified through formal Program Revision Process Must Remain Balanced Evaluated yearly (July-August) to prepare for inclusion of Extended Program Potential projects to be considered for current program “Lock” Refined project Scope/ Schedule/Budget Prioritized by Year May set minimum criteria for inclusion Must Remain Balanced Evaluated yearly (July- August) to prepare for inclusion of Extended Program Varying levels of Project Development Flexible Scope/Schedule/Budget Prioritized by Year Must Remain Balanced Any project can be advanced for consideration in the Transition Year Evaluated yearly (July-August) to prepare for inclusion of Unscheduled Projects SUMMARY REPORT FFY Division 1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 FFY Totals Estimate $388,344,123 $29,019,910 $39,409,750 $59,260,300 $85,652,984 $32,481,455 $26,234,485 $31,341,079 $84,944,160 $388,344,123 IM Earmark $30,000,000 $2,000,000 $0 $8,000,000 $10,000,000 $0 $0 $0 $10,000,000 $30,000,000 Total $418,344,123 $31,019,910 $39,409,750 $67,260,300 $95,652,984 $32,481,455 $26,234,485 $31,341,079 $94,944,160 $418,344,123 Estimate $487,437,929 $38,771,081 $43,325,990 $69,939,909 $109,316,995 $39,253,271 $30,687,639 $47,205,166 $108,937,878 $487,437,929 IM Earmark $30,000,000 $0 $0 $7,000,000 $9,000,000 $2,000,000 $0 $3,000,000 $9,000,000 $30,000,000 Total $517,437,929 $38,771,081 $43,325,990 $76,939,909 $118,316,995 $41,253,271 $30,687,639 $50,205,166 $117,937,878 $517,437,929 Estimate $537,766,302 $41,486,423 $47,517,301 $75,864,267 $139,502,066 $42,840,572 $31,586,249 $46,867,382 $112,102,042 $537,766,302 IM Earmark $30,000,000 $0 $0 $7,000,000 $9,000,000 $2,000,000 $0 $3,000,000 $9,000,000 $30,000,000 Total $567,766,302 $41,486,423 $47,517,301 $82,864,267 $148,502,066 $44,840,572 $31,586,249 $49,867,382 $121,102,042 $567,766,302 Estimate $551,923,313 $46,531,975 $51,417,480 $81,248,394 $120,314,956 $46,199,105 $34,948,344 $51,702,981 $119,560,078 $551,923,313 IM Earmark $30,000,000 $5,000,000 $0 $3,000,000 $10,000,000 $4,000,000 $0 $3,000,000 $5,000,000 $30,000,000 Total $581,923,313 $51,531,975 $51,417,480 $84,248,394 $130,314,956 $50,199,105 $34,948,344 $54,702,981 $124,560,078 $581,923,313 Estimate $607,263,594 $55,177,225 $53,794,868 $83,399,900 $121,012,644 $49,268,161 $39,789,683 $68,695,961 $136,125,152 $607,263,594 IM Earmark $30,000,000 $5,000,000 $0 $5,000,000 $7,000,000 $3,000,000 $0 $3,000,000 $7,000,000 $30,000,000 Total $637,263,594 $60,177,225 $53,794,868 $88,399,900 $128,012,644 $52,268,161 $39,789,683 $71,695,961 $143,125,152 $637,263,594 Estimate $616,764,258 $59,097,413 $55,700,000 $86,054,700 $133,502,733 $50,739,967 $40,879,482 $66,143,742 $124,646,221 $616,764,258 IM Earmark $30,000,000 $5,000,000 $0 $5,000,000 $7,000,000 $3,000,000 $0 $3,000,000 $7,000,000 $30,000,000 Total $646,764,258 $64,097,413 $55,700,000 $91,054,700 $140,502,733 $53,739,967 $40,879,482 $69,143,742 $131,646,221 $646,764,258 Estimate $614,141,017 $58,358,000 $55,500,000 $85,804,000 $132,812,924 $50,738,041 $40,634,730 $63,509,782 $126,783,540 $614,141,017 IM Earmark $30,000,000 $5,000,000 $0 $5,000,000 $7,000,000 $3,000,000 $0 $3,000,000 $7,000,000 $30,000,000 Total $644,141,017 $63,358,000 $55,500,000 $90,804,000 $139,812,924 $53,738,041 $40,634,730 $66,509,782 $133,783,540 $644,141,017 Estimate $634,120,337 $63,030,000 $58,600,000 $90,250,000 $135,240,551 $53,453,091 $44,486,664 $66,895,381 $122,164,650 $634,120,337 IM Earmark $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $634,120,337 $63,030,000 $58,600,000 $90,250,000 $135,240,551 $53,453,091 $44,486,664 $66,895,381 $122,164,650 $634,120,337 $391,472,027 $405,265,389 $631,821,470 $977,355,853 $364,973,663 $289,247,276 $442,361,474 $935,263,721 $4,437,760,873 $22,000,000 $0 $40,000,000 $59,000,000 $17,000,000 $0 $18,000,000 $54,000,000 $210,000,000 $413,472,027 $405,265,389 $671,821,470 $1,036,355,853 $381,973,663 $289,247,276 $460,361,474 $989,263,721 $4,647,760,873 2018 Total Engineer Estimate Total IM Earmark Funds Total Estimate 2019 2016 2017 2014 2015 CONSTRUCTION WORK PLAN SUMMARY REPORT 2012 2013 Available Funds CONSTRUCTION WORK PLAN FFY 2012 - FFY 2019 CONSTRUCTION WORK PLAN *Projects are ordered by Federal Fiscal Year and arranged alphabetically by County* FFY 2012 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt Federal Fiscal Year 2012 RIGHT OF WAY US-59: FR 6.95 MILES NORTH OF WESTVILLE, EXTEND NORTH 3.48 MILES 16928(18) FFY 2012 THRUWATTS RW FOR 16928(17) ADAIR Div. 1 US059 3.480 Mi. Let 02/2012 $898,325 UTILITIES US-59: FR 6.95 MILES NORTH OF WESTVILLE, EXTEND NORTH 3.48 MILES 16928(19) FFY 2012 THRUWATTS UT FOR 16928(17) ADAIR Div. 1 US059 3.480 Mi. Let 02/2012 $1,132,075 BRIDGE & APPROACHES SH-11: OVER UNNAMED CREEKS APPROX. 3.8 & 4.7 MI EAST OFJCT. OF 21710(04) FFY 2012 SH-11/US-64 ALFALFA Div. 6 SH011 1.600 Mi. Let 08/2012 $3,285,000 BRIDGE & APPROACHES US-64 OVER SPRING CR, 0.2 MI WEST OF SH-58 24062(04) FFY 2012 ALFALFA Div. 6 US064 0.110 Mi. Let 04/2012 $2,772,506 RIGHT OF WAY US-64: OVER WAGON CREEK, 0.9 MILES WEST OF GRANT CO. LN. RW FOR 27006(05) FFY 2012 27006(04) ALFALFA Div. 6 US064 1.000 Mi. Let 07/2012 $140,000 RIGHT OF WAY SH-7 FROM 6.4 MI EAST OF THE JOHNSON C/L EAST 5.0 MI RW FOR 24066(04) 24066(05) FFY 2012 ATOKA Div. 2 SH007 5.000 Mi. Let 08/2012 $662,500 UTILITIES SH-7 FROM 6.4 MI EAST OF THE JOHNSON C/L EAST 5.0 MI UT FOR 24066(04) 24066(06) FFY 2012 ATOKA Div. 2 SH007 5.000 Mi. Let 08/2012 $265,000 RIGHT OF WAY SH-7 FROM 11.4 MI EAST OF THE JOHNSON C/L EAST 4.05 MI RW FOR 24066(08) FFY 2012 24066(07) ATOKA Div. 2 SH007 4.050 Mi. Let 08/2012 $530,000 UTILITIES SH-7 FROM 11.4 MI EAST OF THE JOHNSON C/L EAST 4.05 MI UT FOR 24066(09) FFY 2012 24066(07) ATOKA Div. 2 SH007 4.050 Mi. Let 08/2012 $212,000 WIDEN & RESURFACE US-75 FROM JCT US-69/75 EXTEND WEST 2.5 MILES 29134(04) FFY 2012 ATOKA Div. 2 US075 2.500 Mi. Let 09/2012 $2,000,000 RIGHT OF WAY US-75 FROM JCT US-69/75 EXTEND WEST 2.5 MILES RW FOR 29134(04) 29134(05) FFY 2012 ATOKA Div. 2 US075 2.500 Mi. Let 07/2012 $100,000 UTILITIES US-75 FROM JCT US-69/75 EXTEND WEST 2.5 MILES UT FOR 29134(04) 29134(06) FFY 2012 ATOKA Div. 2 US075 2.500 Mi. Let 07/2012 $100,000 BRIDGE & APPROACHES SH-152: OVER SWEETWATER CREEK & OVRFLOW APPROX 1.9 MILE EAST OF 21703(04) FFY 2012 THETEXAS S/L BECKHAM Div. 5 SH152 0.600 Mi. Let 09/2012 $2,900,047 RIGHT OF WAY SH-30: BR. AND APPR. OVER N. FORK OF RED RIVER, 6.0 MI. N. OF I-40(RW FOR: 23243(05) FFY 2012 23243 (04)&(07). BECKHAM Div. 5 SH030 1.000 Mi. Let 03/2012 $24,852 UTILITIES SH-30: BR. AND APPR. OVER N. FORK OF RED RIVER, 6.0 MI. N. OF I-40UT FOR: 23243(06) FFY 2012 23243 (04)&(07). BECKHAM Div. 5 SH030 1.000 Mi. Let 03/2012 $179,850 BRIDGE PAINTING I-40: BRIDGE PAINT ON R/R BRIDGE OVER I-40 AT MP 23.59. (NBI 17932) 28902(04) FFY 2012 BECKHAM Div. 5 IS040 0.100 Mi. Let 04/2012 $250,000 BRIDGE & APPROACHES SH-58: OVER NINE MILE AND AN UNNAMED CREEK APPROXIMATELY 8.6 AND 9.2 21704(04) FFY 2012 MILESNORTH OF THE US-270 JCT. BLAINE Div. 5 SH058 0.230 Mi. Let 02/2012 $2,644,244 BRIDGE & APPROACHES US-270 OVER THE NORTH CANADIAN RV, 10.2 MI EAST OF THE DEWEY C/L 24087(04) FFY 2012 BLAINE Div. 5 US270 0.400 Mi. Let 11/2011 $3,128,215 BRIDGE & APPROACHES US-70: OVER BLUE RIVER APPROX. 7.7 MILE EAST OF US-69 BUSINESS. 21733(04) FFY 2012 BRYAN Div. 2 US070 0.130 Mi. Let 07/2012 $3,900,000 BRIDGE & APPROACHES SH-199 OVER THE WASHITA RV, 4.0 MI WEST OF SH-78 23191(04) FFY 2012 BRYAN Div. 2 SH199 0.020 Mi. Let 01/2012 $6,000,000 LANDSCAPING US-70 FROM .5 MILE WEST OF DURANT EXTEND SOUTH & EAST 4.74 MILES 27377(04) FFY 2012 MITIGATION FOR 18847(04),18847(05),18847(06) (DURANT BYPASS) BRYAN Div. 2 US070 4.740 Mi. Let 06/2012 $1,000,000 INTERCHANGE US-69 SOUTHBOUND OFF RAMP TO UNIVERSITY BLVD IN CITY OF DURANT 28678(04) FFY 2012 (PENDING FUNDING BY OTHERS) BRYAN Div. 2 US069 0.200 Mi. Let 07/2012 $1,000,000 GRADE, DRAIN & SURFACE SH-152 BEG 2.0 MI E. OF SH-146, EXT E. APPROX 2.10MI. TO APACHEAVE 01817(04) FFY 2012 W/STORM SEWER OUTFALL EXT .24 MI TO 0.1 MI E. OF US-281 CADDO Div. 7 SH152 2.100 Mi. Let 03/2012 $7,653,356 RIGHT OF WAY US-62: FROM SH-19 JCT. N, APPR0X 7.0 MI (BRIDGE EXCEPTION AT BOX ELDER 12571(05) FFY 2012 CR.BEGIN 1.6 MIS N OF SH-19 EXTEND 0.283 MIS) R/W FOR 12571(04) CADDO Div. 7 US062 7.260 Mi. Let 06/2012 $388,350 Wednesday, September 28, 2011 page 1 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES US-62: FROM SH-19 JCT. N, APPR0X 7.0 MI (BRIDGE EXCEPTION AT BOX ELDER 12571(06) FFY 2012 CR.BEGIN 1.6 MIS N OF SH-19 EXTEND 0.283 MIS) UT FOR 12571(04) CADDO Div. 7 US062 7.260 Mi. Let 06/2012 $823,300 BRIDGE & APPROACHES US-62 OVER UNNAMED CREEK APPROX. 2.9 MILE NORTH OF JCT US-62/SH-19 21711(08) FFY 2012 CADDO Div. 7 US062 0.150 Mi. Let 04/2012 $945,400 BRIDGE & APPROACHES US-62 OVER UNNAMED CREEK APPROX. 3.51 MILE NORTH OF JCT US-62/SH-19 21711(09) FFY 2012 CADDO Div. 7 US062 0.150 Mi. Let 04/2012 $1,021,114 RIGHT OF WAY SH-9 RECON. ON EXISTING ALIGN. FROM 5.65 MI WEST OF US-62 EAST TO 24094(05) FFY 2012 US-62ROW FOR 24094(04) CADDO Div. 7 SH009 5.600 Mi. Let 04/2012 $605,700 UTILITIES SH-9 RECON. ON EXISTING ALIGN. FROM 5.65 MI WEST OF US-62 EAST TO 24094(06) FFY 2012 US-62UT FOR 24094(04) CADDO Div. 7 SH009 5.600 Mi. Let 04/2012 $864,600 RESURFACE I-40: FROM MILE MARKER 102.2 TO 104.26. 26488(04) FFY 2012 CADDO Div. 5 IS040 2.060 Mi. Let 11/2011 $4,100,000 RIGHT OF WAY I-40: RCB REPAIR AT MILEPOST 103.5.RIGHT-OF-WAY FOR 26488(07) 26488(05) FFY 2012 CADDO Div. 5 IS040 0.100 Mi. Let 10/2011 $10,000 UTILITIES I-40: RCB REPAIR AT MILEPOST 103.5.UTILITIES FOR 26488(07) 26488(06) FFY 2012 CADDO Div. 5 IS040 0.100 Mi. Let 10/2011 $10,000 GRADE, DRAIN & SURFACE SH-199 FROM 1.35 MI WEST OF US-177, EXTEND EAST APPROX. 1.67 MI(PHASE 20231(07) FFY 2012 II) CARTER Div. 7 SH199 1.670 Mi. Let 03/2012 $6,386,000 GRADE, DRAIN & SURFACE SH-53 BEG. 7.05 MI. E. OF I-35 AT THE W. ENT. TO ARDMORE AIR PARK, EXT 24373(04) FFY 2012 S.0.6 MI. TO JCT SH-53A (OK-002) CARTER Div. 7 SH053 0.600 Mi. Let 01/2012 $1,832,000 BRIDGE & APPROACHES SH-76 OVER WILDHORSE & UNNAMED CREEKS, 2.76 & 2.95 MI NORTH OF SH-7 24953(04) FFY 2012 CARTER Div. 3 SH076 0.300 Mi. Let 07/2012 $2,165,000 RIGHT OF WAY US-177 OVER WASHITA RIVER BEGIN APPROX 3.2 MIS N. OF JCT SH-199 28035(05) FFY 2012 EXTEND N. 0.35 MIS. (RW FOR J.P. 28035(04) CARTER Div. 7 US177 0.350 Mi. Let 02/2012 $300,000 UTILITIES US-177 OVER WASHITA RIVER BEGIN APPROX 3.2 MIS N. OF JCT SH-199 28035(06) FFY 2012 EXTEND N. 0.35 MIS. (UT FOR J.P. 28035(04) CARTER Div. 7 US177 0.350 Mi. Let 02/2012 $159,900 RIGHT OF WAY SH-51: OVER FOURTEEN MILE CREEK, 5.0 MILES EAST OF WAGONER CO. LINE. 23138(05) FFY 2012 (ROW FOR: 23138(04)) CHEROKEE Div. 1 SH051 0.060 Mi. Let 01/2012 $421,242 UTILITIES SH-51: OVER FOURTEEN MILE CREEK, 5.0 MILES EAST OF WAGONER CO. LINE. 23138(06) FFY 2012 (UT FOR: 23138(04)) CHEROKEE Div. 1 SH051 0.060 Mi. Let 01/2012 $379,480 RIGHT OF WAY SH-10: FROM APPROX. 2 MILE NORTH OF JCT. SH-51 (ILLINOIS RIVER) 28970(05) FFY 2012 CHEROKEE Div. 1 SH010 0.200 Mi. Let 06/2012 $115,000 RIGHT OF WAY I-35: 6 LANE FROM RIVER, NORTH TO 0.5 MI SOUTH OF MAIN ST. IN NORMAN 09031(06) FFY 2012 (SH-9 & LINDSEY STREET) (RW FOR 09031(05)(09)) CLEVELAND Div. 3 IS035 1.120 Mi. Let 06/2012 $1,030,000 UTILITIES I-35: 6 LANE FROM RIVER, NORTH TO 0.5 MI SOUTH OF MAIN ST. IN NORMAN 09031(07) FFY 2012 (SH-9 & LINDSEY STREET) (UT FOR 09031(05)(09)) CLEVELAND Div. 3 IS035 1.120 Mi. Let 06/2012 $2,369,000 GRADE, DRAIN & BRIDGE I-35: 6 LANE FROM 0.5 MI SOUTH OF MAIN ST, NORTH 1.0 MI IN NORMAN (MAIN 09031(08) FFY 2012 STREET INTERCHANGE) CLEVELAND Div. 3 IS035 1.000 Mi. Let 09/2012 $22,145,000 SAFETY IMPROVEMENT I-35: SOUNDWALL BETWEEN LINDSEY STREET AND MAIN STREET ALONG EAST 09031(15) FFY 2012 SIDE OF I-35 CLEVELAND Div. 3 IS035 1.000 Mi. Let 01/2012 $4,000,000 GRADE, DRAIN & SURFACE US-77: FROM 4.05 MI NORTH OF SH-39, NORTH 2.5 MI THRU SLAUGHTERVILLE (4 20997(07) FFY 2012 LANE UNDIVIDED) CLEVELAND Div. 3 US077 2.500 Mi. Let 07/2012 $8,570,000 GRADE, DRAIN & SURFACE I-35 AT ROBINSON ST IN NORMAN, RECONSTRUCT NORTHBOUND ON/OFF 24029(04) FFY 2012 RAMPS (CITY TO FUND) CLEVELAND Div. 3 IS035 0.500 Mi. Let 06/2012 $1,110,000 RIGHT OF WAY I-35 OVER SOUTH CANADIAN RIVER IN NORMAN (BRIDGE WIDENING) (RW FOR 27896(05) FFY 2012 27896(04)) CLEVELAND Div. 3 IS035 0.710 Mi. Let 01/2012 $750,000 UTILITIES I-35 OVER SOUTH CANADIAN RIVER IN NORMAN (BRIDGE WIDENING) (UT FOR 27896(06) FFY 2012 27896(04) CLEVELAND Div. 3 IS035 0.710 Mi. Let 01/2012 $250,000 BRIDGE & APPROACHES SH-17: OVER SHETTLERS & BEAVER CREEKS APPROX 1.1 MILE E. OF SH-65 & 20956(04) FFY 2012 EXTEAST APPROX 0.7 MILE. COMANCHE Div. 7 SH017 0.700 Mi. Let 01/2012 $4,639,818 Wednesday, September 28, 2011 page 2 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY US-62 AT I-44 INTERCHANGE IN LAWTONRW FOR J.P. 27050(04) 27050(05) FFY 2012 COMANCHE Div. 7 US062 0.240 Mi. Let 03/2012 $400,000 UTILITIES US-62 AT I-44 INTERCHANGE IN LAWTONUT FOR 27050(04) 27050(06) FFY 2012 COMANCHE Div. 7 US062 0.240 Mi. Let 03/2012 $1,500,000 RIGHT OF WAY SH-5 OVER SOLDIERS CREEK BEGIN 4.2 MIS S. . OF JCT SH-53 EXTEND E.0.20 27964(05) FFY 2012 MIS (RW FOR J.P. 27964(04) COTTON Div. 7 SH005 0.200 Mi. Let 02/2012 $40,200 UTILITIES SH-5 OVER SOLDIERS CREEK BEGIN 4.2 MIS S. OF JCT SH-53 EXTEND E.0.20 MIS 27964(06) FFY 2012 (UT FOR J.P. 27964(04) COTTON Div. 7 SH005 0.200 Mi. Let 02/2012 $151,100 RIGHT OF WAY US-59: OVER RUSSEL CREEK APPROX. 1.3 MILES SOUTH OF THE 23126(05) FFY 2012 OKLAHOMA/KANSAS STATE LINE (RW FOR 2312604) CRAIG Div. 8 US059 0.150 Mi. Let 06/2012 $249,260 UTILITIES US-59: OVER RUSSEL CREEK APPROX. 1.3 MILES SOUTH OF THE 23126(06) FFY 2012 OKLAHOMA/KANSAS STATE LINE (UT FOR 2312604) CRAIG Div. 8 US059 0.150 Mi. Let 06/2012 $140,080 RIGHT OF WAY SH-10: EAST FORK OF BIG CREEK, 16 MILES WEST OF US-59(RW FOR 27069(04) 27069(05) FFY 2012 CRAIG Div. 8 SH010 0.300 Mi. Let 03/2012 $53,000 UTILITIES SH10: EAST FORK OF BIG CREEK, 16 MILES WEST OF SH-59(UT FOR 27069(04) 27069(06) FFY 2012 CRAIG Div. 8 SH010 0.300 Mi. Let 03/2012 $53,000 RIGHT OF WAY SH-51: COTTONWOOD CREEK, 8.5 MILES EAST OF JCT. SH-99 (RW FOR 27067(05) FFY 2012 2706704) CREEK Div. 8 SH051 0.250 Mi. Let 11/2011 $53,000 UTILITIES SH-51: COTTONWOOD CREEK, 8.5 MILES EAST OF JCT. SH-99(UT FOR 27067(04) 27067(06) FFY 2012 CREEK Div. 8 SH051 0.250 Mi. Let 11/2011 $53,000 BRIDGE PAINTING SH 99 OVER CIMARRON RIVER, 4.4 MI EAST OF PAYNE C/L 28932(04) FFY 2012 CREEK Div. 8 SH099 0.100 Mi. Let 07/2012 $440,000 GRADE, DRAIN & SURFACE US-183: FR WASHITA RIVER EXT NORTH THOUGH ARAPAHO(RECONST TO 09278(04) FFY 2012 4-LANE UNDIVIDED) CUSTER Div. 5 US183 3.050 Mi. Let 02/2012 $7,335,580 BRIDGE WATER PROOF SEAL DIVISION 5: BRIDGE WATER PROOF SEAL - SITES TO BE DETERMINED 24426(04) FFY 2012 CUSTER Div. 5 0.000 Mi. Let 04/2012 $125,345 BRIDGE REPAIR I-40: BRIDGE REPAIR AT EAST BOUND OFF RAMP AT MP 65 IN CLINTON. 28904(04) FFY 2012 CUSTER Div. 5 IS040 0.100 Mi. Let 04/2012 $388,000 RIGHT OF WAY CLEARANCE SH-10: OVER ELK RIVER APPROX 1.35 MILES SOUTH OF OTTAWA C/LROW 10441(08) FFY 2012 CLEARANCE FOR 1044104 DELAWARE Div. 8 SH010 0.340 Mi. Let 09/2012 $100,000 RIGHT OF WAY SH-85: OVER DUCK CR, 3.2 MILES EAST & NORTH OF THE CRAIG C/L (RW FOR 24147(05) FFY 2012 2414704) DELAWARE Div. 8 SH085 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH-85: OVER DUCK CR, 3.2 MILES EAST & NORTH OF THE CRAIG C/L (UT FOR 24147(06) FFY 2012 2414704) DELAWARE Div. 8 SH085 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH 3/US 270 FROM 2.0 MI NORTH OF THE EAST SH 51 JCT SOUTHEAST 8.0 MIUT 17671(12) FFY 2012 FOR 17671(09) (PARALLEL LANES) SMC 80/20 DEWEY Div. 5 US270 8.000 Mi. Let 11/2011 $470,122 UTILITIES SH 3/US 270 FROM 6.0 MI SOUTH OF SH 51 SOUTHEAST 8.0 MIUT FOR 17671(13) 17671(16) FFY 2012 (PARALLEL LANES) SMC 80/20 DEWEY Div. 5 US270 8.000 Mi. Let 11/2011 $470,122 INTERSECT MODIF US-270/SH-3: INTERSECTION MODIFICATION AT THE SH-51 EAST JCT(FOR A 26491(04) FFY 2012 FOUR LANE DIVIDED SECTION ON US-270) DEWEY Div. 5 US270 0.500 Mi. Let 09/2012 $2,947,352 BRIDGE & APPROACHES US-60: OVER SOUTHBOUND US 64, 3.8 MILES NORTH OF JCT. US-412 23300(04) FFY 2012 GARFIELD Div. 4 US060 0.100 Mi. Let 03/2012 $2,956,680 RIGHT OF WAY SH-45 OVER AN UNNAMED CR, APPROX. 2.3 MI EAST OF THE ALFALFA C/L RW 24162(05) FFY 2012 FOR 24162(04) GARFIELD Div. 4 SH045 0.100 Mi. Let 11/2011 $159,000 UTILITIES SH-45 OVER AN UNNAMED CR, APPROX. 2.3 MI EAST OF THE ALFALFA C/L UT 24162(06) FFY 2012 FOR 24162(04) GARFIELD Div. 4 SH045 0.100 Mi. Let 11/2011 $159,000 RIGHT OF WAY SH-76: FROM SH-19, NORTH 3.0 MI INTO MCCLAIN COUNTY (RW FOR 23264(04)) 23264(05) FFY 2012 GARVIN Div. 3 SH076 3.000 Mi. Let 05/2012 $4,017,000 UTILITIES SH-76: FROM SH-19, NORTH 3.0 MI INTO MCCLAIN COUNTY (UT FOR 23264(04)) 23264(06) FFY 2012 GARVIN Div. 3 SH076 3.000 Mi. Let 05/2012 $401,700 Wednesday, September 28, 2011 page 3 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES SH-37: OVER BUGGY CREEK, 0.6 MI. EAST OF US-81 20960(04) FFY 2012 GRADY Div. 7 SH037 0.050 Mi. Let 04/2012 $2,700,000 RIGHT OF WAY SH-19 OVER WASHITA RIVER AND WASHITA RIVER O'FLOW BEGIN APPROX 1.5 28038(05) FFY 2012 MIS NW OF GARVIN C/L EXTEND SW APPROX 0.88 MIS (RW FOR J.P. 28038(004)) GRADY Div. 7 SH019 0.880 Mi. Let 02/2012 $250,000 UTILITIES SH-19 OVER WASHITA RIVER AND WASHITA RIVER O'FLOW BEGIN APPROX 1.5 28038(06) FFY 2012 MIS NW OF GARVIN C/L EXTEND SW APPROX 0.88 MIS (UT FOR J.P. 28038(004)) GRADY Div. 7 SH019 0.880 Mi. Let 02/2012 $725,000 RIGHT OF WAY SH-11 FROM 13.0 MI EAST OF THE ALFALFA C/L, EAST TO US-81 IN MEDFORD 24163(08) FFY 2012 RW FOR 24163(04)(05)(06)(07) GRANT Div. 4 SH011 7.130 Mi. Let 11/2011 $530,000 UTILITIES SH-11 FROM 13.0 MI EAST OF THE ALFALFA C/L, EAST TO US-81 IN MEDFORD 24163(09) FFY 2012 UT FOR 24163(04)(05)(06)(07) GRANT Div. 4 SH011 7.130 Mi. Let 11/2011 $530,000 RIGHT OF WAY US-64 OVER AN UNNAMED CR, APPROX 3.5 MI EAST OF THE ALFALFA C/L RW 24178(05) FFY 2012 FOR 24178(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 UTILITIES US-64 OVER AN UNNAMED CR, APPROX 3.5 MI EAST OF THE ALFALFA C/L UT 24178(06) FFY 2012 FOR 24178(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 RIGHT OF WAY US-64 OVER AN UNNAMED CR, APPROX 5.5 MI EAST OF THE ALFALFA C/L RW 24179(05) FFY 2012 FOR 24179(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 UTILITIES US-64 OVER AN UNNAMED CR, APPROX 5.5 MI EAST OF THE ALFALFA C/L UT 24179(06) FFY 2012 FOR 24179(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 RIGHT OF WAY SH 149 AT BEAVER RIVER APPROX 2.44 MI E OF US-283 RW FOR 10448(04) 10448(05) FFY 2012 HARPER Div. 6 SH149 1.000 Mi. Let 03/2012 $25,750 UTILITIES SH 149 AT BEAVER RIVER APPROX 2.44 MI E OF US-283 UT FOR 10448(04) 10448(06) FFY 2012 HARPER Div. 6 SH149 1.000 Mi. Let 03/2012 $25,750 BRIDGE PAINTING DIVISION 6 BRIDGE PAINTING 20935(04) FFY 2012 HARPER Div. 6 0.000 Mi. Let 03/2012 $750,000 JOINT SEAL/REPAIR DIVISION 6 BRIDGE JOINT 21724(04) FFY 2012 HARPER Div. 6 0.000 Mi. Let 03/2012 $250,000 BRIDGE WATER PROOF SEAL DIVISION 6 BRIDGE SILANE (WATERPROOFING SEAL) 23274(09) FFY 2012 HARPER Div. 6 0.000 Mi. Let 04/2012 $53,000 SAFETY IMPROVEMENT DIVISION SIX SAFETY IMPROVEMENTS (SITES TO BE DETERMINED) 27002(05) FFY 2012 HARPER Div. 6 0.000 Mi. Let 04/2012 $250,000 RIGHT OF WAY SH-2: OVER BEAVER CREEK, 1.3 MILES WEST OF JCT SH-31RW FOR JP 27046(05) FFY 2012 27046(04) HASKELL Div. 1 SH002 0.400 Mi. Let 07/2012 $190,550 UTILITIES SH-2: OVER BEAVER CREEK, 1.3 MILES WEST OF JCT SH-31UT FOR JP 27046(06) FFY 2012 27046(04) HASKELL Div. 1 SH002 0.400 Mi. Let 07/2012 $185,400 RIGHT OF WAY SH-51 OVER TURKEY CR, 1.6 WEST OF US-81RW FOR 24211(05) 24211(06) FFY 2012 KINGFISHER Div. 4 SH051 0.100 Mi. Let 11/2011 $103,000 UTILITIES SH-51 OVER TURKEY CR, 1.6 WEST OF US-81UT FOR 24211(05) 24211(07) FFY 2012 KINGFISHER Div. 4 SH051 0.100 Mi. Let 11/2011 $103,000 RIGHT OF WAY SH 51: FROM US 81 IN HENNESSEY E. 7.53 MILESRW FOR 27945(04) 27945(05) FFY 2012 KINGFISHER Div. 4 SH051 7.530 Mi. Let 11/2011 $412,000 UTILITIES SH 51: FROM US 81 IN HENNESSEY E. 7.53 MILESUT FOR 27945(04) 27945(06) FFY 2012 KINGFISHER Div. 4 SH051 7.530 Mi. Let 11/2011 $412,000 GRADE, DRAIN & SURFACE US-183: FROM 1.5 MILES NORTH OF THE SH-9 WEST JCT AND EXT NORTH 3.0 16063(45) FFY 2012 MILES.(4 LANE DIVIDED SECTION)(SURFACING FOR 16063(44) KIOWA Div. 5 US183 3.000 Mi. Let 04/2012 $4,800,000 RIGHT OF WAY SH-9: OVER ELK CREEK, 12.0, 12.4, & 12.7 MIS EAST OF GREER C/LROW 20806(05) FFY 2012 20806(04) KIOWA Div. 5 SH009 1.200 Mi. Let 03/2012 $242,480 UTILITIES SH-9: OVER ELK CREEK, 12.0, 12.4, & 12.7 MIS EAST OF GREER C/LUT FOR 20806(06) FFY 2012 20806(04) KIOWA Div. 5 SH009 1.200 Mi. Let 03/2012 $210,384 GRADE, DRAIN & SURFACE SH-82 BEG APPROX. 6.4 MILE NORTH OF US-270 & EXT NORTH APPROX 0.7 MILE 00464(14) FFY 2012 (LANDSLIDE REPAIR) LATIMER Div. 2 SH082 0.700 Mi. Let 06/2012 $7,004,000 Wednesday, September 28, 2011 page 4 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt GRADE,DRAINING,BRIDGE & SURFACE SH-1 OVER 2 ROCK CREEKS, APPROX. .16 MILE WEST OF THELEFLORE C/L & .16 21735(04) FFY 2012 MILE EAST OF THE LATIMER C/L LATIMER Div. 2 SH001 0.100 Mi. Let 08/2012 $5,150,000 RIGHT OF WAY US-59 FROM SUNSET CORNERS EXTEND WEST. (RECONST TO 4 LANE 17127(13) FFY 2012 DIVIDED) RW FOR JP# 17127(04) LEFLORE Div. 2 US059 5.000 Mi. Let 08/2012 $2,266,000 UTILITIES US 59 FROM SUNSET CORNERS EXTEND WEST. (RECONST TO 4 LANE) UT FOR 17127(14) FFY 2012 17127(04) LEFLORE Div. 2 US059 5.000 Mi. Let 08/2012 $412,000 RIGHT OF WAY SH-63 FROM TALIHINA EAST 5.0 MI RW FOR 24213(04) 24213(05) FFY 2012 LEFLORE Div. 2 SH063 5.000 Mi. Let 07/2012 $1,060,000 UTILITIES SH-63 FROM TALIHINA EAST 5.0 MI UT FOR 24213(04) 24213(06) FFY 2012 LEFLORE Div. 2 SH063 5.000 Mi. Let 07/2012 $212,000 WIDEN, RESURFACE & BRIDGE US-177 OVER SPRING CREEK & DEEP FORK NORTH CANADIAN RIVER, 0.24 & 24180(08) FFY 2012 0.53 MI NORTH OF SH-66 LINCOLN Div. 3 US177 0.740 Mi. Let 01/2012 $5,053,600 CROSSING IMPR. & R/R SIGNALS US-177 OVER SPRING CREEK & DEEP FORK NORTH CANADIAN RIVER, 0.24 & 24180(11) FFY 2012 0.53 MINORTH OF SH-66 (RR XING WITHIN 24180(08) (AARDOT = 668848L) LINCOLN Div. 3 US177 0.740 Mi. Let 01/2012 $275,000 WIDEN & RESURFACE US-62: FROM 0.05 MI EAST OF SH-102, EAST .46 MI (100% TRIBAL FUNDS) 24228(07) FFY 2012 LINCOLN Div. 3 US062 0.460 Mi. Let 08/2012 $1,130,800 GRADE, DRAIN & SURFACE US-62/SH-102 INTERSECTION RECONSTRUCTION, 2.97 MI EAST OF OKLAHOMA 24228(10) FFY 2012 C/L LINCOLN Div. 3 US062 0.240 Mi. Let 08/2012 $1,460,000 RIGHT OF WAY SH-33: OVER COTTONWOOD CREEK, NOBLE STREET RAILROAD IN 21860(05) FFY 2012 GUTHRIE.ROW FOR 21860(04) LOGAN Div. 4 SH033 0.100 Mi. Let 01/2012 $1,409,320 UTILITIES SH-33: OVER COTTONWOOD CREEK, NOBLE STREET RAILROAD IN GUTHRIE.UT 21860(06) FFY 2012 FOR 21860(04) LOGAN Div. 4 SH033 0.100 Mi. Let 01/2012 $1,368,745 RIGHT OF WAY SH-74 OVER SKELETON CR, APPROX 13.5 MI NORTH OF SH-33 RW FOR 24216(05) FFY 2012 24216(04) LOGAN Div. 4 SH074 0.100 Mi. Let 11/2011 $159,000 UTILITIES SH-74 OVER SKELETON CR, APPROX 13.5 MI NORTH OF SH-33 UT FOR 24216(06) FFY 2012 24216(04) LOGAN Div. 4 SH074 0.100 Mi. Let 11/2011 $159,000 SHOULDER IMPROVEMENT & RESURFACE SH-33: ADD SHOULDERS AND RESURFACE FROM 4.51 MI. E. OF THE KINGFISHER 24381(04) FFY 2012 C/L E. 1 MI. TO SH-74 LOGAN Div. 4 SH033 1.000 Mi. Let 01/2012 $824,000 RESURFACE SH0: RESURFACING FROM EW 73 E. 1.1 MIS. IN COYLE (INCLUDES PEDESTRIAN 27729(04) FFY 2012 IMPROVEMENTS) LOGAN Div. 4 SH000 1.100 Mi. Let 08/2012 $600,000 RIGHT OF WAY SH-32: BEG APPROX 3.89 MILE EAST OF SH-96 & EXT. EAST 4.1 MILE(RW FOR 10147(08) FFY 2012 10147(05)) LOVE Div. 7 SH032 4.100 Mi. Let 05/2012 $260,000 UTILITIES SH-32: BEG APPROX 3.89 MILE EAST OF SH-96 & EXT. EAST 4.1 MILE(UT FOR 10147(09) FFY 2012 10147(05)) LOVE Div. 7 SH032 4.100 Mi. Let 05/2012 $300,000 RIGHT OF WAY I-35 INTERCHANGE AT ROGERS ROAD, 3.24 MILES N. OF TEXAS STATE LINERW 28584(05) FFY 2012 FOR 28584(04) (TRIBAL FUNDING) LOVE Div. 7 IS035 1.450 Mi. Let 10/2011 $4,087,000 UTILITIES I-35 INTERCHANGE AT ROGERS ROAD, 3.24 MILES N. OF TEXAS STATE LINEUT 28584(06) FFY 2012 FOR 28584(04) (TRIBAL FUNDING) LOVE Div. 7 IS035 1.450 Mi. Let 10/2011 $485,300 GRADE & DRAIN SH-15/US-412: FR WOODWARD C/L EXT. EAST 2.04 MILES 10067(08) FFY 2012 MAJOR Div. 6 US412 2.040 Mi. Let 08/2012 $3,295,207 BRIDGE & APPROACHES SH-58 OVER INDIAN CREEK APPROX. 5.7 MILE NORTH OF JCT SH-58/SH-8. 24230(04) FFY 2012 MAJOR Div. 6 SH058 0.400 Mi. Let 06/2012 $3,281,250 RIGHT OF WAY SH-199: FROM 1.0 MI EAST OF MADILL EAST 5.0 MI RW FOR 24410(04) 24410(05) FFY 2012 MARSHALL Div. 2 SH199 5.000 Mi. Let 08/2012 $681,050 UTILITIES SH-199: FROM 1.0 MI EAST OF MADILL EAST 5.0 MI UT FOR 24410(04) 24410(06) FFY 2012 MARSHALL Div. 2 SH199 5.000 Mi. Let 08/2012 $265,000 RIGHT OF WAY SH-199: FROM 5.17 MI EAST OF MADILL, EAST 6.0 MI RW FOR 24411(04) 24411(05) FFY 2012 MARSHALL Div. 2 SH199 6.000 Mi. Let 08/2012 $1,700,000 UTILITIES SH-199: FROM 5.17 MI EAST OF MADILL, EAST 6.0 MI UT FOR 24411(04) 24411(06) FFY 2012 MARSHALL Div. 2 SH199 6.000 Mi. Let 08/2012 $500,000 Wednesday, September 28, 2011 page 5 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY CLEARANCE SH-28: OVER BIG CABIN CREEK APPROX. 7.5 MILE EAST OF JCT OF 21910(07) FFY 2012 SH-28/US-69.ROW CLEARANCE FOR 2191004 MAYES Div. 8 SH028 0.150 Mi. Let 09/2012 $100,000 BRIDGE & APPROACHES SH-82: OVER GRAND RIVER, APPROX. 2.7 MILES NORTH OF JCT. OF 21911(04) FFY 2012 SH-82/SH-20 MAYES Div. 8 SH082 0.160 Mi. Let 09/2012 $6,784,000 RIGHT OF WAY SH-69A: OVER PRYOR CREEK, 4.2 MILES EAST OF US-69 (RW FOR 2423504) 24235(05) FFY 2012 MAYES Div. 8 SH069A 0.500 Mi. Let 11/2011 $93,280 UTILITIES SH-69A OVER PRYOR CREEK, 4.2 MILES EAST OF US-69UT FOR 24235(04) 24235(06) FFY 2012 MAYES Div. 8 SH069A 0.500 Mi. Let 11/2011 $1,316,017 RIGHT OF WAY I-35/SH-9 INTERCHANGE (PHASE III) (WEST=19076(04)) (RW FOR 19314(04) 19314(06) FFY 2012 MCCLAIN Div. 3 IS035 0.200 Mi. Let 07/2012 $10,000,000 UTILITIES I-35/SH-9 INTERCHANGE (PHASE III) (WEST=19076(04)) (UT FOR 19314(04)) 19314(07) FFY 2012 MCCLAIN Div. 3 IS035 0.200 Mi. Let 07/2012 $825,000 RIGHT OF WAY SH-76 OVER NORTH FORK WALNUT CREEK, 2.87 MI NORTH OF US-62 (RW FOR 27936(05) FFY 2012 27936(04)) MCCLAIN Div. 3 SH076 0.020 Mi. Let 06/2012 $206,000 UTILITIES SH-76 OVER NORTH FORK WALNUT CREEK, 2.87 MI NORTH OF US-62 (UT FOR 27936(06) FFY 2012 27936(04)) MCCLAIN Div. 3 SH076 0.020 Mi. Let 06/2012 $103,000 RIGHT OF WAY US-70 FROM CHOCTAW COUNTY LINE EXTEND EAST 2.4 MILES (PARALLEL 18853(05) FFY 2012 LANES) R/W FOR 18853(04) MCCURTAIN Div. 2 US070 2.400 Mi. Let 08/2012 $1,030,000 UTILITIES US-70 FROM CHOCTAW COUNTY LINE EXTEND EAST 2.4 MILES (PARALLEL 18853(06) FFY 2012 LANES) UT FOR 18853(04) MCCURTAIN Div. 2 US070 2.400 Mi. Let 08/2012 $206,000 RIGHT OF WAY SH-37 OVER THE RED RIVER RW FOR 26178(04) 26178(05) FFY 2012 MCCURTAIN Div. 2 SH037 0.200 Mi. Let 06/2012 $50,000 UTILITIES SH-37 OVER THE RED RIVER UT FOR 26178(04) 26178(06) FFY 2012 MCCURTAIN Div. 2 SH037 0.200 Mi. Let 06/2012 $50,000 RIGHT OF WAY US-259 OVER RED RIVER AT OKLAHOMA/TEXAS STATE LINERW FOR 27915(05) 27915(05) FFY 2012 MCCURTAIN Div. 2 US259 0.500 Mi. Let 05/2012 $51,500 UTILITIES US-259 OVER RED RIVER AT OKLAHOMA/TEXAS STATE LINEUT FOR 27915(05) 27915(06) FFY 2012 MCCURTAIN Div. 2 US259 0.500 Mi. Let 05/2012 $51,500 RIGHT OF WAY US-266: OVER PUTTY CREEK, 4.7 MI. E OF OKMULGEE C/L(RW FOR: 20731 (04)) 21731(05) FFY 2012 MCINTOSH Div. 1 US266 0.200 Mi. Let 02/2012 $120,840 UTILITIES US-266: OVER PUTTY CREEK, 4.7 MI. E OF OKMULGEE C/L(UT FOR: 20731 (04)) 21731(06) FFY 2012 MCINTOSH Div. 1 US266 0.200 Mi. Let 02/2012 $132,924 RIGHT OF WAY US-266: OVER WAYNE CREEK, 6.2 MILES EAST OF OKMULGEE COUNTY LINE RW 27225(05) FFY 2012 FOR 27037(04) MCINTOSH Div. 1 US266 0.500 Mi. Let 01/2012 $196,100 UTILITIES US-266: OVER WAYNE CREEK, 6.2 MILES EAST OF OKMULGEE COUNTY LINE UT 27225(06) FFY 2012 FOR 27037(04) MCINTOSH Div. 1 US266 0.500 Mi. Let 01/2012 $116,600 BRIDGE WATER PROOF SEAL DIVISION WIDE (BRIDGE WATERPROOF SEAL), FOR DIVISION (1) SILANE 23105(09) FFY 2012 MUSKOGEE Div. 1 0.100 Mi. Let 04/2012 $51,500 SURFACE US-64 FROM BOUNDARY STREET IN PERRY & EXT EAST 7.0 MILE SURFACING 20311(09) FFY 2012 FOR 20311(04) NOBLE Div. 4 US064 7.000 Mi. Let 03/2012 $11,130,963 RIGHT OF WAY US-177: FR US-64 (BILLS CORNER), EXT NORTH 6.1 MILES R/W FOR 20983(04) 20983(05) FFY 2012 NOBLE Div. 4 US177 6.100 Mi. Let 10/2011 $1,376,274 UTILITIES US-177: FR US-64 (BILLS CORNER), EXT NORTH 6.1 MILES UT FOR 20983(04) 20983(06) FFY 2012 NOBLE Div. 4 US177 6.100 Mi. Let 10/2011 $1,099,879 BRIDGE & APPROACHES US-77: OVER BLACK BEAR CREEK APPROX. 4.2 MILE NORTH OF JCT OF 21861(04) FFY 2012 US-77/US-64 NOBLE Div. 4 US077 0.070 Mi. Let 01/2012 $2,044,186 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOF SEAL FOR DIVISION (4) SILANE 23306(09) FFY 2012 NOBLE Div. 4 0.100 Mi. Let 03/2012 $106,000 BRIDGE PAINTING DIVISION (4): BRIDGE PAINTING PROJECTS 23316(04) FFY 2012 NOBLE Div. 4 0.100 Mi. Let 03/2012 $1,060,000 Wednesday, September 28, 2011 page 6 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY SH-164 OVER EAST WARREN CR, 1.3 MI EAST OF THE GARFIELD C/L RW FOR 24237(05) FFY 2012 24237(04) NOBLE Div. 4 SH164 0.100 Mi. Let 11/2011 $116,083 UTILITIES SH-164 OVER EAST WARREN CR, 1.3 MI EAST OF THE GARFIELD C/L UT FOR 24237(06) FFY 2012 24237(04) NOBLE Div. 4 SH164 0.100 Mi. Let 11/2011 $116,083 RIGHT OF WAY SH-156 OVER DEADMAN CR, 0.8 MI SOUTH OF THE KAY C/L RW FOR 24249(04) 24249(05) FFY 2012 NOBLE Div. 4 SH156 0.100 Mi. Let 11/2011 $159,000 UTILITIES SH-156 OVER DEADMAN CR, 0.8 MI SOUTH OF THE KAY C/L UT FOR 24249(04) 24249(06) FFY 2012 NOBLE Div. 4 SH156 0.100 Mi. Let 11/2011 $159,000 CABLE BARRIER CABLE BARRIER: I-35 FROM MM 180 TO MM 182 28977(04) FFY 2012 NOBLE Div. 4 IS035 2.000 Mi. Let 07/2012 $250,000 BRIDGE REHABILITATION SH-28: OVER BIG CREEK APPROX. 4.5 MILES NORTH OF JCT. OF SH-28/US-60 23128(04) FFY 2012 NOWATA Div. 8 SH028 0.120 Mi. Let 09/2012 $1,694,641 RIGHT OF WAY SH-28: OVER THE VERDIGRIS RIVER, 1.0 MILE EAST OF US-169RW FOR 24252(05) FFY 2012 24252(04) NOWATA Div. 8 SH028 0.500 Mi. Let 11/2011 $215,180 UTILITIES SH-28: OVER THE VERDIGRIS RIVER, 1.0 MILE EAST OF US-169UT FOR 24252(06) FFY 2012 24252(04) NOWATA Div. 8 SH028 0.500 Mi. Let 11/2011 $143,100 RIGHT OF WAY US-169: HICKORY CREEK,13.5 MILES NORTH OF JCT. US-60ROW FOR 24750(04) 24750(05) FFY 2012 NOWATA Div. 8 US169 0.250 Mi. Let 04/2012 $53,000 UTILITIES US-169: HICKORY CREEK,13.5 MILES NORTH OF JCT. US-60UT FOR 24750(04) 24750(06) FFY 2012 NOWATA Div. 8 US169 0.250 Mi. Let 04/2012 $53,000 UTILITIES I-235: NW 50TH AND BNSF BRIDGES AND APPROACHES (SEGMENT 4A) UT FOR 09033(12) FFY 2012 09033(16) OKLAHOMA Div. 4 IS235 0.200 Mi. Let 11/2011 $974,400 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 3.4, GR, DR, BR & SURFACE FROM AGNEW WEST 0.7 MI 17428(58) FFY 2012 OKLAHOMA Div. 4 IS040 0.750 Mi. Let 04/2012 $21,528,822 BRIDGE & APPROACHES I-40 CROSSTOWN: DECONSTRUCTION OF THE EXISTING X-TOWN BRIDGE 17428(77) FFY 2012 OKLAHOMA Div. 4 IS040 1.520 Mi. Let 04/2012 $12,000,000 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 3.5, WEST CONNECTION OF NEW XTOWN WITH THE 17428(81) FFY 2012 BOULEVARD OKLAHOMA Div. 4 IS040 0.750 Mi. Let 01/2012 $11,317,219 RIGHT OF WAY I-40: FR MILE MARKER 165 TO 167, LN ADDS & RECONSTRUCTION OF CHOCTAW 20324(05) FFY 2012 RD INTERCHANGE (RW FOR 20324(04) OKLAHOMA Div. 4 IS040 2.000 Mi. Let 11/2011 $2,120,000 UTILITIES I-40: FR MILE MARKER 165 TO 167, LN ADDS & RECONSTRUCTION OF CHOCTAW 20324(06) FFY 2012 RD INTERCHANGE (UT FOR 20324(04)) OKLAHOMA Div. 4 IS040 2.000 Mi. Let 11/2011 $1,060,000 GRADE, DRAIN & SURFACE I-235/HARRISON AVE. NORTH BOUND OFF RAMP RELOCATION TO 10TH STREET 23660(04) FFY 2012 IN OKLAHOMA CITY OKLAHOMA Div. 4 IS235 0.200 Mi. Let 07/2012 $3,320,603 RIGHT OF WAY SH-66: ADD SHOULDERS & RESURFACE BEG APPROX. 14.13 MILE EAST OF I-35 24357(05) FFY 2012 & EXT. EAST APPROX. 2.37 MILE TO THE LINCOLN C/L (RW FOR 24357(04)) OKLAHOMA Div. 4 SH066 2.370 Mi. Let 03/2012 $810,865 UTILITIES SH-66: ADD SHOULDERS & RESURFACE BEG APPROX. 14.13 MILE EAST OF I-35 24357(06) FFY 2012 & EXT. EAST APPROX. 2.37 MILE TO THE LINCOLN C/L (UT FOR 24357(04)) OKLAHOMA Div. 4 SH066 2.370 Mi. Let 03/2012 $659,927 STRIPING & PAVEMENT MARKING OKLAHOMA CITY: INSTALL PAVEMENT MARKINGS ON THE INTERSTATE 26457(04) FFY 2012 HIGHWAYS AT VARIOUS LOCATION IN THE OKC METRO AREA OKLAHOMA Div. 4 IS040 1.000 Mi. Let 01/2012 $649,075 CABLE BARRIER I-240: CABLE BARRIER FROM SOONER RD. E. 3.0 MIS. TO DOUGLAS BLVD. 28975(04) FFY 2012 OKLAHOMA Div. 4 IS240 3.000 Mi. Let 07/2012 $450,000 RIGHT OF WAY US-266: OVER HOFFMAN CREEK APPROX. 8.7 MI. EAST OF US-62(RW FOR 21739(05) FFY 2012 212739(04)) OKMULGEE Div. 1 US266 0.200 Mi. Let 02/2012 $27,000 UTILITIES US-266: OVER HOFFMAN CREEK APPROX 8.7 MI. EAST OF US-62(UT FOR 21739(06) FFY 2012 21739(04)) OKMULGEE Div. 1 US266 0.200 Mi. Let 02/2012 $16,700 RIGHT OF WAY US-75A BEG AT JCT US-75A/SH-16 & EXTEND NORTH 8.0 MILE TO THE CREEK 24369(06) FFY 2012 C/L.(RW FOR 24369(04)(05)) OKMULGEE Div. 1 US075A 8.000 Mi. Let 11/2011 $3,100,000 UTILITIES US-75A BEG AT JCT US-75A/SH-16 & EXTEND NORTH 8.0 MILE TO THE CREEK 24369(07) FFY 2012 C/L.(UT FOR 24369(04)(05)) OKMULGEE Div. 1 US075A 8.000 Mi. Let 11/2011 $980,000 Wednesday, September 28, 2011 page 7 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE PAINTING I-40: COUNTY BRIDGE OVER/I-40 UNDER, 2.6 MILES EAST OF OKFUSKEE 27034(04) FFY 2012 COUNTY LINE (INCL FLAME STR BEAM REPAIR) OKMULGEE Div. 1 IS040 0.040 Mi. Let 02/2012 $164,300 BRIDGE & APPROACHES SH-18: OVER LOST MAN CREEK, APPROX. 2.0 MILES NORTH OF JCT. OF 21913(04) FFY 2012 SH-18/US-60 OSAGE Div. 8 SH018 0.050 Mi. Let 06/2012 $1,258,220 RIGHT OF WAY SH-99: OVER AN ABANDONED RR, 11.6 MILES NORTH OF SH-20RW FOR 24261(05) FFY 2012 24261(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-99: OVER AN ABANDONED RR, 11.6 MILES NORTH OF SH-20UT FOR 24261(06) FFY 2012 24261(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 RIGHT OF WAY SH-18: OVER SALT CREEK, 2.0 MILES NORTH OF THE PAWNEE C/LRW FOR 24262(05) FFY 2012 24262(04) OSAGE Div. 8 SH018 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-18: OVER SALT CREEK, 2.0 MILES NORTH OF THE PAWNEE C/LUT FOR 24262(06) FFY 2012 24262(04) OSAGE Div. 8 SH018 0.500 Mi. Let 11/2011 $106,000 RIGHT OF WAY SH-99: OVER BIRCH CREEK, 1.4 MILES SOUTH OF SOUTH SH-11 RW FOR 24263(05) FFY 2012 24263(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-99: OVER BIRCH CREEK, 1.4 MILES SOUTH OF SOUTH SH-11 UT FOR 24263(06) FFY 2012 24263(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 RIGHT OF WAY SH-99: OVER ROCK CREEK, 6.6 MILES NORTH OF US-60 RW FOR 24264(04) 24264(05) FFY 2012 OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-99: OVER ROCK CREEK, 6.6 MILES NORTH OF US-60 UT FOR 24264(04) 24264(06) FFY 2012 OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 BRIDGE PAINTING SH 99 OVER PENN CREEK, .3 MILES NORTH OF JCT SH 20 28932(05) FFY 2012 OSAGE Div. 8 SH099 0.100 Mi. Let 07/2012 $190,000 BRIDGE & APPROACHES US-69: OVER TAR CREEK, APPROX. 7.7 MILES NORTH OF JCT. US-69/US-59 21916(04) FFY 2012 OTTAWA Div. 8 US069 0.060 Mi. Let 09/2012 $2,818,447 BRIDGE & APPROACHES SH-10: OVER SYCAMORE CREEK, APPROX. 8.3 MILES NORTH OF THE 21918(04) FFY 2012 DELAWARE COUNTY LINE OTTAWA Div. 8 SH010 0.050 Mi. Let 07/2012 $2,836,460 RIGHT OF WAY SH-10: OVER SPRING RIVER, 3.7 MILES WEST OF SH-10CRW FOR 24272(04) 24272(05) FFY 2012 (TIED W/ 2427805) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $265,000 UTILITIES SH-10: OVER SPRING RIVER, 3.7 MILES WEST OF SH-10CUT FOR 24272(04) 24272(06) FFY 2012 (TIED W/ 2427806) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $265,000 RIGHT OF WAY US-60: OVER HORSE CREEK, 2.6 MILES NORTH OF THE DELAWARE C/LRW FOR 24273(05) FFY 2012 24273(04) OTTAWA Div. 8 US060 0.500 Mi. Let 01/2012 $106,000 UTILITIES US-60: OVER HORSE CREEK, 2.6 MILES NORTH OF THE DELAWARE C/LUT FOR 24273(06) FFY 2012 24273(04) OTTAWA Div. 8 US060 0.500 Mi. Let 01/2012 $106,000 RIGHT OF WAY US-59 OVER HORSE CR. TRIB, 4.5 MI N.W. OF THE DELAWARE C/LRW FOR 24274(05) FFY 2012 24274(04) OTTAWA Div. 8 US059 0.500 Mi. Let 01/2012 $106,000 UTILITIES US-59 OVER HORSE CR. TRIB, 4.5 MI N.W. OF THE DELAWARE C/LUT FOR 24274(06) FFY 2012 24274(04) OTTAWA Div. 8 US059 0.500 Mi. Let 01/2012 $106,000 RIGHT OF WAY SH-137: OVER AN UNNAMED CREEK, 4.0 MILES NORTH OF US-60RW FOR 24275(05) FFY 2012 24275(04) OTTAWA Div. 8 SH137 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH-137: OVER AN UNNAMED CREEK, 4.0 MILES NORTH OF US-60UT FOR 24275(06) FFY 2012 24275(04) OTTAWA Div. 8 SH137 0.500 Mi. Let 01/2012 $106,000 RIGHT OF WAY SH-10C OVER LOST CR, 3.3 MILES EAST OF SH-10RW FOR 24277(04) 24277(05) FFY 2012 OTTAWA Div. 8 SH010C 0.500 Mi. Let 01/2012 $371,000 UTILITIES SH-10C OVER LOST CR, 3.3 MILES EAST OF SH-10UT FOR 24277(04) 24277(06) FFY 2012 OTTAWA Div. 8 SH010C 0.500 Mi. Let 01/2012 $371,000 RIGHT OF WAY SH-10 OVER SPRING RIVER O'FLOW, 3.5 MI WEST OF SH-10CRW FOR 24278(04) 24278(05) FFY 2012 (TIED W/ 2427205) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH-10 OVER SPRING RIVER O'FLOW, 3.5 MI WEST OF SH-10CUT FOR 24278(04) 24278(06) FFY 2012 (TIED W/ 2427206) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $106,000 Wednesday, September 28, 2011 page 8 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES US-64: OVER PANTHER CREEK, 0.9 MILES EAST OF NOBLE COUNTY LINE (TIED 20896(04) FFY 2012 W/ 2089804) PAWNEE Div. 8 US064 0.020 Mi. Let 09/2012 $1,123,600 BRIDGE & APPROACHES US-64: OVER BNSF RAILROAD, 6.1 MILES EAST OF SH-18 20897(04) FFY 2012 PAWNEE Div. 8 US064 0.030 Mi. Let 09/2012 $1,693,204 BRIDGE REPAIR US-64: OVER AN UNNAMED CREEK, 1.9 MILES EAST OF NOBLE COUNTY LINE 20898(04) FFY 2012 (BOX STR) (TIED W/ 20896(04) PAWNEE Div. 8 US064 0.010 Mi. Let 09/2012 $341,850 RIGHT OF WAY US-64: PEDESTRIAN BRIDGE OVER US-64, APPROX. 0.2 MILES SOUTH OFJCT. 23158(05) FFY 2012 US-64/SH-99 (RW FOR 2315804) PAWNEE Div. 8 US064 0.050 Mi. Let 07/2012 $409,940 UTILITIES US-64: PEDESTRIAN BRIDGE OVER US-64, APPROX. 0.2 MILES SOUTH OFJCT. 23158(06) FFY 2012 US-64/SH-99 (UT FOR 2315804) PAWNEE Div. 8 US064 0.050 Mi. Let 07/2012 $368,740 RIGHT OF WAY US-64 OVER AN UNNAMED CR, 2.5 MI EAST OF SH-99RW FOR 24321(04) 24321(05) FFY 2012 PAWNEE Div. 8 US064 0.500 Mi. Let 01/2012 $106,000 UTILITIES US-64 OVER AN UNNAMED CR, 2.5 MI EAST OF SH-99UT FOR 24321(04) 24321(06) FFY 2012 PAWNEE Div. 8 US064 0.500 Mi. Let 01/2012 $106,000 BRIDGE PAINTING SH 18 OVER COAL CREEK, 7.5 MILES NORTH OF JCT US 64 28934(04) FFY 2012 PAWNEE Div. 8 SH018 0.100 Mi. Let 08/2012 $120,000 GRADE,DRAINING,BRIDGE & SURFACE US-177: FROM THE LINCOLN C/L N. TO THE PERKINS CITY LIMITS, INCLUDES 20332(04) FFY 2012 BRIDGE REPLACEMENTS AT THE CIMARRON RIVER & DUGOUT CREEK PAYNE Div. 4 US177 2.210 Mi. Let 08/2012 $7,135,181 GRADE, DRAIN & SURFACE US-177: BEG. APPROX. 1.5 MILE SOUTH OF JCT OF SH-33 & EXTENDING NORTH 21932(04) FFY 2012 PAYNE Div. 4 US177 1.500 Mi. Let 08/2012 $6,188,679 CABLE BARRIER I-35: CABLE BARRIER FROM MM 170 TO MM 174 28976(04) FFY 2012 PAYNE Div. 4 IS035 4.000 Mi. Let 07/2012 $500,000 INTERCHANGE C-TREE ROAD OVER US-69 AT MCALESTER ARMY AMMUNITION PLANT 28995(04) FFY 2012 PITTSBURG Div. 2 US069 0.200 Mi. Let 09/2012 $2,650,000 RIGHT OF WAY C-TREE ROAD OVER US-69 AT MCALESTER ARMY AMMUNITION PLANT RW 28995(05) FFY 2012 FOR 28995(04) PITTSBURG Div. 2 US069 0.200 Mi. Let 07/2012 $50,000 UTILITIES C-TREE ROAD OVER US-69 AT MCALESTER ARMY AMMUNITION PLANT UT FOR 28995(06) FFY 2012 28995(04) PITTSBURG Div. 2 US069 0.200 Mi. Let 07/2012 $50,000 BRIDGE PAINTING DIVISION 3: BRIDGE PAINT PROJECTS 21925(04) FFY 2012 PONTOTOC Div. 3 0.000 Mi. Let 04/2012 $700,000 JOINT SEAL/REPAIR DIVISION 3: BRIDGE JOINT SEAL/REPAIR PROJECTS 21926(04) FFY 2012 PONTOTOC Div. 3 0.000 Mi. Let 04/2012 $300,000 BRIDGE WATER PROOF SEAL DIVISION 3: BRIDGE WATER PROOFING SEAL (SILANE) 22973(10) FFY 2012 PONTOTOC Div. 3 0.000 Mi. Let 04/2012 $100,000 RIGHT OF WAY I-40: INGRESS/EGRESS IMPROVEMENT AT MILE MARK 187 (RW FOR 27133(04) 27133(05) FFY 2012 POTTAWATOMIE Div. 3 IS040 1.160 Mi. Let 04/2012 $2,400,000 UTILITIES I-40: INGRESS/EGRESS IMPROVEMENT AT MILE MARK 187 (UT FOR 27133(04) 27133(06) FFY 2012 POTTAWATOMIE Div. 3 IS040 1.160 Mi. Let 04/2012 $140,000 BRIDGE WATER PROOF SEAL DIVISION WIDE (BRIDGE WATERPROOF SEAL), FOR DIVISION (2) SILANE 23144(09) FFY 2012 PUSHMATAHA Div. 2 0.100 Mi. Let 04/2012 $53,000 JOINT SEAL/REPAIR DIVISION 2 - BRIDGE MAINTENANCE - VARIOUS LOCATIONS (JOINT REPAIR) 23145(05) FFY 2012 (16629,16633,15860,13511) PUSHMATAHA Div. 2 0.100 Mi. Let 01/2012 $200,000 BRIDGE PAINTING DIVISION 2 - MAINTENANCE - VARIOUS LOCATIONS BRIDGE PAINTING 23145(07) FFY 2012 (16629,16633,15860,13511,13499) PUSHMATAHA Div. 2 0.100 Mi. Let 01/2012 $800,000 RIGHT OF WAY US-271: OVER KIAMICHI RIVER, APPROX 2.0 MI NORTH OF SH-3 RW FOR 26346(05) FFY 2012 26346(04) PUSHMATAHA Div. 2 US271 0.100 Mi. Let 08/2012 $445,200 UTILITIES US-271: OVER KIAMICHI RIVER, APPROX 2.0 MI NORTH OF SH-3 UT FOR 26346(06) FFY 2012 26346(04) PUSHMATAHA Div. 2 US271 0.100 Mi. Let 08/2012 $53,000 BRIDGE & APPROACHES SH-33: OVER NINE-MILE CR APPROX. 11.4 MI EAST OF SH-33/US-283 JCT 21702(04) FFY 2012 ROGER MILLS Div. 5 SH033 0.500 Mi. Let 10/2011 $2,062,405 Wednesday, September 28, 2011 page 9 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY SH-47 OVER RUSH CREEK APPROX. 0.5 MILE SOUTH OF JCT SH-47/SH-30.(RW 24358(05) FFY 2012 FOR 24358(04)) ROGER MILLS Div. 5 SH047 0.500 Mi. Let 12/2011 $97,718 UTILITIES SH-47 OVER RUSH CREEK APPROX. 0.5 MILE SOUTH OF JCT SH-47/SH-30.(UT 24358(06) FFY 2012 FOR 24358(04)) ROGER MILLS Div. 5 SH047 0.500 Mi. Let 12/2011 $84,739 RIGHT OF WAY I-44: INTERCHANGE AT 163RD STREET IN THE CITY OF TULSA (RW FOR 20315(05) FFY 2012 20315(04) ( IM EARMARK) ROGERS Div. 8 IS044 0.040 Mi. Let 03/2012 $4,425,243 UTILITIES I-44: INTERCHANGE AT 163RD STREET UT FOR 20315(04) (IM EARMARK) 20315(06) FFY 2012 ROGERS Div. 8 IS044 0.040 Mi. Let 03/2012 $2,232,237 RIGHT OF WAY SH-20: INTERSECTION AT SH-20 & CLUBHOUSE/SOUTHAVEN ROAD, APPROX. 27167(05) FFY 2012 9.5 MILES EAST OF TULSA COUNTY LINE (RW FOR 27167(04) ROGERS Div. 8 SH020 0.100 Mi. Let 09/2012 $257,500 UTILITIES SH-20: INTERSECTION AT SH-20 & CLUBHOUSE/SOUTHAVEN ROAD, APPROX. 27167(06) FFY 2012 9.5 MILES EAST OF TULSA COUNTY LINE (UT FOR 27167(04) ROGERS Div. 8 SH020 0.100 Mi. Let 09/2012 $257,500 RIGHT OF WAY US-64: OVER BIG SALLISAW CREEK, 3.1 MILES WEST OF US-59 IN SALLISAW. 09242(15) FFY 2012 RW FOR 09242(06) SEQUOYAH Div. 1 US064 0.070 Mi. Let 02/2012 $297,398 UTILITIES US-64: OVER BIG SALLISAW CREEK, 3.1 MILES WEST OF US-59 IN SALLISAW.UT 09242(16) FFY 2012 FOR 09242(06) SEQUOYAH Div. 1 US064 0.070 Mi. Let 02/2012 $358,000 WIDEN, RESURFACE & BRIDGE SH-100: FROM GORE NORTH 6.25(EXTENDING 2 BRIDGE RCB STRUCTURES) 12531(04) FFY 2012 SEQUOYAH Div. 1 SH100 6.250 Mi. Let 08/2012 $10,150,676 UTILITIES US-81: SOUTH CONNECTION BYPASS, NORTHWESTERLY TO RELOCATED SH-7 20316(06) FFY 2012 AT 27THSTREET (UT FOR 20316(04) STEPHENS Div. 7 US081 1.600 Mi. Let 12/2011 $872,000 BRIDGE PAINTING DIVISION SEVEN BRIDGE PAINT (SITES TO BE DEFINED AT ALATER DATE) 20328(05) FFY 2012 STEPHENS Div. 7 0.000 Mi. Let 06/2012 $520,000 JOINT SEAL/REPAIR DIVISION SEVEN BRIDGE JOINT SEAL/REPAIR (SITES TO BE DEFINED AT 20328(08) FFY 2012 ALATER DATE) STEPHENS Div. 7 0.000 Mi. Let 06/2012 $400,000 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOFING SEAL FOR DIVISION 7 (FFY 2012) 23125(09) FFY 2012 STEPHENS Div. 7 0.000 Mi. Let 04/2012 $80,000 GRADE,DRAINING,BRIDGE & SURFACE I-44: AT LEWIS AVENUE (RECONSTRUCT TO 6 LANES) (IM EARMARK) 06374(47) FFY 2012 TULSA Div. 8 IS044 1.200 Mi. Let 06/2012 $51,697,928 BRIDGE REPAIR US-64: OVER EUCHEE CREEK, 6.4 MILES SOUTHEAST OF OSAGE COUNTY LINE 20925(04) FFY 2012 (BOX STR) TULSA Div. 8 US064 0.010 Mi. Let 06/2012 $636,000 RIGHT OF WAY SH-266 OVER US-169 APPROX. 5.8 MILE NORTH OF JCT US-169/I-44.(RW FOR 23167(05) FFY 2012 2316704) TULSA Div. 8 SH266 0.040 Mi. Let 05/2012 $409,940 UTILITIES SH-266 OVER US-169 APPROX. 5.8 MILE NORTH OF JCT US-169/I-44.(UT FOR 23167(06) FFY 2012 2316704) TULSA Div. 8 SH266 0.040 Mi. Let 05/2012 $368,740 SAFETY IMPROVEMENT SAFETY IMPROVEMENT PROJECTS WITHIN DIVISION 8(SITES TO BE SELECTED 23170(04) FFY 2012 LATER) TULSA Div. 8 0.000 Mi. Let 08/2012 $1,000,000 BRIDGE & APPROACHES I-244 OVER I-244 RAMP W-N APPROX. 5.39 MILE EAST OF JCT I-244/I-444. 23171(04) FFY 2012 TULSA Div. 8 IS244 0.050 Mi. Let 03/2012 $1,811,148 BRIDGE WATER PROOF SEAL 2012 DIVISION 8 SILANE PROJECTS (BRIDGES TO BE DETERMINED LATER) 23185(09) FFY 2012 TULSA Div. 8 0.000 Mi. Let 03/2012 $325,000 RIGHT OF WAY SH-11: OVER HOMINY CREEK APPROX. 7.4 MILES SOUTH OF THE WASHINGTON 24365(05) FFY 2012 C/L(RW FOR 2436504) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $248,230 UTILITIES SH-11: OVER HOMINY CREEK APPROX. 7.4 MILES SOUTH OF THE WASHINGTON 24365(06) FFY 2012 C/L(UT FOR 2436504) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $140,080 RIGHT OF WAY SH-11: OVER FLAT ROCK CREEK, APPROX. 15.2 MILES SOUTH OF THE 24365(08) FFY 2012 WASHINGTON C/L (RW FOR 2436507) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $248,230 UTILITIES SH-11: OVER FLAT ROCK CREEK, APPROX. 15.2 MILES SOUTH OF THE 24365(09) FFY 2012 WASHINGTON C/L (UT FOR 2436507) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $140,080 RIGHT OF WAY SH-11: DELAWARE CREEK, 11 MI. SOUTH OF WASHINGTON COUNTY LINEROW 27066(05) FFY 2012 FOR 27066(04) TULSA Div. 8 SH011 0.250 Mi. Let 04/2012 $53,000 Wednesday, September 28, 2011 page 10 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH-11: DELAWARE CREEK, 11 MI. SOUTH OF WASHINGTON COUNTY LINEUT 27066(06) FFY 2012 FOR 27066(04) TULSA Div. 8 SH011 0.250 Mi. Let 04/2012 $53,000 BRIDGE REHABILITATION I-244: I-244 E-S RAMP( I-444 UNDER), APPROX. 6.9 MI. NORTH OF I-44 (IM 27929(04) FFY 2012 EARMARK) TULSA Div. 8 IS244 0.250 Mi. Let 05/2012 $2,020,792 BRIDGE PAINTING GARNETT ROAD OVER I-244, .53 MILES EAST OF JCT US 169 28935(04) FFY 2012 TULSA Div. 8 IS244 0.100 Mi. Let 08/2012 $250,000 GRADE & DRAIN SH-51: FR TAYLOR'S FERRY AREA, APPROX 7.8 MILE EAST OF JCT 10006(07) FFY 2012 SH-51/US-69,EXT EAST TO SEQUOYAH STATE PARK IN CHEROKEE CO. WAGONER Div. 1 SH051 1.770 Mi. Let 06/2012 $11,742,000 BRIDGE PAINTING US 69 NORTHBOUND OVER MP & UP RR, 0.7 AND 1.5 MILES NORTH OF JCT SH 16233(07) FFY 2012 51 WAGONER Div. 1 US069 0.200 Mi. Let 02/2012 $243,800 INTERSECT MODIF US-75: AT US-60 IN BARTLESVILLE 21903(04) FFY 2012 WASHINGTON Div. 8 US075 0.040 Mi. Let 04/2012 $371,000 RIGHT OF WAY US-60: BEGIN APPROX. 2.5 MILES EAST OF US-75, IN BARTLESVILLE, & EXTEND 24242(05) FFY 2012 EAST APPROX. 4.48 MILES TO THE NOWATA C/L (RW FOR 24242(04) WASHINGTON Div. 8 US060 4.480 Mi. Let 08/2012 $720,154 UTILITIES US-60: BEGIN APPROX. 2.5 MILES EAST OF US-75, IN BARTLESVILLE, & EXTEND 24242(06) FFY 2012 EAST APPROX. 4.48 MILES TO THE NOWATA C/L (UT FOR 2424204) WASHINGTON Div. 8 US060 4.480 Mi. Let 08/2012 $1,132,339 BRIDGE & APPROACHES US-64 OVER WHITE HORSE CREEK APPROX. 9.0 MILE EAST OF JCT US-64/SH-50. 24243(04) FFY 2012 WOODS Div. 6 US064 0.500 Mi. Let 05/2012 $3,051,814 BRIDGE & APPROACHES US-64 OVER UNNAMED CREEK APPROX. 3.1 MILE EAST OF JCT US-64/SH-14. 24318(04) FFY 2012 WOODS Div. 6 US064 0.200 Mi. Let 04/2012 $942,205 RIGHT OF WAY US-64: OVER RED HORSE CREEK, 5.3 MILES EAST OF SH-50 JCT. RW FOR 27010(05) FFY 2012 27010(04) WOODS Div. 6 US064 1.000 Mi. Let 02/2012 $160,000 UTILITIES US-64: OVER RED HORSE CREEK, 5.3 MILES EAST OF SH-50 JCT. UT FOR 27010(06) FFY 2012 27010(04) WOODS Div. 6 US064 1.000 Mi. Let 02/2012 $160,000 GRADE, DRAIN & SURFACE US-412: FR APPROX 10 MI EAST OF MOORELAND EAST 4.1 MILES 10061(07) FFY 2012 WOODWARD Div. 6 US412 4.100 Mi. Let 08/2012 $7,150,000 RIGHT OF WAY SH-15 BEG APPROX. 3.1 MI EAST OF THE ELLIS C/L & EXT EAST APPROX. 2.95 24159(05) FFY 2012 MI. RW FOR 24159(07) WOODWARD Div. 6 SH015 2.950 Mi. Let 04/2012 $350,000 RIGHT OF WAY SH-15 OVER TURKEY (BULL) CREEK APPROX. 2.1 MILE EAST OF THE ELLIS C/L 24368(05) FFY 2012 RW FOR 24368(04) WOODWARD Div. 6 SH015 1.000 Mi. Let 01/2012 $152,297 UTILITIES SH-15 OVER TURKEY (BULL) CREEK APPROX. 2.1 MILE EAST OF THE ELLIS C/L 24368(06) FFY 2012 UT FOR 24368(04) WOODWARD Div. 6 SH015 1.000 Mi. Let 01/2012 $139,706 Wednesday, September 28, 2011 page 11 FFY 2013 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt Federal Fiscal Year 2013 GRADE & DRAIN US-59: FR 2 MILES NORTH OF WESTVILLE TO EXTEND NORTH 4.95 MI.(4 OR 5 16928(09) FFY 2013 LANE) ADAIR Div. 1 US059 4.950 Mi. Let 02/2013 $10,800,000 BRIDGE & APPROACHES SH-11: OVER SALT FORK RIVER & OVERFLOW APPROX. 5.1,5.7, 6.4 & 6.8 MI. 20940(04) FFY 2013 EAST OF THE JUNCTION OF SH-11/US-64 ALFALFA Div. 6 SH011 2.100 Mi. Let 11/2012 $8,784,657 BRIDGE & APPROACHES US-64 OVER EAST CLAY CR, 1.0 MI EAST OF SH-8 26493(04) FFY 2013 ALFALFA Div. 6 US064 1.000 Mi. Let 06/2013 $2,019,400 RIGHT OF WAY SH-23 FROM 1.0 MI SOUTH OF THE TEXAS ST. LN., EXTEND NORTH APPROX 3.0 24067(05) FFY 2013 MI (1.0 MILE IN TEXAS) RW FOR 24067(04) BEAVER Div. 6 SH023 2.000 Mi. Let 03/2013 $127,287 BRIDGE & APPROACHES SH-30: OVER NORTH FORK OF RED RIVER, 5.0 MI NORTH OF I-40 23243(04) FFY 2013 BECKHAM Div. 5 SH030 1.000 Mi. Let 04/2013 $7,931,000 RIGHT OF WAY SH-152 FROM SH-6 EAST 4.0 MI ROW FOR 24352(04) 24352(05) FFY 2013 BECKHAM Div. 5 SH152 4.000 Mi. Let 11/2012 $218,000 GRADE, DRAIN & SURFACE US-/270: FROM 3.0 MI SOUTH OF SH-33 IN WATONGA, SOUTH 2.25 MI(SURFACE 20237(07) FFY 2013 NEW PARALLEL LANES AND REHAB EXISTING) SURFACING FOR (08) BLAINE Div. 5 US270 2.250 Mi. Let 01/2013 $4,738,000 GRADE,DRAINING,BRIDGE & SURFACE SH-78/SH-48 : FR JCT US 69, NORTH 2.4 MILES TO JCT SH 48. 07092(04) FFY 2013 BRYAN Div. 2 SH078 2.400 Mi. Let 05/2013 $12,582,685 RIGHT OF WAY SH-78 FROM ACHILLE NORTH 4.17 MI RW FOR 24088(04) 24088(05) FFY 2013 BRYAN Div. 2 SH078 4.170 Mi. Let 05/2013 $567,736 UTILITIES SH-78 FROM ACHILLE NORTH 4.17 MI UT FOR 24088(04) 24088(06) FFY 2013 BRYAN Div. 2 SH078 4.170 Mi. Let 05/2013 $218,360 RIGHT OF WAY SH-78 FROM 4.17 MI NORTH OF ACHILLE NORTH 5.0 MI TO DURANT BYPASS 24389(05) FFY 2013 RW FOR 24389(04) BRYAN Div. 2 SH078 5.000 Mi. Let 07/2013 $681,250 UTILITIES SH-78 FROM 4.17 MI NORTH OF ACHILLE NORTH 5.0 MI TO DURANT BYPASS UT 24389(06) FFY 2013 FOR 24389(04) BRYAN Div. 2 SH078 5.000 Mi. Let 07/2013 $272,500 BRIDGE & APPROACHES US-69B: OVER MINERAL BAYOU CR, 0.5 MI SOUTH OF US-70 26231(04) FFY 2013 BRYAN Div. 2 US069B 0.100 Mi. Let 05/2013 $1,308,000 RIGHT OF WAY SH-58 FROM SH-152 S. OF EAKLY, EXT. N. 6.0 MILESRW FOR 24092(04) 24092(05) FFY 2013 CADDO Div. 7 SH058 6.000 Mi. Let 04/2013 $103,000 UTILITIES SH-58 FROM SH-152 S. OF EAKLY, EXT. N. 6.0 MILESUT FOR 24092(04) 24092(06) FFY 2013 CADDO Div. 7 SH058 6.000 Mi. Let 04/2013 $935,343 GRADE,DRAINING,BRIDGE & SURFACE SH19: FROM 1.7 MI EAST OF THE KIOWA C/L EAST 0.5 MI(CURVE CORRECTION) 24414(04) FFY 2013 CADDO Div. 7 SH019 0.500 Mi. Let 01/2013 $2,527,847 BRIDGE REPAIR I-40: RCB REPAIR AT MILEPOST 103.5. 26488(07) FFY 2013 CADDO Div. 5 IS040 0.100 Mi. Let 10/2012 $687,834 RIGHT OF WAY SH-58: WIDEN & OVERLAY, BEGIN 0.65 MIS N. OF SH-9 EXTEND N. 1.65 MIS.(RW 28815(05) FFY 2013 FOR 28815(04), 27039(04) AND 28027(04)) CADDO Div. 7 SH058 1.650 Mi. Let 03/2013 $1,571,325 UTILITIES SH-58: WIDEN & OVERLAY, BEGIN 0.65 MIS N. OF SH-9 EXTEND N. 1.65 MIS.(UT 28815(06) FFY 2013 FOR 28815(04), 27039(04) AND 28027(04)) CADDO Div. 7 SH058 1.650 Mi. Let 03/2013 $1,405,600 RIGHT OF WAY US-281: OVER THE SOUTH CANADIAN RV AT THE CADDO C/L RW FOR 26360(05) FFY 2013 26360(04) CANADIAN Div. 4 US281 0.500 Mi. Let 10/2012 $545,000 UTILITIES US-281: OVER THE SOUTH CANADIAN RV AT THE CADDO C/L UT FOR 26360(04) 26360(06) FFY 2013 CANADIAN Div. 4 US281 0.500 Mi. Let 10/2012 $545,000 GRADE,DRAINING,BRIDGE & SURFACE SH-53 OVER CADDO CR, CADDO CR O'FLOWS AND BEAR CR., BEGIN APPROX 23291(04) FFY 2013 5.5 MIE. OF SH-76, EXT. E. APPROX 1.37 MI CARTER Div. 7 SH053 1.370 Mi. Let 01/2013 $7,104,387 RIGHT OF WAY SH-53 FROM 6.87 MI EAST OF SH-76, E. APPROX 6.13 MI ROW FOR 24104(04) 24104(05) FFY 2013 AND 24105(05) CARTER Div. 7 SH053 6.130 Mi. Let 02/2013 $1,442,000 RIGHT OF WAY SH-51: BEGIN AT US-62 JCT AND EXTEND SE 0.75 MI. (BARON FORK BR)RW FOR 10437(05) FFY 2013 10437(04) CHEROKEE Div. 1 SH051 0.750 Mi. Let 01/2013 $365,700 Wednesday, September 28, 2011 page 12 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH-51: BEGIN AT US-62 JCT AND EXTEND SE 0.75 MI. (BARON FORK BR)UT FOR 10437(06) FFY 2013 10437(04) CHEROKEE Div. 1 SH051 0.750 Mi. Let 01/2013 $152,600 BRIDGE PAINTING SH-51: OVER DOUBLE SPRING CREEK, 7.0 MILES EAST OF THE WAGONER CO 27044(04) FFY 2013 LINE CHEROKEE Div. 1 SH051 0.040 Mi. Let 01/2013 $180,000 RIGHT OF WAY SH-100: BRIDGE OVER DRY CREEK, 0,5 MILES EAST OF JCT SH-82RW FOR JP 28029(05) FFY 2013 28029(04) CHEROKEE Div. 1 SH100 0.500 Mi. Let 08/2013 $625,400 UTILITIES SH-100: BRIDGE OVER DRY CREEK, 0,5 MILES EAST OF JCT SH-82UT FOR JP 28029(06) FFY 2013 28029(04) CHEROKEE Div. 1 SH100 0.500 Mi. Let 08/2013 $466,400 BANK PROTECTION/RIP-RAP SH-10: FROM APPROX. 2 MILES NORTH OF JCT. SH-51(ILLINOIS RIVER) 28970(04) FFY 2013 CHEROKEE Div. 1 SH010 0.200 Mi. Let 06/2013 $950,000 GRADE, DRAIN & SURFACE I-35: 6 LANE FROM 0.5 MI SOUTH OF MAIN ST, NORTH 1.0 MI IN NORMAN (I-35 09031(10) FFY 2013 MAINLINE AT MAIN STREET) CLEVELAND Div. 3 IS035 1.000 Mi. Let 11/2012 $12,826,000 GRADE & DRAIN I-35: 6 LANE FROM RIVER, NORTH 0.34 MI IN NORMAN (SH-9 RAMP 09031(11) FFY 2013 CONSTRUCTION INCLUDING SURCHARGE) CLEVELAND Div. 3 IS035 0.340 Mi. Let 06/2013 $5,300,000 GRADE,DRAINING,BRIDGE & SURFACE SH-9: FROM JUST WEST OF 24TH, EAST TO 36TH STREET IN NORMAN 20266(04) FFY 2013 CLEVELAND Div. 3 SH009 1.250 Mi. Let 05/2013 $3,675,000 BRIDGE REHABILITATION I-35 OVER SOUTH CANADIAN RIVER IN NORMAN (BRIDGE WIDENING) 27896(04) FFY 2013 CLEVELAND Div. 3 IS035 0.710 Mi. Let 09/2013 $19,600,000 RIGHT OF WAY US-75 OVER COAL CREEK, 2.2 MI NORTH OF ATOKA C/L (RW FOR 20317(04)) 20317(05) FFY 2013 COAL Div. 3 US075 0.020 Mi. Let 04/2013 $163,461 UTILITIES US-75 OVER COAL CREEK, 2.2 MI NORTH OF ATOKA C/L (UT FOR 20317(04)) 20317(06) FFY 2013 COAL Div. 3 US075 0.020 Mi. Let 04/2013 $108,974 GRADE,DRAINING,BRIDGE & SURFACE US-277: BEG 0.04 MIS E. OF US-62 JCT. AT PORTER HILL & EXT. E. APPROX4.46 21717(04) FFY 2013 MIS COMANCHE Div. 7 US277 4.460 Mi. Let 04/2013 $13,790,057 BRIDGE & APPROACHES SH-17 OVER WHISKEY CREEK BEGIN APPROX. 0.79 MILE WEST OF SH-65. 23297(04) FFY 2013 COMANCHE Div. 7 SH017 0.250 Mi. Let 03/2013 $3,995,859 BRIDGE & APPROACHES I-44 BRIDGE REPLACEMENT, REHAB, & SAFETY UPGRADES AT VARIOUS 27165(04) FFY 2013 BRIDGES IN THE TRI-LEVEL INTERCHANGE IN LAWTON COMANCHE Div. 7 IS044 0.450 Mi. Let 01/2013 $2,450,622 RIGHT OF WAY US-277 OVER DEEP RED CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 28036(05) FFY 2013 2.9MIS N. OF JCT US-70 EXTEND N. APPROX 0.85 MIS. COTTON Div. 7 US277 0.850 Mi. Let 11/2012 $50,100 UTILITIES US-277 OVER DEEP RED CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 28036(06) FFY 2013 2.9MIS N. OF JCT US-70 EXTEND N. APPROX 0.85 MIS. COTTON Div. 7 US277 0.850 Mi. Let 11/2012 $151,100 RIGHT OF WAY SH-5A OVER WEST CACHE CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 3.45 MIS E. OF JCT US-277 EXTEND E. APPROX 0.55 MIS. (RW FOR J.P. 28037(04) 28037(05) FFY 2013 COTTON Div. 7 SH005A 0.550 Mi. Let 11/2012 $103,000 UTILITIES SH-5A OVER WEST CACHE CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 28037(06) FFY 2013 3.45 MIS E. OF JCT US-277 EXTEND E. APPROX 0.55 MIS. (UT FOR J.P. 28037(04) COTTON Div. 7 SH005A 0.550 Mi. Let 11/2012 $257,500 RIGHT OF WAY US-59: OVER THE MKT RAILROAD, 1.1 MILES NORTH OF SH-10(RW FOR 24115(05) FFY 2013 2411504) CRAIG Div. 8 US059 0.500 Mi. Let 01/2013 $249,260 UTILITIES US-59: OVER THE MKT RAILROAD, 1.1 MILES NORTH OF SH-10 24115(06) FFY 2013 (UT FOR 2411504) CRAIG Div. 8 US059 0.500 Mi. Let 01/2013 $140,080 RIGHT OF WAY SH-10: BIG CREEK, 17 MILES WEST OF US-59 (RW 27070(05) FFY 2013 FOR 270704) CRAIG Div. 8 SH010 0.300 Mi. Let 03/2013 $54,500 UTILITIES SH-10: BIG CREEK, 17 MILES WEST OF US-59 (UT 27070(06) FFY 2013 FOR 2707004) CRAIG Div. 8 SH010 0.300 Mi. Let 03/2013 $54,500 RIGHT OF WAY US-60: MADDEN CREEK , 0.6 MILES EAST OF NOWATA COUNTY LINE 27082(05) FFY 2013 (RW FOR 2708204) CRAIG Div. 8 US060 0.250 Mi. Let 03/2013 $54,500 UTILITIES US-60: MADDEN CREEK , 0.6 MILES EAST OF NOWATA COUNTY LINE 27082(06) FFY 2013 (UT FOR 2708204) CRAIG Div. 8 US060 0.250 Mi. Let 03/2013 $54,500 RIGHT OF WAY SH-82: LOCUST CREEK, 6.5 MILES NORTH OF MAYES COUNTY LINE 27089(05) FFY 2013 (RW FOR 2708904) CRAIG Div. 8 SH082 0.300 Mi. Let 06/2013 $54,500 Wednesday, September 28, 2011 page 13 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH-82: LOCUST CREEK, 6.5 MILES NORTH OF MAYES COUNTY LINE 27089(06) FFY 2013 (UT FOR 2708904) CRAIG Div. 8 SH082 0.300 Mi. Let 06/2013 $54,500 BRIDGE & APPROACHES SH-16: OVER SKULL CREEK APPROX. 5.7 MILES EAST OF JCT. SH-16/SH-48 21908(04) FFY 2013 CREEK Div. 8 SH016 0.040 Mi. Let 04/2013 $800,060 RIGHT OF WAY SH-51: CIMARRON RIVER, 3.5 MILES EAST OF JCT. SH-99 (RW 27071(05) FFY 2013 FOR 2707104) CREEK Div. 8 SH051 0.350 Mi. Let 06/2013 $218,000 UTILITIES SH-51: CIMARRON RIVER, 3.5 MILES EAST OF JCT. SH-99 (UT 27071(06) FFY 2013 FOR 2707104) CREEK Div. 8 SH051 0.350 Mi. Let 06/2013 $109,000 RIGHT OF WAY US75A: SL & SF R.R. UNDER, 1.9 MI. NORTH OF OKLMULGEE COUNTY LINEROW 27075(05) FFY 2013 FOR 27075(04) CREEK Div. 8 US075A 0.350 Mi. Let 06/2013 $109,000 UTILITIES US75A: SL & SF R.R. UNDER, 1.9 MI. NORTH OF OKLMULGEE COUNTY LINEUT 27075(06) FFY 2013 FOR 27075(04) CREEK Div. 8 US075A 0.350 Mi. Let 06/2013 $109,000 RIGHT OF WAY SH-54, BEGIN 1.8 NORTH OF THE I-40 JCT (NORTH WEATHERFORD CITY LMTS) 24145(05) FFY 2013 ANDEXTEND NORTH 5.0 MILES. ROW FOR 24145(04) CUSTER Div. 5 SH054 5.000 Mi. Let 11/2012 $875,684 BRIDGE WATER PROOF SEAL DIVISION 5 - BRIDGE WATER PROOF SEAL 24391(04) FFY 2013 CUSTER Div. 5 0.000 Mi. Let 03/2013 $122,448 RESURFACE I-40: FROM MILE MARKER 77 TO 84 26490(04) FFY 2013 CUSTER Div. 5 IS040 7.000 Mi. Let 02/2013 $6,370,076 INTERCHANGE I-40: IMPROVEMENT TO INTERCHANGE AT EXIT 82, ADD EB OFF RAMP, POSSIBLE 27911(04) FFY 2013 BRIDGE WIDENING. (PENDING FUNDING BY OTHERS) CUSTER Div. 5 IS040 0.300 Mi. Let 02/2013 $4,299,999 RIGHT OF WAY US-59 FROM 0.69 MI SOUTH OF SH-127 NORTH, NORTH 5.46 MILES (RW FOR 24150(05) FFY 2013 2415004) (TIED W/ 2415105) DELAWARE Div. 8 US059 5.460 Mi. Let 05/2013 $4,326,000 UTILITIES US-59 FROM 0.69 MI SOUTH OF SH-127 NORTH, NORTH 5.46 MILES (UT FOR 24150(06) FFY 2013 2415004) (TIED W/ 2415106) DELAWARE Div. 8 US059 5.460 Mi. Let 05/2013 $1,545,000 RIGHT OF WAY US-59: FROM 2.92 MILES NORTH OF SH-20, NORTH 0.79 MILES (RW FOR 24151(05) FFY 2013 2415104) ( TIED W/ 2415005) DELAWARE Div. 8 US059 0.790 Mi. Let 05/2013 $367,710 UTILITIES US-59: FROM 2.92 MILES NORTH OF SH-20, NORTH 0.79 MILES (UT FOR 24151(06) FFY 2013 2415104) (TIED W/ 2415006) DELAWARE Div. 8 US059 0.790 Mi. Let 05/2013 $381,615 RIGHT OF WAY US-412: FROM THE ARKANSAS STATE LINE WEST TO US-59(RW FOR 2650604) 26506(05) FFY 2013 DELAWARE Div. 8 US412 0.070 Mi. Let 04/2013 $103,000 UTILITIES US-412: FROM THE ARKANSAS STATE LINE WEST TO US-59(UT FOR 2650604) 26506(06) FFY 2013 DELAWARE Div. 8 US412 0.070 Mi. Let 04/2013 $103,000 BRIDGE & APPROACHES SH-74 OVER UNNAMED CREEK, 0.24 MI NORTH OF CARTER C/L 20969(04) FFY 2013 GARVIN Div. 3 SH074 0.590 Mi. Let 03/2013 $2,873,700 RIGHT OF WAY SH-74 OVER BEEF CREEK, 13.35 MI NORTH OF SH-29 (RW FOR 27062(04)) 27062(05) FFY 2013 GARVIN Div. 3 SH074 0.200 Mi. Let 08/2013 $430,025 UTILITIES SH-74 OVER BEEF CREEK, 13.35 MI NORTH OF SH-29 (UT FOR 27062(04)) 27062(06) FFY 2013 GARVIN Div. 3 SH074 0.200 Mi. Let 08/2013 $135,960 RIGHT OF WAY SH-37: FR 0.8 MIS E OF US-81 IN MINCO, EXT E 3.8 MI TO BRAUM'SROAD WEST 20301(05) FFY 2013 OF TUTTLE RW FOR 202301(04) GRADY Div. 7 SH037 3.800 Mi. Let 01/2013 $1,385,781 UTILITIES SH-37: FR 0.8 MIS E OF US-81 IN MINCO, EXT E 3.8 MI TO BRAUM'SROAD WEST 20301(06) FFY 2013 OF TUTTLE. UT FOR 20301(04) GRADY Div. 7 SH037 3.800 Mi. Let 01/2013 $468,651 RIGHT OF WAY SH-39 FROM 3.6 MI EAST OF US-62, EXTEND EAST 3.0 MIS RW FOR 20302(04) 20302(05) FFY 2013 GRADY Div. 7 SH039 3.000 Mi. Let 02/2013 $800,000 UTILITIES SH-39 FROM 3.6 MI EAST OF US-62, EXTEND EAST 3.0 MIS UT FOR 20302(04) 20302(06) FFY 2013 GRADY Div. 7 SH039 3.000 Mi. Let 02/2013 $636,000 RIGHT OF WAY US-81 FROM SH-9 SOUTH 6.3 MI TO US-277(CHICKASHA BYPASS) ROW FOR 24428(05) FFY 2013 24428(04) GRADY Div. 7 US081 6.300 Mi. Let 03/2013 $4,800,000 UTILITIES US-81 FROM SH-9 SOUTH 6.3 MI TO US-277(CHICKASHA BYPASS) UT FOR 24428(06) FFY 2013 24428(04) GRADY Div. 7 US081 6.300 Mi. Let 03/2013 $2,600,000 Wednesday, September 28, 2011 page 14 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES US 81: BRIDGE OVER KILLPECKER CREEK IN POND CREEK 13413(04) FFY 2013 GRANT Div. 4 US081 0.300 Mi. Let 02/2013 $1,910,886 BRIDGE & APPROACHES US-60: OVER POND CREEK APPROX. 1.5 MILE EAST OF THE JCT. OF 21849(04) FFY 2013 US-60/SH-74 GRANT Div. 4 US060 0.100 Mi. Let 01/2013 $3,432,000 BRIDGE & APPROACHES US-81: OVER POLE CAT & UNNAMED CREEKS APPROX. 6.0 & 6.7 MILE N. OF THE 21851(04) FFY 2013 JCT OF US-81/SH-11 GRANT Div. 4 US081 1.880 Mi. Let 02/2013 $6,663,700 RIGHT OF WAY SH-34 OVER SALT FORK, 1.2 MI SOUTH OF US-283ROW FOR 24207(04) 24207(05) FFY 2013 GREER Div. 5 SH034 0.500 Mi. Let 10/2012 $100,564 UTILITIES SH-34 OVER SALT FORK, 1.2 MI SOUTH OF US-283UT FOR 24207(04) 24207(06) FFY 2013 GREER Div. 5 SH034 0.500 Mi. Let 10/2012 $97,672 RIGHT OF WAY SH-5 OVER SANDY CR, 2.9 MI NORTH OF THE JACKSON C/LROW FOR 24208(04) 24208(05) FFY 2013 HARMON Div. 5 SH005 0.500 Mi. Let 10/2012 $100,564 UTILITIES SH-5 OVER SANDY CR, 2.9 MI NORTH OF THE JACKSON C/LUT FOR 24208(04) 24208(06) FFY 2013 HARMON Div. 5 SH005 0.500 Mi. Let 10/2012 $97,674 BRIDGE WATER PROOF SEAL DIVISION 6 BRIDGE SILANE (WATERPROOFING SEAL) 23274(10) FFY 2013 HARPER Div. 6 0.000 Mi. Let 03/2013 $54,500 BRIDGE PAINTING DIVISION 6 BRIDGE PAINTING 23277(04) FFY 2013 HARPER Div. 6 0.000 Mi. Let 03/2013 $400,001 JOINT SEAL/REPAIR DIVISION 6 BRIDGE JOINT 23277(05) FFY 2013 HARPER Div. 6 0.000 Mi. Let 03/2013 $250,000 RIGHT OF WAY SH-34 OVER BUFFALO CR, 5.9 MI SOUTH OF US-64 RW FOR 26494(04) 26494(05) FFY 2013 HARPER Div. 6 SH034 0.500 Mi. Let 03/2013 $54,500 SAFETY IMPROVEMENT DIVISION SIX SAFETY IMPROVEMENTS (SITES TO BE DETERMINED) 27005(05) FFY 2013 HARPER Div. 6 0.000 Mi. Let 05/2013 $250,000 BRIDGE & APPROACHES US-270 OVER ABANDONED RAILROAD, 3.2 MI SOUTHEAST OF SEMINOLE C/L 21789(04) FFY 2013 HUGHES Div. 3 US270 0.640 Mi. Let 11/2012 $2,541,963 RIGHT OF WAY SH-9 OVER WEWOKA CREEK, 3.2 MI EAST OF US-75 (RW FOR 27059(04)) 27059(05) FFY 2013 HUGHES Div. 3 SH009 0.200 Mi. Let 11/2012 $220,523 UTILITIES SH-9 OVER WEWOKA CREEK, 3.2 MI EAST OF US-75 (UT FOR 27059(04)) 27059(06) FFY 2013 HUGHES Div. 3 SH009 0.200 Mi. Let 11/2012 $74,366 RIGHT OF WAY SH-6 OVER SANDY CR, 5.7 MI NORTHEAST OF THE TEXAS S/LROW FOR 24209(05) FFY 2013 24209(04) JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-6 OVER SANDY CR, 5.7 MI NORTHEAST OF THE TEXAS S/LUT FOR 24209(04) 24209(06) FFY 2013 JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $97,672 RIGHT OF WAY SH-6 OVER TURKEY CR, 8.9 MI NORTHEAST OF SH-34ROW FOR 24210(04) 24210(05) FFY 2013 JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-6 OVER TURKEY CR, 8.9 MI NORTHEAST OF SH-34ROW FOR 24210(04) 24210(06) FFY 2013 JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $97,672 BRIDGE & APPROACHES SH-48A OVER LITTLE SANDY & UNNAMED CREEKS, 2.62 & 7.19 MI NORTH & 20972(04) FFY 2013 EAST OF SH-78 JOHNSTON Div. 3 SH048A 0.650 Mi. Let 11/2012 $3,733,235 RIGHT OF WAY SH-99: FROM 5.64 MI NORTH OF SH-22, NORTH 4.19 MI (RW FOR 23268(04) & 23268(05) FFY 2013 (07)) JOHNSTON Div. 3 SH099 3.770 Mi. Let 06/2013 $490,486 UTILITIES SH-99: FROM 5.64 MI NORTH OF SH-22, NORTH 4.19 MI (UT FOR 23268(04) & 23268(06) FFY 2013 (07)) JOHNSTON Div. 3 SH099 3.770 Mi. Let 06/2013 $182,001 BRIDGE & APPROACHES US-60: OVER BOIS D'ARC CREEK APPROX. 12.9 MILE EAST OF US-60/I-35 21853(04) FFY 2013 KAY Div. 4 US060 0.050 Mi. Let 01/2013 $7,758,840 BRIDGE & APPROACHES SH-33: OVER CAMPBELL CREEK APPROX. 12.0 MILE EAST OF THE JCT OF 21855(04) FFY 2013 SH-33/US-81 KINGFISHER Div. 4 SH033 0.040 Mi. Let 02/2013 $1,260,132 BRIDGE & APPROACHES SH-33: OVER UNCLE JOHN'S, O'FLOW & UNNAMED CREEKS 0.5 TO 0.8 MILES E. 21856(04) FFY 2013 OF THE JCT OF SH-33/US-81 KINGFISHER Div. 4 SH033 0.060 Mi. Let 03/2013 $2,780,045 Wednesday, September 28, 2011 page 15 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY SH-6: BEGIN 5.0 MI. S. OF THE SH-6/SH-55E JCT. IN BECKHAM CO & EXT 15027(05) FFY 2013 NORTH5.0 MILE (R/W FOR 15027(04)) 4 LANE KIOWA Div. 5 SH006 5.040 Mi. Let 10/2012 $536,615 GRADE,DRAINING,BRIDGE & SURFACE SH-9: OVER ELK CREEK, 12.0, 12.4, & 12.7 MIS EAST OF GREER C/L 20806(04) FFY 2013 KIOWA Div. 5 SH009 1.200 Mi. Let 05/2013 $6,083,610 BRIDGE & APPROACHES SH-54: OVER RAINY MTN AND TWO UNNAMED CREEKS, 6.0, 6.4 AND 6.8 MILES 23244(04) FFY 2013 SOUTH OF THE SH-9 JUNCTION. KIOWA Div. 5 SH054 1.100 Mi. Let 10/2012 $4,409,885 BRIDGE & APPROACHES SH-54 OVER AN UNNAMED CREEK APPROX. 1.4 MILE SOUTH OF JCT SH-54/SH-9 23400(04) FFY 2013 KIOWA Div. 5 SH054 0.500 Mi. Let 10/2012 $1,581,863 BRIDGE & APPROACHES SH-54 OVER GOTEBO CREEK APPROX. 0.9 MILE NORTH OF JCT SH-54/SH-9. 23401(04) FFY 2013 KIOWA Div. 5 SH054 0.500 Mi. Let 10/2012 $1,642,208 RIGHT OF WAY SH-2 FROM 10.7 MI NORTH OF THE PUSHMATAHA C/L NORTH 6.5 MI RW FOR 24212(05) FFY 2013 24212(04) LATIMER Div. 2 SH002 6.500 Mi. Let 08/2013 $1,594,126 UTILITIES SH-2 FROM 10.7 MI NORTH OF THE PUSHMATAHA C/L NORTH 6.5 MI UT FOR 24212(06) FFY 2013 24212(04) LATIMER Div. 2 SH002 6.500 Mi. Let 08/2013 $637,650 RIGHT OF WAY US-59: OVER SHAWNEE CR, 2.6 MI WEST & NORTH OF US-259 RW FOR 26347(05) FFY 2013 26347(04) LEFLORE Div. 2 US059 0.100 Mi. Let 07/2013 $103,000 UTILITIES US-59: OVER SHAWNEE CR, 2.6 MI WEST & NORTH OF US-259 UT FOR 26347(06) FFY 2013 26347(04) LEFLORE Div. 2 US059 0.100 Mi. Let 07/2013 $103,000 RIGHT OF WAY US-59 OVER CEDAR CREEK & OVERFLOW 5.5 & 5.6 MI WEST OF US-259 RW 27024(05) FFY 2013 FOR 27024(04) (2 BRIDGES) LEFLORE Div. 2 US059 0.100 Mi. Let 05/2013 $423,661 UTILITIES US-59 OVER CEDAR CREEK & OVERFLOW 5.5 & 5.6 MI WEST OF US-259 UT 27024(06) FFY 2013 FOR 27024(04) (2 BRIDGES) LEFLORE Div. 2 US059 0.100 Mi. Let 05/2013 $105,915 WIDEN, RESURFACE & BRIDGE SH-66 OVER DEEP FORK NORTH CANADIAN RIVER, 7.7 MI EAST OF OKLAHOMA 26787(04) FFY 2013 C/L (PENDING TRIBAL/BIA FUNDS) LINCOLN Div. 3 SH066 0.680 Mi. Let 06/2013 $3,144,796 BRIDGE & APPROACHES SH-74 OVER SKELETON CR, APPROX 13.5 MI NORTH OF SH-33 24216(04) FFY 2013 LOGAN Div. 4 SH074 0.100 Mi. Let 06/2013 $1,552,119 INTERCHANGE I-35 INTERCHANGE AT ROGERS ROAD, 3.24 MILES N. OF TEXAS STATE 28584(04) FFY 2013 LINE(TRIBAL FUNDING, CENG = ODOT) LOVE Div. 7 IS035 1.450 Mi. Let 03/2013 $9,891,817 SURFACE SH-15/US-412: FR WOODWARD C/L EXT. EAST 2.04 MILES (SURFACING FOR 10067(09) FFY 2013 10067(08) MAJOR Div. 6 US412 2.040 Mi. Let 07/2013 $2,755,437 RIGHT OF WAY US-70: MADILL BYPASS FROM SH-199 EAST 4.8 MILES RW FOR 18835(05) FFY 2013 18835(04,07,08) MARSHALL Div. 2 US070 4.800 Mi. Let 07/2013 $2,947,860 UTILITIES US-70: MADILL BYPASS FROM SH-199 EAST 4.8 MILES UT FOR 18835(06) FFY 2013 18835(04,07,08) SMC=80/20 MARSHALL Div. 2 US070 4.800 Mi. Let 07/2013 $109,180 RIGHT OF WAY US-70:FROM 4.8 MILES EAST OF SH-199, EXTEND SOUTHEAST 5.5 18838(06) FFY 2013 MILES(KINGSTON BYPASS) RW FOR 18838(04,05,08) MARSHALL Div. 2 US070 5.500 Mi. Let 06/2013 $2,120,000 UTILITIES US-70:FROM 4.8 MILES EAST OF SH-199, EXTEND SOUTHEAST 5.5 18838(07) FFY 2013 MILES(KINGSTON BYPASS) UT FOR 18838(04,05,08) MARSHALL Div. 2 US070 5.500 Mi. Let 06/2013 $243,119 BRIDGE & APPROACHES SH-28 OVER ROCK CREEK, APPROX. 4.5 MILES EAST OF JCT. OF SH-28/US-69 21909(04) FFY 2013 MAYES Div. 8 SH028 0.040 Mi. Let 04/2013 $1,744,000 UTILITIES SH-76 OVER WALNUT CREEK, FROM 0.1 MI SOUTH OF SH-74B, NORTH TO US-62 01964(08) FFY 2013 NEAR BLANCHARD (UT FOR 01964(06)) MCCLAIN Div. 3 SH076 2.100 Mi. Let 02/2013 $661,887 RIGHT OF WAY SH-76 OVER WALNUT CREEK, FROM 0.1 MI SOUTH OF SH-74B, NORTH TO US-62 01964(12) FFY 2013 NEAR BLANCHARD (RW FOR 01964(06)) MCCLAIN Div. 3 SH076 2.100 Mi. Let 02/2013 $386,456 RIGHT OF WAY I-35 UNDER LADD ROAD, 5.9 MI SOUTH OF CLEVELAND C/L (RAMP REPAIR 27220(05) FFY 2013 WORK AND BRIDGE GRADE RAISE) (RW FOR 27220(05)) MCCLAIN Div. 3 IS035 0.100 Mi. Let 07/2013 $154,500 UTILITIES I-35 UNDER LADD ROAD, 5.9 MI SOUTH OF CLEVELAND C/L (RAMP REPAIR 27220(06) FFY 2013 WORK AND BRIDGE GRADE RAISE) (UT FOR 27220(05)) MCCLAIN Div. 3 IS035 0.100 Mi. Let 07/2013 $51,500 RIGHT OF WAY US-70:FROM 2.4 MILES EAST OF CHOCTAW COUNTY LINE,EAST 4.6 MILES R/W 18859(05) FFY 2013 FOR 18859(04,08,09) MCCURTAIN Div. 2 US070 4.600 Mi. Let 06/2013 $1,816,802 Wednesday, September 28, 2011 page 16 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES US-70:FROM 2.4 MILES EAST OF CHOCTAW COUNTY LINE, EAST 4.6 MILES UT 18859(06) FFY 2013 FOR 18859(04,08,09) MCCURTAIN Div. 2 US070 4.600 Mi. Let 06/2013 $2,201,061 RIGHT OF WAY SH-3 FROM JCT US-259 EXTEND WEST 5.09 MILES RW FOR 24219(04) 24219(05) FFY 2013 MCCURTAIN Div. 2 SH003 5.090 Mi. Let 07/2013 $2,180,000 UTILITIES SH-3 FROM JCT US-259 EXTEND WEST 5.09 MI UT FOR 24219(04) 24219(06) FFY 2013 MCCURTAIN Div. 2 SH003 5.090 Mi. Let 07/2013 $981,000 RIGHT OF WAY SH-37 FROM THE TEXAS S/L, NORTH & EAST 7.54 MI RW FOR 24405(04) 24405(05) FFY 2013 MCCURTAIN Div. 2 SH037 7.540 Mi. Let 06/2013 $981,000 UTILITIES SH-37 FROM THE TEXAS S/L, NORTH & EAST 7.54 MI UT FOR 24405(04) 24405(06) FFY 2013 MCCURTAIN Div. 2 SH037 7.540 Mi. Let 06/2013 $381,500 RIGHT OF WAY SH-3 FROM 16.05 MI EAST OF THE PUSHMATAHA C/L EAST 6.0 MI RW FOR 24409(05) FFY 2013 24409(04) MCCURTAIN Div. 2 SH003 6.000 Mi. Let 07/2013 $3,270,000 UTILITIES SH-3 FROM 16.05 MI EAST OF THE PUSHMATAHA C/L EAST 6.0 MI UT FOR 24409(06) FFY 2013 24409(04) MCCURTAIN Div. 2 SH003 6.000 Mi. Let 07/2013 $1,308,000 BRIDGE & APPROACHES US-70: SOUTHBOUND OVER YASHAU CR, 9.1 MI NORTHEAST OF US-259 26234(04) FFY 2013 MCCURTAIN Div. 2 US070 0.100 Mi. Let 05/2013 $2,398,000 RIGHT OF WAY US-259: FROM 8.0 MILES NORTH OF THE TEXAS STATE LINE, NORTH 5.09 26343(05) FFY 2013 MILESRW FOR 26343(04) MCCURTAIN Div. 2 US259 5.090 Mi. Let 07/2013 $500,000 UTILITIES US-259: FROM 8.0 MILES NORTH OF THE TEXAS STATE LINE, NORTH 5.09 MILES 26343(06) FFY 2013 UT FOR 26343(04) MCCURTAIN Div. 2 US259 5.090 Mi. Let 07/2013 $100,000 BRIDGE & APPROACHES SH-9: OVER RR, .4 MI. SE OF US-69B JCT. 21730(04) FFY 2013 MCINTOSH Div. 1 SH009 0.200 Mi. Let 07/2013 $2,938,320 BRIDGE WATER PROOF SEAL DIVISION WIDE (BRIDGE WATERPROOF SEAL), FOR DIVISION (1) SILANE 23105(10) FFY 2013 MUSKOGEE Div. 1 0.100 Mi. Let 04/2013 $54,500 RIGHT OF WAY US-62: OVER CANE CR TRIB & CANE CR, 10.7 & 11.02 MI EAST & NORTH OFTHE 26287(05) FFY 2013 OKMULGEE C/L (ROW FOR 26287(04) MUSKOGEE Div. 1 US062 1.000 Mi. Let 01/2013 $116,761 UTILITIES US-62: OVER CANE CR TRIB & CANE CR, 10.7 & 11.02 MI EAST & NORTH OFTHE 26287(06) FFY 2013 OKMULGEE C/L (UT FOR 26287(04) MUSKOGEE Div. 1 US062 1.000 Mi. Let 01/2013 $12,100 RIGHT OF WAY US-62: OVER CANE CREEK, 1.5 MI EAST OF JCT. SH-16 28954(05) FFY 2013 MUSKOGEE Div. 1 US062 0.300 Mi. Let 04/2013 $300,000 UTILITIES US-62: OVER CANE CREEK, 1.5 MI EAST OF JCT. SH-16 28954(06) FFY 2013 MUSKOGEE Div. 1 US062 0.300 Mi. Let 04/2013 $45,000 GRADE, DRAIN & BRIDGE US-64 BEG APPROX 7.0 M. E. OF BOUNDARY ST. IN PERRY & EXT E. 4.5 MI. TO 20311(07) FFY 2013 US-177 JCT (BILLS CORNER) NOBLE Div. 4 US064 4.500 Mi. Let 01/2013 $5,513,921 BRIDGE & APPROACHES US-64: OVER COW CREEK APPROX. 0.7 MILE EAST OF JCT. OF US-64/US-77. 21862(04) FFY 2013 NOBLE Div. 4 US064 0.050 Mi. Let 02/2013 $1,853,828 BRIDGE & APPROACHES US-64: OVER MULE CREEK APPROX. 7.8 MILE EAST OF JCT OF US-64/US-77 21863(04) FFY 2013 WITHIN 20311(07) NOBLE Div. 4 US064 0.050 Mi. Let 01/2013 $1,503,007 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOF SEAL FOR DIVISION (4) SILANE 23306(10) FFY 2013 NOBLE Div. 4 0.100 Mi. Let 04/2013 $107,972 BRIDGE PAINTING DIVISION (4): PAINT AND JOINT PROJECTS 23317(04) FFY 2013 NOBLE Div. 4 0.100 Mi. Let 03/2013 $1,079,717 RIGHT OF WAY SH-86 OVER COW CR, 0.5 MI EAST OF US-77 IN PERRY RW FOR 26421(04) 26421(05) FFY 2013 NOBLE Div. 4 SH086 0.100 Mi. Let 10/2012 $161,957 UTILITIES SH-86 OVER COW CR, 0.5 MI EAST OF US-77 IN PERRY UT FOR 26421(04) 26421(06) FFY 2013 NOBLE Div. 4 SH086 0.100 Mi. Let 10/2012 $161,957 RIGHT OF WAY US-60: BEGIN AT WASHINGTON C/L & EXTEND EAST APPROX. 5.15 MILES(RW 24269(05) FFY 2013 FOR 24269(04) NOWATA Div. 8 US060 5.150 Mi. Let 11/2012 $873,440 UTILITIES US-60: BEGIN AT WASHINGTON C/L & EXTEND EAST APPROX. 5.15 MILES(UT 24269(06) FFY 2013 FOR 24269(04) NOWATA Div. 8 US060 5.150 Mi. Let 11/2012 $1,513,145 Wednesday, September 28, 2011 page 17 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY I-240: EB TO SB I-35 AT CROSSROADS INTERCHANGE RW FOR 09032(17) 09032(14) FFY 2013 OKLAHOMA Div. 4 IS035 0.500 Mi. Let 02/2013 $5,000,000 UTILITIES I-240: EB TO SB I-35 AT CROSSROADS INTERCHANGE UT FOR 09032(17) 09032(18) FFY 2013 OKLAHOMA Div. 4 IS035 0.500 Mi. Let 02/2013 $1,800,000 BRIDGE & APPROACHES I-40 CROSSTOWN: WP 1.5, BNSF BRIDGE AT BOULEVARD 17428(25) FFY 2013 OKLAHOMA Div. 4 IS040 0.040 Mi. Let 01/2013 $6,686,495 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 4.4, GR, DR, BR & SURFACE FROM THE OKLAHOMA CITY 17428(59) FFY 2013 CANALEAST 0.9 MI & SHIFT I-40 TRAFFIC TO NEW ALIGNMENT OKLAHOMA Div. 4 IS040 0.750 Mi. Let 11/2012 $30,000,000 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 4.5, GR, DR, BR & SURFACE THE BOULEVARD FROMBNSF 17428(60) FFY 2013 EAST TO I-40 OKLAHOMA Div. 4 IS040 0.750 Mi. Let 04/2013 $6,116,431 GRADE,DRAINING,BRIDGE & SURFACE WP 5.1: OVRLAY & STRIPE I-40 MAINLINE FR PENN TO WESTERN, GR, DR, BR & SURFMULTI-LANE RDWY ON FORMER I-40 XTWN BR ALNMT FR CLASSEN TO E.K.GAYLORD. 17428(80) FFY 2013 OKLAHOMA Div. 4 IS040 2.170 Mi. Let 05/2013 $24,000,000 RIGHT OF WAY SH-66: 4-LANES FROM 4.0 MIS. E. OF I-35 E. APPROX. 1.29 MIS.RW FOR 24356(05) FFY 2013 24356(04) OKLAHOMA Div. 4 SH066 1.290 Mi. Let 11/2012 $500,000 UTILITIES SH-66: 4-LANES FROM 4.0 MIS. E. OF I-35 E. APPROX. 1.29 MIS.UT FOR 24356(06) FFY 2013 24356(04) OKLAHOMA Div. 4 SH066 1.290 Mi. Let 11/2012 $500,000 RIGHT OF WAY SH-66 FROM APPROX 6.50 MI EAST OF I-35, EAST APPROX 7.63 MI RW FOR 26423(05) FFY 2013 26423(04) OKLAHOMA Div. 4 SH066 7.630 Mi. Let 11/2012 $545,000 UTILITIES SH-66 FROM APPROX 6.50 MI EAST OF I-35, EAST APPROX 7.63 MI UT FOR 26423(06) FFY 2013 26423(04) OKLAHOMA Div. 4 SH066 7.630 Mi. Let 11/2012 $545,000 BRIDGE & APPROACHES US-266: OVER COAL CREEK, 3.7 MI. E OF US-62/75 JCT. 21738(04) FFY 2013 OKMULGEE Div. 1 US266 0.200 Mi. Let 04/2013 $4,650,000 RIGHT OF WAY US-75: BRIDGES FOR RDWY 7.0 MI NORTH OF I-40, NORTH 2.6 MI. 21740(06) FFY 2013 OKMULGEE Div. 1 US075 2.600 Mi. Let 04/2013 $50,000 UTILITIES US-75: BRIDGES FOR RDWY 7.0 MI NORTH OF I-40, NORTH 2.6 MI. 21740(07) FFY 2013 OKMULGEE Div. 1 US075 2.600 Mi. Let 04/2013 $30,000 RIGHT OF WAY US-62: BRIDGE OVER GRAVE CREEK TRIB, 2.4 MILES EAST OF JCTSH-52RW FOR 27098(05) FFY 2013 JP 27098(04) OKMULGEE Div. 1 US062 0.500 Mi. Let 01/2013 $148,400 UTILITIES US-62: BRIDGE OVER GRAVE CREEK TRIB, 2.4 MILES EAST OF JCTSH-52UT FOR 27098(06) FFY 2013 JP 27098(04) OKMULGEE Div. 1 US062 0.500 Mi. Let 01/2013 $95,400 RIGHT OF WAY SH-20: SYCAMORE CREEK , 7.9 MILE EAST OF SH-18ROW FOR 24752(??) 24752(06) FFY 2013 OSAGE Div. 8 SH020 0.250 Mi. Let 07/2013 $54,500 UTILITIES SH-20: SYCAMORE CREEK , 7.9 MILE EAST OF SH-18UT FOR 24752(??) 24752(07) FFY 2013 OSAGE Div. 8 SH020 0.250 Mi. Let 07/2013 $54,500 RIGHT OF WAY US-60: OVER US-59 APPROX. 7.5 MILES NORTHWEST OF THE 23157(05) FFY 2013 OTTAWA/DELAWARE C/L (RW FOR 2315704) OTTAWA Div. 8 US060 0.100 Mi. Let 04/2013 $434,248 UTILITIES US-60: OVER US-59 APPROX. 7.5 MILES NORTHWEST OF THE 23157(06) FFY 2013 OTTAWA/DELAWARE C/L (UT FOR 23157(04) OTTAWA Div. 8 US060 0.100 Mi. Let 04/2013 $391,201 RIGHT OF WAY SH-10: COUNCIL HOLLOW CREEK, 4.2 MI. NORTH OF DELAWARECO. LINE RW 27074(05) FFY 2013 FOR 27074(04) OTTAWA Div. 8 SH010 0.250 Mi. Let 07/2013 $54,500 UTILITIES SH-10: COUNCIL HOLLOW CREEK, 4.2 MI. NORTH OF DELAWARECO. LINE UT 27074(06) FFY 2013 FOR 27074(04) OTTAWA Div. 8 SH010 0.250 Mi. Let 07/2013 $54,500 BRIDGE & APPROACHES SH-18: OVER ARKANSAS RIVER, FROM EAST EDGE OF RALSTON, IN PAWNEE 20895(04) FFY 2013 CO.,NORTH APPROX. 0.84 MILES ( .50 MILES IN OSAGE CO.) PAWNEE Div. 8 SH018 0.780 Mi. Let 09/2013 $4,833,600 BRIDGE & APPROACHES SH-18: OVER SALT CREEK APPROX. 0.3 MILE SOUTH OF THE PAWNEE COUNTY 21867(04) FFY 2013 LINE. PAYNE Div. 4 SH018 0.060 Mi. Let 03/2013 $1,608,987 WIDEN, RESURFACE & BRIDGE SH-33: OVER AN UNNAMED CREEK APPROX. 3.2 MILE WEST OF JCT OF 21868(04) FFY 2013 SH-33/SH-108 & EXTENDING EAST 1.77 MILE. PAYNE Div. 4 SH033 1.770 Mi. Let 04/2013 $3,140,000 RIGHT OF WAY US-177; BEG @ THE CIMARRON TURNPIKE SPUR & EXT NORTH APPROX 4.0 MILE 26555(05) FFY 2013 INTO NOBLE CO. RW FOR 26555(04) PAYNE Div. 4 US177 4.000 Mi. Let 11/2012 $545,000 Wednesday, September 28, 2011 page 18 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES US-177; BEG @ THE CIMARRON TURNPIKE SPUR & EXT NORTH APPROX 4.0 MILE 26555(06) FFY 2013 INTO NOBLE CO. UT FOR 26555(04) PAYNE Div. 4 US177 4.000 Mi. Let 11/2012 $500,000 RIGHT OF WAY SH-31 FROM 1.13 MI EAST OF MCALESTER, EAST 2.95 MI RW FOR 24331(04) 24331(05) FFY 2013 PITTSBURG Div. 2 SH031 2.950 Mi. Let 06/2013 $436,720 UTILITIES SH-31 FROM 1.13 MI EAST OF MCALESTER, EAST 2.95 MI UT FOR 24331(04) 24331(06) FFY 2013 PITTSBURG Div. 2 SH031 2.950 Mi. Let 06/2013 $191,065 RIGHT OF WAY SH-71: OVER AN UNNAMED CR, 3.0 MI NORTH OF SH-31 RW FOR 26348(04) 26348(05) FFY 2013 PITTSBURG Div. 2 SH071 0.100 Mi. Let 08/2013 $103,000 UTILITIES SH-71: OVER AN UNNAMED CR, 3.0 MI NORTH OF SH-31 UT FOR 26348(04) 26348(06) FFY 2013 PITTSBURG Div. 2 SH071 0.100 Mi. Let 08/2013 $154,500 WIDEN & RESURFACE SH-19: FROM 4.3 MI EAST OF THE GARVIN C/L, EAST 5.61 MI THRU PICKETT 21841(07) FFY 2013 PONTOTOC Div. 3 SH019 5.640 Mi. Let 07/2013 $13,432,745 BRIDGE WATER PROOF SEAL DIVISION 3: BRIDGE WATER PROOFING SEAL (SILANE) 22973(11) FFY 2013 PONTOTOC Div. 3 0.000 Mi. Let 04/2013 $100,000 BRIDGE PAINTING DIVISION 3: BRIDGE PAINT PROJECTS 23284(04) FFY 2013 PONTOTOC Div. 3 0.100 Mi. Let 04/2013 $700,000 JOINT SEAL/REPAIR DIVISION 3: BRIDGE JOINT SEAL/REPAIR PROJECTS 23285(04) FFY 2013 PONTOTOC Div. 3 0.100 Mi. Let 04/2013 $300,000 RIGHT OF WAY SH-99 OVER WALNUT & 2 UNNAMED CR, FROM 0.5 MI NORTH OF SH-99A, 23286(05) FFY 2013 NORTH 3.0 MI (RW FOR 23286(04)) PONTOTOC Div. 3 SH099 3.000 Mi. Let 05/2013 $495,842 UTILITIES SH-99 OVER WALNUT & 2 UNNAMED CR, FROM 0.5 MI NORTH OF SH-99A, 23286(06) FFY 2013 NORTH 3.0 MI (UT FOR 23286(04)) PONTOTOC Div. 3 SH099 3.000 Mi. Let 05/2013 $758,183 RIGHT OF WAY SH-19 OVER BIG SANDY CREEK, 1.0 MI EAST OF JUNCTION SH-3W (RW FOR 27988(05) FFY 2013 27988(04)) PONTOTOC Div. 3 SH019 0.020 Mi. Let 08/2013 $309,000 UTILITIES SH-19 OVER BIG SANDY CREEK, 1.0 MI EAST OF JUNCTION SH-3W (UT FOR 27988(06) FFY 2013 27988(04)) PONTOTOC Div. 3 SH019 0.020 Mi. Let 08/2013 $103,000 RIGHT OF WAY SH-102: FROM SH-9, NORTH 3.06 MI (RW FOR 21788(07)) 21788(08) FFY 2013 POTTAWATOMIE Div. 3 SH102 3.000 Mi. Let 03/2013 $490,486 UTILITIES SH-102: FROM SH-9, NORTH 3.06 MI (UT FOR 21788(07)) 21788(09) FFY 2013 POTTAWATOMIE Div. 3 SH102 3.000 Mi. Let 03/2013 $327,025 INTERCHANGE I-40: INGRESS/EGRESS IMPROVEMENT AT MILE MARK 187 (NOT FULLY FUNDED - 27133(04) FFY 2013 PENDING FUNDING BY OTHERS) POTTAWATOMIE Div. 3 IS040 1.160 Mi. Let 08/2013 $3,460,800 BRIDGE WATER PROOF SEAL DIVISION WIDE, DIVISION 2 - BRIDGE WATERPROOF SEAL 23144(10) FFY 2013 PUSHMATAHA Div. 2 0.100 Mi. Let 04/2013 $54,500 JOINT SEAL/REPAIR DIVISION 2: BRIDGE MAINTENANCE - VARIOUS LOCATIONS (JOINT REPAIR) 23145(06) FFY 2013 PUSHMATAHA Div. 2 0.100 Mi. Let 01/2013 $206,000 BRIDGE PAINTING DIVISION 2: MAINTENANCE - VARIOUS LOCATIONS BRIDGE PAINTING 23145(08) FFY 2013 PUSHMATAHA Div. 2 0.100 Mi. Let 01/2013 $824,000 BRIDGE & APPROACHES US-271: OVER HURD CR, 2.4 MI SOUTH OF CLAYTON 26232(04) FFY 2013 PUSHMATAHA Div. 2 US271 0.100 Mi. Let 05/2013 $1,220,800 BRIDGE & APPROACHES SH-47 OVER RUSH CREEK APPROX. 0.5 MILE SOUTH OF JCT SH-47/SH-30. 24358(04) FFY 2013 ROGER MILLS Div. 5 SH047 0.500 Mi. Let 04/2013 $1,259,789 RIGHT OF WAY SH-33 OVER TURKEY CREEK APPROX 1.2 MILE EAST OF JCT SH-33/SH-30.(RW 24359(05) FFY 2013 FOR 24359(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-33 OVER TURKEY CREEK APPROX 1.2 MILE EAST OF JCT SH-33/SH-30.(UT 24359(06) FFY 2013 FOR 24359(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $87,207 RIGHT OF WAY SH-33 OVER LITTLE TURKEY CREEK APPROX. 2.6 MILE EAST OF JCT 24360(05) FFY 2013 SH-33/SH-30.(RW FOR 24360(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-33 OVER LITTLE TURKEY CREEK APPROX. 2.6 MILE EAST OF JCT 24360(06) FFY 2013 SH-33/SH-30.(UT FOR 24360(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $87,207 Wednesday, September 28, 2011 page 19 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES I-44: EASTBOUND & WESTBOUND BRIDGES AT 177TH EAST AVE. (LYNN LANE) 21898(04) FFY 2013 (IM EARMARK) ROGERS Div. 8 IS044 0.100 Mi. Let 03/2013 $9,810,000 BRIDGE & APPROACHES SH-66: OVER PRYOR CREEK, APPROX. 0.9 MILES NORTHEAST OF JCT. 21920(04) FFY 2013 SH-66/SH-28 ROGERS Div. 8 SH066 0.100 Mi. Let 07/2013 $3,400,000 GRADE, DRAIN & SURFACE SH-66 UNDER SH-266, ADD TURN LANE 23160(04) FFY 2013 ROGERS Div. 8 SH066 0.020 Mi. Let 04/2013 $400,001 RIGHT OF WAY SH-66: FR. END OF 4 LANE, .50 MI. S. OF CRAIG CO. LINE, EXTENDING NORTHEASTAPPROX. 1.25 MI. (0.75 MI. IN CRAIG CO. ), INCLUDING BOX REPLACEMENT 24121(05) FFY 2013 ROGERS Div. 8 SH066 1.250 Mi. Let 01/2013 $473,404 UTILITIES SH 66: FROM END OF 4 LANE, .50 MI. S. OF CRAIG CO., EXTENDING NORTHEASTAPPROX. 1.25 MI. (.75 MI. IN CRAIG CO.), INCLUDING BOX REPLACEMENT 24121(06) FFY 2013 ROGERS Div. 8 SH066 1.250 Mi. Let 01/2013 $276,444 RIGHT OF WAY SH-266: VERDIGRIS RIVER OVERFLOW, 5.9 MILE EAST OF TULSA C/LROW FOR 24957(05) FFY 2013 24957(04) ROGERS Div. 8 SH266 0.490 Mi. Let 03/2013 $218,000 UTILITIES SH-266: VERDIGRIS RIVER OVERFLOW, 5.9 MILE EAST OF TULSA C/LUT FOR 24957(06) FFY 2013 24957(04) ROGERS Div. 8 SH266 0.490 Mi. Let 03/2013 $109,000 MONEY ONLY PARTNERSHIP WITH CLAREMORE: RR GRADE SEPARATION, COUNTRY CLUB TO BLUE STARR (MONEY AVAIL. WHEN PRECONST. ACTIVITIES ARE COMPLETED BY OTHERS) 26242(04) FFY 2013 ROGERS Div. 8 0.000 Mi. Let 09/2013 $30,000,000 RIGHT OF WAY US-270 OVER WEWOKA CREEK & RAILROAD, FROM 4.89 MI EAST OF SH-270A 21006(08) FFY 2013 IN SEMINOLE, EAST 1.2 MI (RW FOR 21006(07)) SEMINOLE Div. 3 US270 1.200 Mi. Let 07/2013 $404,790 UTILITIES US-270 OVER WEWOKA CREEK & RAILROAD, FROM 4.89 MI EAST OF SH-270A 21006(09) FFY 2013 IN SEMINOLE, EAST 1.2 MI (UT FOR 21006(07)) SEMINOLE Div. 3 US270 1.200 Mi. Let 07/2013 $333,205 BRIDGE & APPROACHES US-64: OVER BIG SALLISAW CREEK, 3.1 MILES WEST OF US-59 IN SALLISAW. 09242(06) FFY 2013 W/I RDY PC 08 SEQUOYAH Div. 1 US064 0.070 Mi. Let 06/2013 $4,790,500 BRIDGE REPAIR DIVISION SEVEN BRIDGE PREVENTIVE MAINTENANCE (SITES TO BE DEFINED AT 20328(06) FFY 2013 ALATER DATE) STEPHENS Div. 7 0.000 Mi. Let 06/2013 $920,000 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOFING SEAL FOR DIVISION 7 (FFY 2013) 23125(10) FFY 2013 STEPHENS Div. 7 0.000 Mi. Let 04/2013 $80,000 RIGHT OF WAY SH-29 FROM 2.68 EAST OF US-81, EAST 8.8 MI (RECONSTRUCT ON EXISTING) 24412(05) FFY 2013 (PHASE I & II) ROW FOR 24412(04) STEPHENS Div. 7 SH029 8.800 Mi. Let 12/2012 $667,080 UTILITIES SH-29 FROM 2.68 EAST OF US-81, EAST 8.8 MI (RECONSTRUCT ON EXISTING)UT 24412(06) FFY 2013 FOR PHASE I & II. STEPHENS Div. 7 SH029 8.800 Mi. Let 12/2012 $1,000,000 RIGHT OF WAY SH-53 OVER NEGRO CREEK ON WEST SIDE OF LOCO, 5.84 MIS W. OF JCT 27045(05) FFY 2013 SH-89RW FOR J.P. 27045(04) STEPHENS Div. 7 SH053 0.150 Mi. Let 02/2013 $200,000 UTILITIES SH-53 OVER NEGRO CREEK ON WEST SIDE OF LOCO, 5.84 MIS W. OF JCT 27045(06) FFY 2013 SH-89UT FOR J.P. 27045(04) STEPHENS Div. 7 SH053 0.150 Mi. Let 02/2013 $200,000 RIGHT OF WAY US-54 BEG APPROX 8.5 MILE NORTH OF US-64 & EXT NORTH 2.0 MILE THRU 20839(09) FFY 2013 TYRONE RW FOR 20839(08) TEXAS Div. 6 US054 2.000 Mi. Let 02/2013 $209,000 RIGHT OF WAY CLEARANCE SH-136: BEGINNING AT THE TEXAS STATE LINE & EXTENDING NORTH 5.0 MILE 24241(11) FFY 2013 RW CLEARANCE FOR 24241(04) TEXAS Div. 6 SH136 5.000 Mi. Let 05/2013 $50,000 INTERCHANGE SH-266 OVER US-169 APPROX. 5.8 MILE NORTH OF JCT US-169/I-44. 23167(04) FFY 2013 TULSA Div. 8 SH266 0.040 Mi. Let 08/2013 $7,810,320 SAFETY IMPROVEMENT SAFETY IMPROVEMENT PROJECTS WITHIN DIVISION 8(SITES TO BE SELECTED 23170(05) FFY 2013 LATER) TULSA Div. 8 0.000 Mi. Let 08/2013 $1,000,000 BRIDGE WATER PROOF SEAL 2013 DIVISION 8 SILANE PROJECTS (BRIDGES TO BE DETERMINED LATER) 23185(10) FFY 2013 TULSA Div. 8 0.000 Mi. Let 02/2013 $109,000 BRIDGE & APPROACHES I-244 OVER ARKANSAS RIVER (EASTBOUND) (IM EARMARK) 26604(08) FFY 2013 TULSA Div. 8 IS244 0.560 Mi. Let 03/2013 $45,000,000 RIGHT OF WAY SH-266: FROM APPROX. 0.3 MI. EAST OF US169, EXT. EAST APPROX. 2.25 27053(05) FFY 2013 MILES(.45 MI. IN ROGERS CO.) ROW FOR 27053(04) TULSA Div. 8 SH266 2.250 Mi. Let 04/2013 $218,175 UTILITIES SH-266: FROM APPROX. 0.3 MI. EAST OF US169, EXT. EAST APPROX. 2.25 27053(06) FFY 2013 MILES(.45 MI. IN ROGERS CO.) UT FOR 27053(04) TULSA Div. 8 SH266 2.250 Mi. Let 04/2013 $218,175 Wednesday, September 28, 2011 page 20 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt GRADE,DRAINING,BRIDGE & SURFACE SH-51: FR TAYLOR'S FERRY AREA 7.8 MI E OF JCT SH-51/US-69, EAST 1.77 MI INCL BRIDGE OVER GRAND RIVER (FT GIBSON LAKE) AT WAGONER/CHEROKEE C/L 10006(12) FFY 2013 WAGONER Div. 1 SH051 1.770 Mi. Let 01/2013 $12,000,000 RIGHT OF WAY SH-55 OVER DRY ELK CREEK APPROX. 0.5 MILE WEST OF SH-44.(RW FOR 24367(05) FFY 2013 24367(04)) WASHITA Div. 5 SH055 0.500 Mi. Let 10/2012 $100,564 UTILITIES SH-55 OVER DRY ELK CREEK APPROX. 0.5 MILE WEST OF SH-44.(UT FOR 24367(06) FFY 2013 24367(04)) WASHITA Div. 5 SH055 0.500 Mi. Let 10/2012 $87,207 BRIDGE & APPROACHES US-281 OVER CIMARRON RIVER APPROX. 0.8 MILE NORTH OF WOODS/MAJOR 23278(04) FFY 2013 C/L. WOODS Div. 6 US281 1.000 Mi. Let 05/2013 $5,155,700 BRIDGE & APPROACHES US-281 OVER UNNAMED CREEK APPROX. 1.4 MILE WEST OF JCT US-281/SH-45 24319(04) FFY 2013 WOODS Div. 6 US281 0.500 Mi. Let 01/2013 $2,282,290 BRIDGE & APPROACHES US-64: OVER RED HORSE CREEK, 5.3 MILES EAST OF SH-50 JCT. 27010(04) FFY 2013 WOODS Div. 6 US064 1.500 Mi. Let 08/2013 $6,253,397 RIGHT OF WAY US-183/SH 3: FROM 5 MI. S.E. OF JCT. SH-50, EXT. S.E. 5 MI. R/W FOR 17457(16) 17457(18) FFY 2013 (PARALLEL LANES) WOODWARD Div. 6 US183 5.000 Mi. Let 08/2013 $600,000 RIGHT OF WAY SH 3: FROM 10 MI. S.E. OF JCT. SH-50, EXT. S.E. 4 MI. RW FOR JP 17457(20) 17457(23) FFY 2013 (PARALLEL LANES) WOODWARD Div. 6 US183 4.000 Mi. Let 07/2013 $491,470 UTILITIES SH-15 BEG APPROX. 3.1 MI EAST OF THE ELLIS C/L & EXT EAST APPROX. 2.95 24159(06) FFY 2013 MI. UT FOR 24159(07) WOODWARD Div. 6 SH015 2.950 Mi. Let 11/2012 $950,000 Wednesday, September 28, 2011 page 21 FFY 2014 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt Federal Fiscal Year 2014 UTILITIES US-64: OVER WAGON CREEK, 0.9 MILES WEST OF GRANT CO. LN. UT FOR 27006(06) FFY 2014 27006(04) ALFALFA Div. 6 US064 1.000 Mi. Let 11/2013 $160,000 UTILITIES SH-23 FROM 1.0 MI SOUTH OF THE TEXAS ST. LN., EXTEND NORTH APPROX 3.0 24067(06) FFY 2014 MI (1.0 MILE IN TEXAS) UT FOR 24067(04) BEAVER Div. 6 SH023 2.000 Mi. Let 11/2013 $364,644 RIGHT OF WAY US-270: OVER AURORA CREEK, 5.1 MILES SOUTH OF THE US-64 JCT. RW FOR 27007(05) FFY 2014 27007(04) BEAVER Div. 6 US270 1.000 Mi. Let 02/2014 $80,001 UTILITIES US-270: OVER AURORA CREEK, 5.1 MILES SOUTH OF THE US-64 JCT. UT FOR 27007(06) FFY 2014 27007(04) BEAVER Div. 6 US270 1.000 Mi. Let 02/2014 $60,000 GRADE, DRAIN & SURFACE SH-30: OVER NORTH FORK OF RED RIVER, 5.0 MI NORTH OF I-40(BRIDGE 23243(07) FFY 2014 TIE-INS) BECKHAM Div. 5 SH030 1.000 Mi. Let 04/2014 $2,264,078 GRADE, DRAIN & SURFACE US-70 FR JUST EAST OF SH-78,EXTEND EAST 4.3 MILES(DURANT BYPASS) 18847(08) FFY 2014 BR=18847(09) BRYAN Div. 2 US070 3.980 Mi. Let 05/2014 $10,070,000 BRIDGE & APPROACHES US-70 FR JUST EAST OF SH-78,EXTEND EAST 4.3 MILES(DURANT BYPASS) 18847(09) FFY 2014 GD&S=18847(08) BRYAN Div. 2 US070 3.980 Mi. Let 05/2014 $8,056,000 BRIDGE & APPROACHES SH-48 OVER THE BLUE RV & O'FLOW, 1.6 MI NORTH OF SH-78 26236(04) FFY 2014 BRYAN Div. 2 SH048 0.050 Mi. Let 04/2014 $4,360,000 RIGHT OF WAY SH-78 OVER CHUCKWA CREEK, .9 MILE NORTH OF JCT US-70 IN DURANTRW 27912(05) FFY 2014 FOR 27912(04) BRYAN Div. 2 SH078 0.010 Mi. Let 06/2014 $212,000 UTILITIES SH-78 OVER CHUCKWA CREEK, .9 MILE NORTH OF JCT US-70 IN DURANTUT FOR 27912(06) FFY 2014 27912(04) BRYAN Div. 2 SH078 0.010 Mi. Let 06/2014 $106,000 GRADE, DRAIN & SURFACE US-62: FROM SH-19 JCT. N, APPR0X 7.0 MI (BRIDGE EXCEPTION AT BOX ELDER 12571(04) FFY 2014 CR.BEGIN 1.6 MIS N OF SH-19 EXTEND 0.283 MIS) CADDO Div. 7 US062 7.260 Mi. Let 01/2014 $9,769,643 RIGHT OF WAY US-277: BEG 2.57 MIS W. OF GRADY C/L AT THE N. CURVE IN THE E. EDGE OF 20953(05) FFY 2014 CEMENT, EXT E. APPROX 4.0 MIS TO MIDDLE BILLS CR BR. (RW FOR (04)) CADDO Div. 7 US277 2.470 Mi. Let 11/2013 $550,000 UTILITIES US-277: BEG 2.57 MIS W. OF GRADY C/L AT THE N. CURVE IN THE E. EDGE OF 20953(06) FFY 2014 CEMENT, EXT E. APPROX 4.0 MIS TO MIDDLE BILLS CR BR. (UT FOR (04)) CADDO Div. 7 US277 2.470 Mi. Let 11/2013 $950,000 GRADE, DRAIN & BRIDGE SH-9 RECONSTRUCT ON EXISTING ALIGN. FROM 6.04 MI WEST OF US-62 EAST 24094(04) FFY 2014 TO US-62 CADDO Div. 7 SH009 6.400 Mi. Let 03/2014 $6,888,278 RIGHT OF WAY SH-8 BEGIN AT JCT SH-19/US-277 EXTEND NORTH AND WEST APPROX 5.0 27072(05) FFY 2014 MISRW FOR 27072(04) CADDO Div. 7 SH008 5.000 Mi. Let 12/2013 $950,000 UTILITIES SH-8 BEGIN AT JCT SH-19/US-277 EXTEND NORTH AND WEST APPROX 5.0 27072(06) FFY 2014 MISUT FOR J.P. 27072(04) CADDO Div. 7 SH008 5.000 Mi. Let 12/2013 $1,200,000 GRADE, DRAIN & SURFACE SH 4: FR SH-66 IN YUKON NORTH TO WILSHIRE, 5 LANE FR SH-66 NORTH 0.75 MI 04757(04) FFY 2014 THEN 2 LNE SECTION CANADIAN Div. 4 SH004 3.000 Mi. Let 01/2014 $4,517,864 BRIDGE & APPROACHES SH-4 OVER THE N. CANADIAN RV, & 2 O'FLOWS 1.92, 2.13 & 2.26 MI NORTH OF 04757(05) FFY 2014 SH-66 (WITHIN 04757(04) CANADIAN Div. 4 SH004 0.340 Mi. Let 01/2014 $2,804,369 GRADE, DRAIN & SURFACE SH 4 BEG 3.0 MIS. N. OF SH 66 IN YUKON AT WILSHIRE & EXT. N. TO SH 3-NW 04758(04) FFY 2014 HWY CANADIAN Div. 4 SH004 3.650 Mi. Let 06/2014 $6,365,600 RECONSTRUCT-ADDED LANES I-40: FROM FROM MILE MARKER 136 TO MILE MARKER 139.83 24424(07) FFY 2014 CANADIAN Div. 4 IS040 4.000 Mi. Let 02/2014 $48,905,772 RIGHT OF WAY I-40B: OVER THE UPAC RAILROAD ON THE SOUTH EDGE OF EL RENO RW FOR 27004(05) FFY 2014 27004(04) CANADIAN Div. 4 IS040B 0.200 Mi. Let 10/2013 $163,500 UTILITIES I-40B: OVER THE UPAC RAILROAD ON THE SOUTH EDGE OF EL RENO UT FOR 27004(06) FFY 2014 27004(04) CANADIAN Div. 4 IS040B 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 270: OVER AN UNNAMED CREEK 10.5 MILES E. OF THE BLAINE C/L RW FOR 27105(05) FFY 2014 27105(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 270: OVER AN UNNAMED CREEK 10.5 MILES E. OF THE BLAINE C/L UT FOR 27105(06) FFY 2014 27105(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 Wednesday, September 28, 2011 page 22 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY US 270: OVER UNNAMED CREEK 6.2 MILES E. OF THE BLAINE C/L RW FOR 27106(05) FFY 2014 27106(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 270: OVER UNNAMED CREEK 6.2 MILES E. OF THE BLAINE C/L UT FOR 27106(06) FFY 2014 27106(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 BRIDGE & APPROACHES SH 4: (MUSTANG ROAD) NORTHBOUND & SOUTHBOUND BRIDGES OVER I-40 27957(04) FFY 2014 CANADIAN Div. 4 SH004 0.200 Mi. Let 02/2014 $7,420,000 UTILITIES SH-53 FROM 6.87 MI EAST OF SH-76, E. APPROX 6.13 MI UT FOR 24104(04) AND 24104(06) FFY 2014 24105(05) CARTER Div. 7 SH053 6.130 Mi. Let 11/2013 $1,722,700 BRIDGE & APPROACHES SH-51: OVER FOURTEEN MILE CREEK, 5.0 MILES EAST OF WAGONER CO. LINE. 23138(04) FFY 2014 CHEROKEE Div. 1 SH051 0.060 Mi. Let 04/2014 $3,550,000 BRIDGE & APPROACHES SH-82: OVER FOURTEEN MILE AND THOMPSON BRANCH CREEK, 9.7 AND 9.9 23139(04) FFY 2014 MILESNORTH US-62 CHEROKEE Div. 1 SH082 1.760 Mi. Let 11/2013 $6,617,422 RIGHT OF WAY SH-51: BRIDGE OVER PECAN CREEK, 14.1 MILES EAST OF THE WAGONER CO 27038(05) FFY 2014 LINERW FOR JP 27038(04) CHEROKEE Div. 1 SH051 0.500 Mi. Let 02/2014 $400,001 UTILITIES SH-51: BRIDGE OVER PECAN CREEK, 14.1 MILES EAST OF THE WAGONER CO 27038(06) FFY 2014 LINEUT FOR JP 27038(04) CHEROKEE Div. 1 SH051 0.500 Mi. Let 02/2014 $209,700 GRADE, DRAIN & BRIDGE I-35: 6 LANE FROM RIVER, NORTH 0.34 MI IN NORMAN (SH-9 INTERCHANGE) 09031(05) FFY 2014 CLEVELAND Div. 3 IS035 0.340 Mi. Let 09/2014 $26,051,000 RIGHT OF WAY US-75 OVER ROCK CREEK, 7.09 MI NORTH OF SH-3 (RW FOR 27998(04)) 27998(05) FFY 2014 COAL Div. 3 US075 0.020 Mi. Let 02/2014 $62,222 UTILITIES US-75 OVER ROCK CREEK, 7.09 MI NORTH OF SH-3 (UT FOR 27998(04)) 27998(06) FFY 2014 COAL Div. 3 US075 0.020 Mi. Let 02/2014 $133,242 INTERCHANGE I-44/ FORT SILL KEY GATE INTERCHANGE (IM EARMARK)(OK103 & OK127) 18922(04) FFY 2014 COMANCHE Div. 7 IS044 0.300 Mi. Let 03/2014 $124,832 INTERCHANGE US-62 AT I-44 INTERCHANGE IN LAWTON 27050(04) FFY 2014 COMANCHE Div. 7 US062 1.120 Mi. Let 02/2014 $4,677,780 RIGHT OF WAY I-44: 1.0 MI NORTH OF THE TEXAS STATE LINE(INTERCHANGE IMPROVE) RW FOR 26500(05) FFY 2014 26500(04) COTTON Div. 7 IS044 0.300 Mi. Let 11/2013 $150,000 UTILITIES I-44: 1.0 MI NORTH OF THE TEXAS STATE LINE(INTERCHANGE IMPROVE) UT FOR 26500(06) FFY 2014 26500(04) COTTON Div. 7 IS044 0.300 Mi. Let 11/2013 $120,628 BRIDGE & APPROACHES US-59: OVER RUSSEL CREEK APPROX. 1.3 MILES SOUTH OF THE 23126(04) FFY 2014 OKLAHOMA/KANSAS STATE LINE CRAIG Div. 8 US059 0.150 Mi. Let 09/2014 $1,996,710 BRIDGE & APPROACHES SH-82: OVER MUSTANG CREEK, 1.6 MILES NORTH OF THE MAYES COUNTY LINE 24116(04) FFY 2014 CRAIG Div. 8 SH082 0.500 Mi. Let 04/2014 $1,591,400 BRIDGE & APPROACHES US-59: OVER AN UNNAMED CREEK, 0.9 MILES WEST OF THE OTTAWA COUNTY 24120(04) FFY 2014 LINE CRAIG Div. 8 US059 0.500 Mi. Let 06/2014 $1,591,400 BRIDGE & APPROACHES SH-66: OVER SAND CREEK, 1.8 MILES NORTH OF THE NORTH SH-48 JCT. 24122(04) FFY 2014 CREEK Div. 8 SH066 0.500 Mi. Let 07/2014 $1,591,400 BRIDGE & APPROACHES SH-66: OVER SAND CREEK (NORTH & SOUTHBOUND), 0.8 MILES NORTH OF THE 24123(04) FFY 2014 NORTH SH-48 JCT. CREEK Div. 8 SH066 0.500 Mi. Let 07/2014 $3,270,000 RIGHT OF WAY SH-16: FROM SH-48 EAST 6.0 MILES (RW FOR 2413104) 24131(05) FFY 2014 CREEK Div. 8 SH016 6.000 Mi. Let 12/2013 $925,485 UTILITIES SH-16: FROM SH-48 EAST 6.0 MILES (UT FOR 2413104) 24131(06) FFY 2014 CREEK Div. 8 SH016 6.000 Mi. Let 12/2013 $308,515 RIGHT OF WAY SH-66: FROM APPROX. 0.25 MILES EAST OF DEPEW, NORTHEAST, ON NEW 24132(05) FFY 2014 ALIGNMENT (CURVE CORRECTION) (RW FOR 2413204) CREEK Div. 8 SH066 1.000 Mi. Let 12/2013 $168,127 UTILITIES SH-66: FROM APPROX. 0.25 MILES EAST OF DEPEW, NORTHEAST, ON NEW 24132(06) FFY 2014 ALIGNMENT (CURVE CORRECTION) (UT FOR 2413204) CREEK Div. 8 SH066 1.000 Mi. Let 12/2013 $112,085 BRIDGE & APPROACHES SH-51: COTTONWOOD CREEK, 8.5 MILES EAST OF JCT. SH-99 27067(04) FFY 2014 CREEK Div. 8 SH051 0.250 Mi. Let 05/2014 $3,048,512 Wednesday, September 28, 2011 page 23 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES SH-33 OVER DEER CR, 8.3 MI NORTHEAST OF THE NORTH US-183 JCT 24133(04) FFY 2014 CUSTER Div. 5 SH033 0.500 Mi. Let 10/2013 $2,203,418 BRIDGE WATER PROOF SEAL DIVISION 5 SILANE TREATMENT(WATERPROOF SEAL, SITES TO DETERMINED) 24134(04) FFY 2014 CUSTER Div. 5 0.000 Mi. Let 04/2014 $122,448 RIGHT OF WAY SH-54 FROM 5.0 MI NORTH OF THE NORTH WEATHERFORD C/L, NORTH 5.0 24145(08) FFY 2014 MIROW FOR 24145(07) CUSTER Div. 5 SH054 5.000 Mi. Let 12/2013 $1,029,812 RESURFACE I-40: FROM MILE MARKER 69 TO 77. (FROM I-40B EAST JCT IN CLINTON ANDEXT 24427(05) FFY 2014 EAST 8.0 MILES) CUSTER Div. 5 IS040 8.000 Mi. Let 02/2014 $7,534,321 BRIDGE & APPROACHES SH-85: OVER DUCK CR, 3.2 MILES EAST & NORTH OF THE CRAIG C/L 24147(04) FFY 2014 DELAWARE Div. 8 SH085 0.500 Mi. Let 08/2014 $926,500 RIGHT OF WAY US-183: FROM 16.13 MILES N OF THE CUSTER C/L AND EXTEND NORTH 1.41 06377(25) FFY 2014 MILES.(STARTING AT THE NORTH CITY LIMITS OF TALOGA.) R/W FOR (14)&(20) DEWEY Div. 5 US183 1.410 Mi. Let 12/2013 $25,000 UTILITIES US-183: FROM 16.13 MILES N OF THE CUSTER C/L AND EXTEND NORTH 1.41 06377(26) FFY 2014 MILES.(STARTING AT THE NORTH CITY LIMITS OF TALOGA.) UT FOR (14)&(20) DEWEY Div. 5 US183 1.410 Mi. Let 12/2013 $20,000 BRIDGE & APPROACHES SH-132 OVER TURKEY CR, APPROX. 13.3 MI NORTH OF THE KINGFISHER C/L 24161(04) FFY 2014 GARFIELD Div. 4 SH132 0.100 Mi. Let 11/2013 $1,597,327 BRIDGE & APPROACHES SH-45 OVER AN UNNAMED CR, APPROX. 2.3 MI EAST OF THE ALFALFA C/L 24162(04) FFY 2014 GARFIELD Div. 4 SH045 0.100 Mi. Let 02/2014 $1,597,327 SHOULDER REHAB. US 60: FROM GARLAND RD. E. 1.5 MILES TO HOOVER ST. IN ENID 26375(04) FFY 2014 GARFIELD Div. 4 US060 1.500 Mi. Let 01/2014 $457,735 RESURFACE I-35: FROM SH-19, NORTH 3.21 MI 20970(08) FFY 2014 GARVIN Div. 3 IS035 3.210 Mi. Let 01/2014 $7,632,000 GRADE,DRAINING,BRIDGE & SURFACE SH-19 OVER WASHITA RIVER, FROM 0.74 MI EAST OF US-77, EAST 1.46 MI 21786(04) FFY 2014 GARVIN Div. 3 SH019 1.460 Mi. Let 11/2013 $7,797,996 RIGHT OF WAY SH-19: FROM 1.0 MI EAST OF US-177 IN STRATFORD, EAST 4.6 MI (RW FOR 21841(05) FFY 2014 21841(04)) GARVIN Div. 3 SH019 4.600 Mi. Let 03/2014 $1,295,638 UTILITIES SH-19: FROM 1.0 MI EAST OF US-177 IN STRATFORD, EAST 4.6 MI (UT FOR 21841(06) FFY 2014 21841(04)) GARVIN Div. 3 SH019 4.600 Mi. Let 03/2014 $837,082 BRIDGE & APPROACHES SH-74 OVER UNNAMED CREEK, 6.6 MI NORTH OF CARTER C/L 23263(04) FFY 2014 GARVIN Div. 3 SH074 0.200 Mi. Let 04/2014 $470,004 RIGHT OF WAY US-77 OVER OWL CREEK, 0.6 MI SOUTH OF PAOLI (RW FOR 27061(04)) 27061(05) FFY 2014 GARVIN Div. 3 US077 0.200 Mi. Let 11/2013 $39,220 UTILITIES US-77 OVER OWL CREEK, 0.6 MI SOUTH OF PAOLI (UT FOR 27061(04)) 27061(06) FFY 2014 GARVIN Div. 3 US077 0.200 Mi. Let 11/2013 $11,766 RIGHT OF WAY SH-19 OVER LITTLE PEAVINE CREEK, 6.7 MI EAST OF US-77 (RW FOR 27064(04)) 27064(05) FFY 2014 GARVIN Div. 3 SH019 0.200 Mi. Let 11/2013 $14,840 UTILITIES SH-19 OVER LITTLE PEAVINE CREEK, 6.7 MI EAST OF US-77 (UT FOR 27064(04)) 27064(06) FFY 2014 GARVIN Div. 3 SH019 0.200 Mi. Let 11/2013 $91,160 RIGHT OF WAY SH-76 OVER WASHITA RIVER, 9.4 MI NORTH OF STEPHENS C/L (RW FOR 27997(05) FFY 2014 27997(04)) GARVIN Div. 3 SH076 0.020 Mi. Let 01/2014 $43,460 UTILITIES SH-76 OVER WASHITA RIVER, 9.4 MI NORTH OF STEPHENS C/L (UT FOR 27997(06) FFY 2014 27997(04)) GARVIN Div. 3 SH076 0.020 Mi. Let 01/2014 $236,380 RIGHT OF WAY US-77 OVER WASHITA RIVER, 2.95 MI NORTH OF MURRAY C/L (RW FOR 27999(05) FFY 2014 27999(04)) GARVIN Div. 3 US077 0.020 Mi. Let 02/2014 $324,360 UTILITIES US-77 OVER WASHITA RIVER, 2.95 MI NORTH OF MURRAY C/L (UT FOR 27999(06) FFY 2014 27999(04)) GARVIN Div. 3 US077 0.020 Mi. Let 02/2014 $392,200 RIGHT OF WAY SH-74 OVER WASHITA RIVER, 1.41 MI NORTH OF SH-19 (RW FOR 28000(04)) 28000(05) FFY 2014 GARVIN Div. 3 SH074 0.020 Mi. Let 03/2014 $63,600 UTILITIES SH-74 OVER WASHITA RIVER, 1.41 MI NORTH OF SH-19 (UT FOR 28000(04)) 28000(06) FFY 2014 GARVIN Div. 3 SH074 0.020 Mi. Let 03/2014 $424,000 Wednesday, September 28, 2011 page 24 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY US-277: BEG 1.45 MIS E. OF CADDO C/L AT E. SIDE OF MIDDLE BILL'S CREEK, EXT E. 2.7 MIS ON OFFSET ALIGN TO H.E. BAILEY T.P. OVERPASS BR. (RW FOR (04)) 20962(05) FFY 2014 GRADY Div. 7 US277 3.300 Mi. Let 11/2013 $800,000 BRIDGE & APPROACHES SH-11 OVER SAND CR, APPROX. 6.1 MI EAST OF THE ALFALFA C/L 24174(04) FFY 2014 GRANT Div. 4 SH011 0.100 Mi. Let 04/2014 $1,597,327 BRIDGE & APPROACHES US-64 OVER COLDWATER, SAND & 3 UNNAMED CREEKS, APPROX. 6.5 MI TO 7.5 24175(04) FFY 2014 MILES E. OF THE ALFALFA C/L GRANT Div. 4 US064 1.100 Mi. Let 02/2014 $5,995,000 BRIDGE & APPROACHES SH-11 OVER POLECAT CR, APPROX. 5.9 MI EAST OF US-81 24176(04) FFY 2014 GRANT Div. 4 SH011 0.100 Mi. Let 01/2014 $1,597,327 BRIDGE & APPROACHES US-60 OVER BOGGEY CR, APPROX 4.2 MI WEST OF THE KAY C/L 24177(04) FFY 2014 GRANT Div. 4 US060 0.100 Mi. Let 01/2014 $1,597,327 BRIDGE & APPROACHES US-64 OVER AN UNNAMED CR, APPROX 3.5 MI EAST OF THE ALFALFA C/L 24178(04) FFY 2014 GRANT Div. 4 US064 0.100 Mi. Let 01/2014 $1,597,327 BRIDGE & APPROACHES US-64 OVER AN UNNAMED CR, APPROX 5.5 MI EAST OF THE ALFALFA C/L 24179(04) FFY 2014 GRANT Div. 4 US064 0.100 Mi. Let 01/2014 $1,597,327 SHOULDER IMPROVEMENT & RESURFACE SH-11: FROM 6.43 MI EAST OF THE ALFALFA C/L EAST 6.57 MI BR = 24429(05) 24429(04) FFY 2014 GRANT Div. 4 SH011 6.570 Mi. Let 05/2014 $8,867,034 BRIDGE & APPROACHES SH-11: OVER CROOKED CR, 7.0 MI EAST OF THE ALFALFA C/L RDY = 24429(04) 24429(05) FFY 2014 GRANT Div. 4 SH011 0.100 Mi. Let 05/2014 $798,664 RIGHT OF WAY SH 74: OVER UNNAMED CREEK 1.9 MILES N. OF THE GARFIELD C/L RW FOR 27130(05) FFY 2014 27130(04) GRANT Div. 4 SH074 0.200 Mi. Let 10/2013 $163,500 UTILITIES SH 74: OVER UNNAMED CREEK 1.9 MILES N. OF THE GARFIELD C/L UT FOR 27130(06) FFY 2014 27130(04) GRANT Div. 4 SH074 0.200 Mi. Let 10/2013 $163,500 BRIDGE & APPROACHES SH-34 OVER SALT FORK OF THE RED RIVER, 1.2 MI SOUTH OF US-283 24207(04) FFY 2014 GREER Div. 5 SH034 0.500 Mi. Let 04/2014 $4,856,607 BRIDGE & APPROACHES SH-5 OVER SANDY CR, 2.9 MI NORTH OF THE JACKSON C/L 24208(04) FFY 2014 HARMON Div. 5 SH005 0.500 Mi. Let 03/2014 $2,154,712 BRIDGE & APPROACHES SH 149 AT BEAVER RIVER APPROX 2.44 MI E OF US-283 10448(04) FFY 2014 HARPER Div. 6 SH149 1.000 Mi. Let 02/2014 $2,668,980 BRIDGE WATER PROOF SEAL DIVISION 6 BRIDGE SILANE (WATERPROOFING SEAL) 23274(11) FFY 2014 HARPER Div. 6 0.000 Mi. Let 04/2014 $50,000 JOINT SEAL/REPAIR DIVISION 6 BRIDGE JOINT 23276(05) FFY 2014 HARPER Div. 6 0.000 Mi. Let 03/2014 $250,000 BRIDGE PAINTING DIVISION 6 BRIDGE PAINT 24392(04) FFY 2014 HARPER Div. 6 0.000 Mi. Let 03/2014 $750,000 UTILITIES SH-34 OVER BUFFALO CR, 5.9 MI SOUTH OF US-64 UT FOR 26494(04) 26494(06) FFY 2014 HARPER Div. 6 SH034 0.500 Mi. Let 11/2013 $50,000 SAFETY IMPROVEMENT DIVISION SIX SAFETY IMPROVEMENTS (SITES TO BE DETERMINED) 27002(06) FFY 2014 HARPER Div. 6 0.000 Mi. Let 03/2014 $250,000 BRIDGE & APPROACHES SH-2: OVER BEAVER CREEK, 1.3 MILES WEST OF JCT SH-31 27046(04) FFY 2014 HASKELL Div. 1 SH002 0.400 Mi. Let 04/2014 $3,062,900 RIGHT OF WAY SH-82: BRIDGE OVER OWL CREEK, 5.6 MILES NORTH OF JCT SH-31RW FOR JP 27102(05) FFY 2014 27102(04) HASKELL Div. 1 SH082 0.520 Mi. Let 10/2013 $92,650 UTILITIES SH-82: BRIDGE OVER OWL CREEK, 5.6 MILES NORTH OF JCT SH-31UT FOR JP 27102(06) FFY 2014 27102(04) HASKELL Div. 1 SH082 0.520 Mi. Let 10/2013 $87,200 RIGHT OF WAY SH-9 OVER UNNAMED CREEK, 10.15 MI EAST OF SEMINOLE C/L (RW FOR 28921(05) FFY 2014 28921(04)) HUGHES Div. 3 SH009 0.200 Mi. Let 08/2014 $159,000 UTILITIES SH-9 OVER UNNAMED CREEK, 10.15 MI EAST OF SEMINOLE C/L (UT FOR 28921(06) FFY 2014 28921(04)) HUGHES Div. 3 SH009 0.200 Mi. Let 08/2014 $53,000 BRIDGE & APPROACHES SH-6 OVER SANDY CR, 5.7 MI NORTHEAST OF THE TEXAS S/L 24209(04) FFY 2014 JACKSON Div. 5 SH006 0.500 Mi. Let 03/2014 $2,770,764 Wednesday, September 28, 2011 page 25 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES SH-6 OVER TURKEY CR, 8.9 MI NORTHEAST OF SH-34 24210(04) FFY 2014 JACKSON Div. 5 SH006 0.500 Mi. Let 03/2014 $3,063,336 UTILITIES US-283: BEGIN APPROX 0.5 MILE NORTH OF THE RED RIVER BRIDGE & EXTEND 24379(06) FFY 2014 NORTH4.25 MILE. (UT FOR 24379(04) JACKSON Div. 5 US283 4.250 Mi. Let 10/2013 $1,270,409 WIDEN, RESURFACE & BRIDGE US-283: BEGIN APPROX 0.1 MILE SOUTH OF SH-5 EAST & EXTEND NORTH 6.1 24379(07) FFY 2014 MILE. JACKSON Div. 5 US283 6.100 Mi. Let 11/2013 $8,233,010 BRIDGE & APPROACHES SH-99 OVER UNNAMED CREEK, 2.25 MI NORTH OF SH-7 20971(04) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 11/2013 $976,260 BRIDGE & APPROACHES SH-99 OVER UNNAMED CREEK, 3.68 MI NORTH OF SH-7 23265(04) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 11/2013 $1,384,360 BRIDGE & APPROACHES SH-99 OVER DIAMOND SPRING BRANCH CREEK, 4.35 MI NORTH OF SH-7 23266(04) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 11/2013 $1,266,700 RIGHT OF WAY SH-22 OVER BUTCHER PEN CREEK, 4.3 MI WEST OF SH-78 (RW FOR 27058(04)) 27058(05) FFY 2014 JOHNSTON Div. 3 SH022 0.200 Mi. Let 11/2013 $47,700 UTILITIES SH-22 OVER BUTCHER PEN CREEK, 4.3 MI WEST OF SH-78 (UT FOR 27058(04)) 27058(06) FFY 2014 JOHNSTON Div. 3 SH022 0.200 Mi. Let 11/2013 $68,158 RIGHT OF WAY SH-99 OVER WASHITA RIVER, 1.2 MI SOUTH OF SH-22 (RW FOR 27142(04)) 27142(05) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 01/2014 $142,040 UTILITIES SH-99 OVER WASHITA RIVER, 1.2 MI SOUTH OF SH-22 (UT FOR 27142(04)) 27142(06) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 01/2014 $30,740 BRIDGE & APPROACHES US-77: OVER BIRD'S NEST CREEK APPROX. 1.3 MILE NORTH OF THE NOBLE C/L 21854(04) FFY 2014 KAY Div. 4 US077 0.050 Mi. Let 04/2014 $2,632,387 SHOULDER REHAB. SH 11: FROM I-35 E. 2.0 MILES TO BLACKWELL (WESTBOUND ONLY) 26373(04) FFY 2014 KAY Div. 4 SH011 2.000 Mi. Let 01/2014 $582,605 RIGHT OF WAY I-35: UNDER HUBBARD ROAD 11.0 MILES N. OF THE NOBLE C/L RW FOR 27100(05) FFY 2014 27100(04) KAY Div. 4 IS035 0.200 Mi. Let 10/2013 $163,500 UTILITIES I-35: UNDER HUBBARD ROAD 11.0 MILES N. OF THE NOBLE C/L UT FOR 27100(06) FFY 2014 27100(04) KAY Div. 4 IS035 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 177: OVER UNNAMED CREEK 7.3 MILES N. OF SH 11 RW FOR 27119(04) 27119(05) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 177: OVER UNNAMED CREEK 7.3 MILES N. OF SH 11 UT FOR 27119(04) 27119(06) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 177: OVER UNNAMED CREEK 5.6 MILES N. OF SH 11 RW FOR 27123(04) 27123(05) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 177: OVER UNNAMED CREEK 5.6 MILES N. OF SH 11 UT FOR 27123(04) 27123(06) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 BRIDGE REHABILITATION SH-51: OVER SKELETON CREEK APPROX. 11.3 MILE EAST OF JCT OF 21858(04) FFY 2014 SH-51/US-81. KINGFISHER Div. 4 SH051 0.150 Mi. Let 03/2014 $1,090,000 BRIDGE & APPROACHES SH-51 OVER TURKEY CR, 1.6 WEST OF US-81 24211(05) FFY 2014 KINGFISHER Div. 4 SH051 0.100 Mi. Let 02/2014 $2,038,301 BRIDGE & APPROACHES SH 51: 2 BRIDGE BOX EXTENSIONS & 1 REPLACEMENT FROM US 81 IN 27945(07) FFY 2014 HENNESSEY E.7.53 MIS. WITHIN 27945(04) KINGFISHER Div. 4 SH051 6.520 Mi. Let 01/2014 $1,160,000 UTILITIES SH-6: BEGIN 5.0 MI S. OF THE SH-6/SH-55E JCT. IN BECKHAM CO & EXT NORTH5.0 MILE, S OF RETROP (UT FOR 15027(04)) 4 LANE ECON CORRIDOR RTE 15027(06) FFY 2014 KIOWA Div. 5 SH006 5.040 Mi. Let 10/2013 $1,858,102 RIGHT OF WAY SH-19 OVER AN UNNAMED CR, 0.3 MI EAST OF SH-115ROW FOR 26477(04) 26477(05) FFY 2014 KIOWA Div. 5 SH019 0.500 Mi. Let 10/2013 $50,000 UTILITIES SH-19 OVER AN UNNAMED CR, 0.3 MI EAST OF SH-115UT FOR 26477(04) 26477(06) FFY 2014 KIOWA Div. 5 SH019 0.500 Mi. Let 10/2013 $50,000 RIGHT OF WAY SH 1 OVER BUFFALO CREEK AND 2 OVERFLOWS2.58 MI EAST OF SH 2 (3 27138(05) FFY 2014 BRIDGES) RW FOR 2138(04) LATIMER Div. 2 SH001 0.520 Mi. Let 03/2014 $1,962,000 Wednesday, September 28, 2011 page 26 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH 1 OVER BUFFALO CREEK AND 2 OVERFLOWS (3 BRIDGES) UT FOR 27138(06) FFY 2014 27138(04) LATIMER Div. 2 SH001 0.520 Mi. Let 03/2014 $272,500 RIGHT OF WAY SH-63 OVER KIAMICHI RIVER, 2.1 MI EAST OF JCT US-259 RW FOR 27029(04) 27029(05) FFY 2014 LEFLORE Div. 2 SH063 0.200 Mi. Let 01/2014 $1,007,000 UTILITIES SH-63 OVER KIAMICHI RIVER, 2.1 MI EAST OF JCT US-259 UT FOR 27029(04) 27029(06) FFY 2014 LEFLORE Div. 2 SH063 0.200 Mi. Let 01/2014 $265,000 BRIDGE & APPROACHES SH-18 OVER WEST BEAVER CREEK, 10.8 MI NORTH OF SH-66 23280(04) FFY 2014 LINCOLN Div. 3 SH018 0.200 Mi. Let 11/2013 $2,419,980 RIGHT OF WAY SH-105 OVER HEADQUARTERS CREEK, 1.0 MI EAST OF US-177 (RW FOR 27060(05) FFY 2014 27060(04)) LINCOLN Div. 3 SH105 0.200 Mi. Let 07/2014 $54,060 UTILITIES SH-105 OVER HEADQUARTERS CREEK, 1.0 MI EAST OF US-177 (UT FOR 27060(06) FFY 2014 27060(04)) LINCOLN Div. 3 SH105 0.200 Mi. Let 07/2014 $50,562 BRIDGE & APPROACHES SH-33: OVER COTTONWOOD CREEK, NOBLE STREET RAILROAD IN GUTHRIE. 21860(04) FFY 2014 LOGAN Div. 4 SH033 0.100 Mi. Let 04/2014 $13,584,466 BRIDGE & APPROACHES US-77 OVER LAWRIE CR, APPROX 5.37 MI NORTH OF SH-33 24214(04) FFY 2014 LOGAN Div. 4 US077 0.100 Mi. Let 06/2014 $1,597,327 BRIDGE & APPROACHES SH-74 OVER CROW CR, APPROX 11.0 MI NORTH OF SH-33 24215(04) FFY 2014 LOGAN Div. 4 SH074 0.100 Mi. Let 06/2014 $1,597,327 SHOULDER REHAB. SH 33: FROM PINE ST. IN GUTHRIE E. 1.0 MILES TO THE SH 105 JCT. 26379(04) FFY 2014 LOGAN Div. 4 SH033 1.000 Mi. Let 03/2014 $401,761 RIGHT OF WAY SH 33: ADD SHOULDERS & RESURFACE FROM THE KINGFISHER C/L E. 3.51 26996(05) FFY 2014 MILES RW FOR 26996(04) LOGAN Div. 4 SH033 3.510 Mi. Let 10/2013 $545,000 UTILITIES SH 33: ADD SHOULDERS & RESURFACE FROM THE KINGFISHER C/L E. 3.51 26996(06) FFY 2014 MILES UT FOR 26996(04) LOGAN Div. 4 SH033 3.510 Mi. Let 10/2013 $545,000 RIGHT OF WAY SH 51: OVER WEST BEAVER CREEK 12.6 MILES E. OF THE KINGFISHER C/L RW 27099(05) FFY 2014 FOR 27099(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 UTILITIES SH 51: OVER WEST BEAVER CREEK 12.6 MILES E. OF THE KINGFISHER C/L UT 27099(06) FFY 2014 FOR 27099(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 77: OVER THE CIMARRON RIVER 2.8 MILES N. OF SH 33 RW FOR 27103(04) 27103(05) FFY 2014 LOGAN Div. 4 US077 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 77: OVER THE CIMARRON RIVER 2.8 MILES N. OF SH 33 UT FOR 27103(04) 27103(06) FFY 2014 LOGAN Div. 4 US077 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY SH 51: OVER MIDDLE BEAVER CREEK 13.7 MILES E. OF THE KINGFISHER C/L 27122(05) FFY 2014 RW FOR 27122(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 UTILITIES SH 51: OVER MIDDLE BEAVER CREEK 13.7 MILES E. OF THE KINGFISHER C/L UT 27122(06) FFY 2014 FOR 27122(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 GRADE,DRAINING,BRIDGE & SURFACE SH-32: BEG APPROX. 3.89 MILE EAST OF SH-96 & EXT EAST 4.1 MILES. (ADD 10147(05) FFY 2014 PVD SHLDRS + RESURF) LOVE Div. 7 SH032 4.100 Mi. Let 01/2014 $8,399,440 RIGHT OF WAY SH-32: OVER MUD CREEK BRIDGE AND TWO O'FLOWS BEGIN APPROX 3.45 MIS EAST OF THE JEFFERSON C/L, EXTEND EAST APPROX 1.5 MIS (ROW FOR 26502(04)) 26502(05) FFY 2014 LOVE Div. 7 SH032 1.500 Mi. Let 11/2013 $600,000 UTILITIES SH-32: OVER MUD CREEK BRIDGE AND TWO O'FLOWS BEGIN APPROX 3.45 MIS EAST OF THE JEFFERSON C/L, EXTEND EAST APPROX 1.5 MIS (UT FOR 26502(04)) 26502(06) FFY 2014 LOVE Div. 7 SH032 1.500 Mi. Let 11/2013 $800,000 GRADE,DRAINING,BRIDGE & SURFACE US-412: FR 0.1 MILES EAST OF JCT US-281, EXTEND EAST APPROX 3.7 MILES 17358(10) FFY 2014 MAJOR Div. 6 US412 3.680 Mi. Let 03/2014 $8,307,183 RIGHT OF WAY US-60 OVER CIMARRON RIVER, 1.8 MILES SOUTH OF THE SH-8 JCT. RW FOR 27009(05) FFY 2014 27009(04) MAJOR Div. 6 US060 1.000 Mi. Let 04/2014 $100,000 UTILITIES US-60 OVER CIMARRON RIVER, 1.8 MILES SOUTH OF THE SH-8 JCT. UT FOR 27009(06) FFY 2014 27009(04) MAJOR Div. 6 US060 1.000 Mi. Let 04/2014 $163,500 BRIDGE REHABILITATION SH-69A: OVER PRYOR CREEK, 4.2 MILES EAST OF US-69 24235(04) FFY 2014 MAYES Div. 8 SH069A 0.500 Mi. Let 07/2014 $1,596,850 Wednesday, September 28, 2011 page 27 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt GRADE,DRAINING,BRIDGE & SURFACE US-70 FROM 6.2 MI EAST OF US-259 EAST 3.12 MI 17427(04) FFY 2014 MCCURTAIN Div. 2 US070 3.120 Mi. Let 07/2014 $14,170,001 RIGHT OF WAY US-259: FROM 2.0 MI NORTH OF THE TEXAS S/L, NORTH 6.0 MI RW FOR 24404(05) FFY 2014 24404(04) MCCURTAIN Div
Object Description
Okla State Agency |
Transportation, Oklahoma Department of |
Okla Agency Code | '345' |
Title | FFY _ through FFY _ construction work plan |
Authors | Oklahoma. Department of Transportation. |
Publisher | Oklahoma Department of Transportation |
Publication Date | 2009; 2010; 2011 |
Publication type | Planning Document |
Serial holdings | Electronic holdings begin with 2009/16 |
Subject | Roads--Oklahoma--Design and construction. |
Purpose | The Plan encompasses State, Federal and Interstate highway improvement projects recommended through an annual validation and consideration process led by our eight Field Division Engineers and approved by the Transportation Commission. |
Contents | Based on 2008/16 issue;Section I Foreword-Letter from the Director;Section II Budgetary Projections;Section III Balancing Process;Section IV Summary Report;Section V Construction Work Plan, Sorted by Federal Fiscal year and by County |
Notes | issues through 2012/19; covers 8 fiscal year period;federal fiscal year;FFY-2009 through FFY-2016 issue "Volume VI";usually accompanied by maps |
OkDocs Class# | T1300.3 C758w |
For all issues click | T1300.3 C758w |
Digital Format | PDF, Adobe Reader required |
ODL electronic copy | Downloaded from agency website: www.okladot.state.ok.us/projmgmt/8-yr_cwp/pdfs/cwp2009-2016.pdf |
Rights and Permissions | This Oklahoma state government publication is provided for educational purposes under U.S. copyright law. Other usage requires permission of copyright holders. |
Source | born digital |
Language | English |
Date created | 2009-11-18 |
Date modified | 2014-05-30 |
OCLC number | 813293047 |
Description
Title | 2012-2019 Construction work plan |
OkDocs Class# | T1300.3 C758w 2011/19 |
Digital Format | PDF, Adobe Reader required |
ODL electronic copy | Downloaded from agency website: http://www.okladot.state.ok.us/cwp-8-year-plan/cwp_ffy2012-ffy2019/pdfs/cwp_ffy2012-2019.pdf |
Rights and Permissions | This Oklahoma state government publication is provided for educational purposes under U.S. copyright law. Other usage requires permission of copyright holders. |
Language | English |
Full text | OKLAHOMA DEPARTMENT OF TRANSPORTATION FFY-2012 through FFY-2019 Construction Work Plan Volume IX Table of Contents SECTION I FOREWORD - Letter from the Director SECTION II BUDGETARY PROJECTIONS SECTION III BALANCING PROCESS SECTION IV SUMMARY REPORT SECTION V CONSTRUCTION WORK PLAN Sorted by Federal Fiscal Year and by County Presented for Transportation Commission Consideration October 3, 2011 FOREWORD The Oklahoma Department of Transportation is pleased to provide the 2012-2019 Construction Work Plan, Volume IX. The Plan encompasses critically needed transportation improvement projects on our State and US highways and our Interstates. These projects are recommended through an annual validation and consideration process led by our eight Field Division Engineers and approved by the Transportation Commission. The State owned highway system in Oklahoma is comprised of the State numbered route highways, the US numbered route highways and the interstate highway system. The state system of highways encompasses 12,265 centerline miles as measured in one direction along the dividing stripe of two lane facilities and in one direction along the general median of multilane facilities. Transportation on our highways is also facilitated via 6,788 bridge structures that span major rivers and lakes, named and unnamed perennial streams and creeks, other roads and highways and railroads. On the average, passenger vehicles, buses and light and heavy trucks traveled more than 66 million vehicle miles each day (daily vehicle miles traveled or DVMT) in 2010 on the non-toll highways in the State of Oklahoma. The conditional issues that manifest in our bridge infrastructure are well known. Since the year 2000 Oklahoma has consistently ranked as one of the worst states on the national list of structurally deficient bridges. At the most recent peak in 2005 1,163 bridges or a full 17% of all highway system bridges were classified as structurally deficient. The Department has placed a priority and focused available resources on this chronic problem in earnest since 2003. With the passage of House Bill 1078 in 2005, which initiated the Rebuilding Oklahoma Access and Driver Safety (ROADS) fund, a more diverse funding pool has been brought to bear. As a result, our structurally deficient bridge numbers are expected to drop to 706 of the recorded 6,788 or 10.4% with the release of the adjusted 2010 annual bridge inspection reports. A thorough review of the current Asset Preservation Plan and the 2011-2018 Construction Work Plan revealed that only 293 of the identified structurally deficient bridges are unfunded and have no scheduled solution. Therefore, as we finalize our annual rebalancing of the Construction Work Plan, it has become increasingly clear that the enormity of the structurally deficient bridge problem that has plagued the highway system for many years can be substantially reduced. Governor Fallin has chosen to confront this long standing problem head on. She has challenged the Department to prepare an investment strategy that will visit all known structurally deficient bridge conditional issues within an eight year window. In response, this Construction Work Plan includes an additional 126 of the 293 remaining unfunded structurally deficient bridges. The structurally deficient bridges identified as unfunded encompass the remaining 167 structures located in all areas of the State with an estimated improvement cost of $439.3 million in today’s dollars. Fully implemented, Governor Fallin’s bold infrastructure investment challenge will provide funding for the remaining structurally deficient bridges and the Department stands ready to effect the improvements. Oklahoman’s will witness a complete reversal of our bridge infrastructure conditional standing, as we move from the bottom to near the top during the time period encompassed by this very Construction Work Plan. As envisioned, the Governor sends a clear message regarding our resolve to control our own destiny by investing in ourselves to the betterment of our citizens and in the interest of furthering our economic progress. Gary M. Ridley Secretary of Transportation BUDGETARY PROJECTIONS Budgetary Projections CONSTRUCTION WORK PLAN - FFY 2012 through FFY 2019 The budgetary projections utilized for the basis of the fiscally responsible and financially balanced Construction Work Plan were established through a systematic evaluation of the Department’s anticipated State-Aid and Federal-Aid revenues and expenditures. Projections were performed for Federal Fiscal Years 2012 - 2019 with the Federal Fiscal Year defined as beginning October 1st and ending on September 30th. The budgetary projections only address funding that has been historically and/or categorically committed to State, Federal and Interstate highway system improvements and does not address Department earmarks or other mandated programs. For the purposes of the initial projections, an estimated baseline State-Aid amount of $82.17 million and an estimated Federal-Aid amount of $333.9 million was utilized as the Fiscal Year 2012 benchmark. The Federal-Aid amount includes a 7.5% projection overstatement to avoid any potential loss of future Federal-Aid funds due to under programming. Of particular note, the annual baseline State-Aid amount available for Construction Work Plan projects is expected to grow to over $317.8 million during the next eight years. As the benchmark amount will vary based upon the results of the annual Congressional budgeting process, the estimated projections will require further adjustment and we will adapt our Construction Work Plan accordingly. Once the Statewide projections are recorded by Fiscal Year, the following formula is applied to establish a baseline Fiscal Year projection for each Field Division: % of Population + % of Mainline Highway System Miles + % of Previous 15 Year Const. Program 3 This formula considers common demographic, physical and historical criteria and yields a Divisional percentage that renders an equitable distribution of the available funds. CORRIDOR PLAN PROJECTS The budgetary projections for Federal Fiscal Years 2012 - 2019 are adjusted accordingly to reflect the debt service requirements of the Corridor Plan projects. The individual project estimates exemplified in the Construction Work Plan constitute approximately 100% of the Federal Fiscal Years 2012 - 2019 anticipated available State and Federal formula funds including the 7.5% overstatement of Federal-Aid and the earmarked Interstate Maintenance funds and excludes the Corridor Plan debt service. BALANCING PROCESS Balancing Process The balancing of the Construction Work Plan progressed in accordance with the roles and responsibilities generally defined in the following outline: Field Division Engineers The development of Construction Work Plan begins with our Field Division Engineers and is guided by their knowledge of the transportation needs and priorities in their respective Divisions. They and their staff work to maintain an understanding of the condition of the roads and bridges in their areas of responsibility. In addition, other key Department Divisions collect and analyze transportation data factoring the following general characteristics as applicable and listed in no particular order: surface condition bridge condition geometrics (vertical and horizontal alignment) average annual daily traffic (AADT) percentage of truck traffic accident history local, regional and national traffic patterns capacity The understanding gained from this information is then coupled with the careful consideration of the Field Division’s condition and capacity assessments of the highway network and the associated critical needs, their anticipated improvement budgets, and further communication with the Division’s Transportation Commissioner. The Field Division Engineers then review and validate the scheduled Construction Work Plan projects and formulate a group of new projects to be added in accordance with the projected funding availability. Planning & Research Division The Planning & Research Division is responsible for coordinating the State’s transportation planning efforts with those of Oklahoma’s Metropolitan Planning Organizations, and consulting with the tribal governments and local officials with responsibilities for transportation. The development of the Long Range Plan, the maintenance of the Statewide Transportation Improvement Plan as derived from the first four years of the ODOT Eight Year Construction Work Plan, Corridor Studies, as well as early project development all include opportunities for public participation and review. The results of this public involvement, input from ongoing coordination and consultation, and the planning documents are provided to the Field Division Engineers for their consideration as the Work Plan is developed. Project Management Division The Project Management Division works directly with and assists the Field Division Engineers in the development of their respective Division’s Construction Work Plan and in the subsequent daily management of the project development activities. Projects proposed by the Field Division Engineers that did not previously exist in the Construction Work Plan are validated to the extent possible in order to institute a preliminary scope, schedule and budget. Concurrently and to the extent possible, the scope, schedule and budget of projects that previously existed in the Construction Work Plan are re-validated. The Project Management Division then continues to facilitate necessary modifications to the scope, schedule and/or budgets of approved Construction Work Plan projects as more detailed information becomes available during the course of Project Development. Validation of projects is accomplished through drive outs and/or other project team meetings with the complete participation of appropriate Preconstruction and Operations Divisions as deemed necessary. The responsible Project Manager schedules, coordinates, documents and facilitates these meetings. Director, Deputy Director and the Chief Engineer The Director, Deputy Director and Chief Engineer, in concert with the Director of Engineering, Director of Operations, Director of Capital Programs and Information Management, Director of Finance and Administration, the Programs Division, the Project Management Division and the Field Division Engineers work to fiscally constrain and balance the Construction Work Plan in accordance with the percentage requirements of the IM, NH, STP, and BR Federal funding categories. The Work Plan balancing is performed with foremost consideration for maintaining the integrity of the Field Division Engineer’s and the Transportation Commissioner’s project priorities. In addition, the balancing process seeks to insure that each Field Division is allocated available funding in accordance with the aggregate State and Federal budget projections. ADDITIONAL CONSIDERATIONS Given the number of extreme variables and the inherent need to maintain a balance between available funds and the Divisional funding commitments, the final Divisional projections are adjusted within a given year. Any adjustments are initiated with consideration for the debt service requirements of the Corridor Plan projects, the ability to schedule and prepare projects for construction in the appropriate Federal-Aid funding categories and the ability to sustain a reasonable annual Construction Work Plan in each Division. The Construction Work Plan is balanced within these guidelines and has been determined to be an equitable representation to the satisfaction of the Department and the Transportation Commission. The Interstate Maintenance Earmarking commitment is continued and adjusted as necessary to encourage the substantial replacement, repair and preservation of the Interstate System. The IM Earmark commitment corresponds with the Divisional budgetary dedication by fiscal year. The Programs Division and the Project Management Division will work in concert with the Field and Central Office Divisions to continue the monitoring and management of the Construction Work Plan in accordance with the provisions of the Construction Work Plan Management Process. FFY 1 FFY 2 FFY 3 FFY 4 FFY 5 FFY 6 FFY 7 FFY 8 Statewide Construction Work Plan Statewide Transportation Improvement Program Transition Year Extended Program Current Year Non Flexible Low Flexibility Moderate Flexibility CONSTRUCTION WORK PLAN MANAGEMENT PROCESS Projects are “Locked” Only modified through formal Program Revision Process Must Remain Balanced Evaluated yearly (July-August) to prepare for inclusion of Extended Program Potential projects to be considered for current program “Lock” Refined project Scope/ Schedule/Budget Prioritized by Year May set minimum criteria for inclusion Must Remain Balanced Evaluated yearly (July- August) to prepare for inclusion of Extended Program Varying levels of Project Development Flexible Scope/Schedule/Budget Prioritized by Year Must Remain Balanced Any project can be advanced for consideration in the Transition Year Evaluated yearly (July-August) to prepare for inclusion of Unscheduled Projects SUMMARY REPORT FFY Division 1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 FFY Totals Estimate $388,344,123 $29,019,910 $39,409,750 $59,260,300 $85,652,984 $32,481,455 $26,234,485 $31,341,079 $84,944,160 $388,344,123 IM Earmark $30,000,000 $2,000,000 $0 $8,000,000 $10,000,000 $0 $0 $0 $10,000,000 $30,000,000 Total $418,344,123 $31,019,910 $39,409,750 $67,260,300 $95,652,984 $32,481,455 $26,234,485 $31,341,079 $94,944,160 $418,344,123 Estimate $487,437,929 $38,771,081 $43,325,990 $69,939,909 $109,316,995 $39,253,271 $30,687,639 $47,205,166 $108,937,878 $487,437,929 IM Earmark $30,000,000 $0 $0 $7,000,000 $9,000,000 $2,000,000 $0 $3,000,000 $9,000,000 $30,000,000 Total $517,437,929 $38,771,081 $43,325,990 $76,939,909 $118,316,995 $41,253,271 $30,687,639 $50,205,166 $117,937,878 $517,437,929 Estimate $537,766,302 $41,486,423 $47,517,301 $75,864,267 $139,502,066 $42,840,572 $31,586,249 $46,867,382 $112,102,042 $537,766,302 IM Earmark $30,000,000 $0 $0 $7,000,000 $9,000,000 $2,000,000 $0 $3,000,000 $9,000,000 $30,000,000 Total $567,766,302 $41,486,423 $47,517,301 $82,864,267 $148,502,066 $44,840,572 $31,586,249 $49,867,382 $121,102,042 $567,766,302 Estimate $551,923,313 $46,531,975 $51,417,480 $81,248,394 $120,314,956 $46,199,105 $34,948,344 $51,702,981 $119,560,078 $551,923,313 IM Earmark $30,000,000 $5,000,000 $0 $3,000,000 $10,000,000 $4,000,000 $0 $3,000,000 $5,000,000 $30,000,000 Total $581,923,313 $51,531,975 $51,417,480 $84,248,394 $130,314,956 $50,199,105 $34,948,344 $54,702,981 $124,560,078 $581,923,313 Estimate $607,263,594 $55,177,225 $53,794,868 $83,399,900 $121,012,644 $49,268,161 $39,789,683 $68,695,961 $136,125,152 $607,263,594 IM Earmark $30,000,000 $5,000,000 $0 $5,000,000 $7,000,000 $3,000,000 $0 $3,000,000 $7,000,000 $30,000,000 Total $637,263,594 $60,177,225 $53,794,868 $88,399,900 $128,012,644 $52,268,161 $39,789,683 $71,695,961 $143,125,152 $637,263,594 Estimate $616,764,258 $59,097,413 $55,700,000 $86,054,700 $133,502,733 $50,739,967 $40,879,482 $66,143,742 $124,646,221 $616,764,258 IM Earmark $30,000,000 $5,000,000 $0 $5,000,000 $7,000,000 $3,000,000 $0 $3,000,000 $7,000,000 $30,000,000 Total $646,764,258 $64,097,413 $55,700,000 $91,054,700 $140,502,733 $53,739,967 $40,879,482 $69,143,742 $131,646,221 $646,764,258 Estimate $614,141,017 $58,358,000 $55,500,000 $85,804,000 $132,812,924 $50,738,041 $40,634,730 $63,509,782 $126,783,540 $614,141,017 IM Earmark $30,000,000 $5,000,000 $0 $5,000,000 $7,000,000 $3,000,000 $0 $3,000,000 $7,000,000 $30,000,000 Total $644,141,017 $63,358,000 $55,500,000 $90,804,000 $139,812,924 $53,738,041 $40,634,730 $66,509,782 $133,783,540 $644,141,017 Estimate $634,120,337 $63,030,000 $58,600,000 $90,250,000 $135,240,551 $53,453,091 $44,486,664 $66,895,381 $122,164,650 $634,120,337 IM Earmark $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $634,120,337 $63,030,000 $58,600,000 $90,250,000 $135,240,551 $53,453,091 $44,486,664 $66,895,381 $122,164,650 $634,120,337 $391,472,027 $405,265,389 $631,821,470 $977,355,853 $364,973,663 $289,247,276 $442,361,474 $935,263,721 $4,437,760,873 $22,000,000 $0 $40,000,000 $59,000,000 $17,000,000 $0 $18,000,000 $54,000,000 $210,000,000 $413,472,027 $405,265,389 $671,821,470 $1,036,355,853 $381,973,663 $289,247,276 $460,361,474 $989,263,721 $4,647,760,873 2018 Total Engineer Estimate Total IM Earmark Funds Total Estimate 2019 2016 2017 2014 2015 CONSTRUCTION WORK PLAN SUMMARY REPORT 2012 2013 Available Funds CONSTRUCTION WORK PLAN FFY 2012 - FFY 2019 CONSTRUCTION WORK PLAN *Projects are ordered by Federal Fiscal Year and arranged alphabetically by County* FFY 2012 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt Federal Fiscal Year 2012 RIGHT OF WAY US-59: FR 6.95 MILES NORTH OF WESTVILLE, EXTEND NORTH 3.48 MILES 16928(18) FFY 2012 THRUWATTS RW FOR 16928(17) ADAIR Div. 1 US059 3.480 Mi. Let 02/2012 $898,325 UTILITIES US-59: FR 6.95 MILES NORTH OF WESTVILLE, EXTEND NORTH 3.48 MILES 16928(19) FFY 2012 THRUWATTS UT FOR 16928(17) ADAIR Div. 1 US059 3.480 Mi. Let 02/2012 $1,132,075 BRIDGE & APPROACHES SH-11: OVER UNNAMED CREEKS APPROX. 3.8 & 4.7 MI EAST OFJCT. OF 21710(04) FFY 2012 SH-11/US-64 ALFALFA Div. 6 SH011 1.600 Mi. Let 08/2012 $3,285,000 BRIDGE & APPROACHES US-64 OVER SPRING CR, 0.2 MI WEST OF SH-58 24062(04) FFY 2012 ALFALFA Div. 6 US064 0.110 Mi. Let 04/2012 $2,772,506 RIGHT OF WAY US-64: OVER WAGON CREEK, 0.9 MILES WEST OF GRANT CO. LN. RW FOR 27006(05) FFY 2012 27006(04) ALFALFA Div. 6 US064 1.000 Mi. Let 07/2012 $140,000 RIGHT OF WAY SH-7 FROM 6.4 MI EAST OF THE JOHNSON C/L EAST 5.0 MI RW FOR 24066(04) 24066(05) FFY 2012 ATOKA Div. 2 SH007 5.000 Mi. Let 08/2012 $662,500 UTILITIES SH-7 FROM 6.4 MI EAST OF THE JOHNSON C/L EAST 5.0 MI UT FOR 24066(04) 24066(06) FFY 2012 ATOKA Div. 2 SH007 5.000 Mi. Let 08/2012 $265,000 RIGHT OF WAY SH-7 FROM 11.4 MI EAST OF THE JOHNSON C/L EAST 4.05 MI RW FOR 24066(08) FFY 2012 24066(07) ATOKA Div. 2 SH007 4.050 Mi. Let 08/2012 $530,000 UTILITIES SH-7 FROM 11.4 MI EAST OF THE JOHNSON C/L EAST 4.05 MI UT FOR 24066(09) FFY 2012 24066(07) ATOKA Div. 2 SH007 4.050 Mi. Let 08/2012 $212,000 WIDEN & RESURFACE US-75 FROM JCT US-69/75 EXTEND WEST 2.5 MILES 29134(04) FFY 2012 ATOKA Div. 2 US075 2.500 Mi. Let 09/2012 $2,000,000 RIGHT OF WAY US-75 FROM JCT US-69/75 EXTEND WEST 2.5 MILES RW FOR 29134(04) 29134(05) FFY 2012 ATOKA Div. 2 US075 2.500 Mi. Let 07/2012 $100,000 UTILITIES US-75 FROM JCT US-69/75 EXTEND WEST 2.5 MILES UT FOR 29134(04) 29134(06) FFY 2012 ATOKA Div. 2 US075 2.500 Mi. Let 07/2012 $100,000 BRIDGE & APPROACHES SH-152: OVER SWEETWATER CREEK & OVRFLOW APPROX 1.9 MILE EAST OF 21703(04) FFY 2012 THETEXAS S/L BECKHAM Div. 5 SH152 0.600 Mi. Let 09/2012 $2,900,047 RIGHT OF WAY SH-30: BR. AND APPR. OVER N. FORK OF RED RIVER, 6.0 MI. N. OF I-40(RW FOR: 23243(05) FFY 2012 23243 (04)&(07). BECKHAM Div. 5 SH030 1.000 Mi. Let 03/2012 $24,852 UTILITIES SH-30: BR. AND APPR. OVER N. FORK OF RED RIVER, 6.0 MI. N. OF I-40UT FOR: 23243(06) FFY 2012 23243 (04)&(07). BECKHAM Div. 5 SH030 1.000 Mi. Let 03/2012 $179,850 BRIDGE PAINTING I-40: BRIDGE PAINT ON R/R BRIDGE OVER I-40 AT MP 23.59. (NBI 17932) 28902(04) FFY 2012 BECKHAM Div. 5 IS040 0.100 Mi. Let 04/2012 $250,000 BRIDGE & APPROACHES SH-58: OVER NINE MILE AND AN UNNAMED CREEK APPROXIMATELY 8.6 AND 9.2 21704(04) FFY 2012 MILESNORTH OF THE US-270 JCT. BLAINE Div. 5 SH058 0.230 Mi. Let 02/2012 $2,644,244 BRIDGE & APPROACHES US-270 OVER THE NORTH CANADIAN RV, 10.2 MI EAST OF THE DEWEY C/L 24087(04) FFY 2012 BLAINE Div. 5 US270 0.400 Mi. Let 11/2011 $3,128,215 BRIDGE & APPROACHES US-70: OVER BLUE RIVER APPROX. 7.7 MILE EAST OF US-69 BUSINESS. 21733(04) FFY 2012 BRYAN Div. 2 US070 0.130 Mi. Let 07/2012 $3,900,000 BRIDGE & APPROACHES SH-199 OVER THE WASHITA RV, 4.0 MI WEST OF SH-78 23191(04) FFY 2012 BRYAN Div. 2 SH199 0.020 Mi. Let 01/2012 $6,000,000 LANDSCAPING US-70 FROM .5 MILE WEST OF DURANT EXTEND SOUTH & EAST 4.74 MILES 27377(04) FFY 2012 MITIGATION FOR 18847(04),18847(05),18847(06) (DURANT BYPASS) BRYAN Div. 2 US070 4.740 Mi. Let 06/2012 $1,000,000 INTERCHANGE US-69 SOUTHBOUND OFF RAMP TO UNIVERSITY BLVD IN CITY OF DURANT 28678(04) FFY 2012 (PENDING FUNDING BY OTHERS) BRYAN Div. 2 US069 0.200 Mi. Let 07/2012 $1,000,000 GRADE, DRAIN & SURFACE SH-152 BEG 2.0 MI E. OF SH-146, EXT E. APPROX 2.10MI. TO APACHEAVE 01817(04) FFY 2012 W/STORM SEWER OUTFALL EXT .24 MI TO 0.1 MI E. OF US-281 CADDO Div. 7 SH152 2.100 Mi. Let 03/2012 $7,653,356 RIGHT OF WAY US-62: FROM SH-19 JCT. N, APPR0X 7.0 MI (BRIDGE EXCEPTION AT BOX ELDER 12571(05) FFY 2012 CR.BEGIN 1.6 MIS N OF SH-19 EXTEND 0.283 MIS) R/W FOR 12571(04) CADDO Div. 7 US062 7.260 Mi. Let 06/2012 $388,350 Wednesday, September 28, 2011 page 1 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES US-62: FROM SH-19 JCT. N, APPR0X 7.0 MI (BRIDGE EXCEPTION AT BOX ELDER 12571(06) FFY 2012 CR.BEGIN 1.6 MIS N OF SH-19 EXTEND 0.283 MIS) UT FOR 12571(04) CADDO Div. 7 US062 7.260 Mi. Let 06/2012 $823,300 BRIDGE & APPROACHES US-62 OVER UNNAMED CREEK APPROX. 2.9 MILE NORTH OF JCT US-62/SH-19 21711(08) FFY 2012 CADDO Div. 7 US062 0.150 Mi. Let 04/2012 $945,400 BRIDGE & APPROACHES US-62 OVER UNNAMED CREEK APPROX. 3.51 MILE NORTH OF JCT US-62/SH-19 21711(09) FFY 2012 CADDO Div. 7 US062 0.150 Mi. Let 04/2012 $1,021,114 RIGHT OF WAY SH-9 RECON. ON EXISTING ALIGN. FROM 5.65 MI WEST OF US-62 EAST TO 24094(05) FFY 2012 US-62ROW FOR 24094(04) CADDO Div. 7 SH009 5.600 Mi. Let 04/2012 $605,700 UTILITIES SH-9 RECON. ON EXISTING ALIGN. FROM 5.65 MI WEST OF US-62 EAST TO 24094(06) FFY 2012 US-62UT FOR 24094(04) CADDO Div. 7 SH009 5.600 Mi. Let 04/2012 $864,600 RESURFACE I-40: FROM MILE MARKER 102.2 TO 104.26. 26488(04) FFY 2012 CADDO Div. 5 IS040 2.060 Mi. Let 11/2011 $4,100,000 RIGHT OF WAY I-40: RCB REPAIR AT MILEPOST 103.5.RIGHT-OF-WAY FOR 26488(07) 26488(05) FFY 2012 CADDO Div. 5 IS040 0.100 Mi. Let 10/2011 $10,000 UTILITIES I-40: RCB REPAIR AT MILEPOST 103.5.UTILITIES FOR 26488(07) 26488(06) FFY 2012 CADDO Div. 5 IS040 0.100 Mi. Let 10/2011 $10,000 GRADE, DRAIN & SURFACE SH-199 FROM 1.35 MI WEST OF US-177, EXTEND EAST APPROX. 1.67 MI(PHASE 20231(07) FFY 2012 II) CARTER Div. 7 SH199 1.670 Mi. Let 03/2012 $6,386,000 GRADE, DRAIN & SURFACE SH-53 BEG. 7.05 MI. E. OF I-35 AT THE W. ENT. TO ARDMORE AIR PARK, EXT 24373(04) FFY 2012 S.0.6 MI. TO JCT SH-53A (OK-002) CARTER Div. 7 SH053 0.600 Mi. Let 01/2012 $1,832,000 BRIDGE & APPROACHES SH-76 OVER WILDHORSE & UNNAMED CREEKS, 2.76 & 2.95 MI NORTH OF SH-7 24953(04) FFY 2012 CARTER Div. 3 SH076 0.300 Mi. Let 07/2012 $2,165,000 RIGHT OF WAY US-177 OVER WASHITA RIVER BEGIN APPROX 3.2 MIS N. OF JCT SH-199 28035(05) FFY 2012 EXTEND N. 0.35 MIS. (RW FOR J.P. 28035(04) CARTER Div. 7 US177 0.350 Mi. Let 02/2012 $300,000 UTILITIES US-177 OVER WASHITA RIVER BEGIN APPROX 3.2 MIS N. OF JCT SH-199 28035(06) FFY 2012 EXTEND N. 0.35 MIS. (UT FOR J.P. 28035(04) CARTER Div. 7 US177 0.350 Mi. Let 02/2012 $159,900 RIGHT OF WAY SH-51: OVER FOURTEEN MILE CREEK, 5.0 MILES EAST OF WAGONER CO. LINE. 23138(05) FFY 2012 (ROW FOR: 23138(04)) CHEROKEE Div. 1 SH051 0.060 Mi. Let 01/2012 $421,242 UTILITIES SH-51: OVER FOURTEEN MILE CREEK, 5.0 MILES EAST OF WAGONER CO. LINE. 23138(06) FFY 2012 (UT FOR: 23138(04)) CHEROKEE Div. 1 SH051 0.060 Mi. Let 01/2012 $379,480 RIGHT OF WAY SH-10: FROM APPROX. 2 MILE NORTH OF JCT. SH-51 (ILLINOIS RIVER) 28970(05) FFY 2012 CHEROKEE Div. 1 SH010 0.200 Mi. Let 06/2012 $115,000 RIGHT OF WAY I-35: 6 LANE FROM RIVER, NORTH TO 0.5 MI SOUTH OF MAIN ST. IN NORMAN 09031(06) FFY 2012 (SH-9 & LINDSEY STREET) (RW FOR 09031(05)(09)) CLEVELAND Div. 3 IS035 1.120 Mi. Let 06/2012 $1,030,000 UTILITIES I-35: 6 LANE FROM RIVER, NORTH TO 0.5 MI SOUTH OF MAIN ST. IN NORMAN 09031(07) FFY 2012 (SH-9 & LINDSEY STREET) (UT FOR 09031(05)(09)) CLEVELAND Div. 3 IS035 1.120 Mi. Let 06/2012 $2,369,000 GRADE, DRAIN & BRIDGE I-35: 6 LANE FROM 0.5 MI SOUTH OF MAIN ST, NORTH 1.0 MI IN NORMAN (MAIN 09031(08) FFY 2012 STREET INTERCHANGE) CLEVELAND Div. 3 IS035 1.000 Mi. Let 09/2012 $22,145,000 SAFETY IMPROVEMENT I-35: SOUNDWALL BETWEEN LINDSEY STREET AND MAIN STREET ALONG EAST 09031(15) FFY 2012 SIDE OF I-35 CLEVELAND Div. 3 IS035 1.000 Mi. Let 01/2012 $4,000,000 GRADE, DRAIN & SURFACE US-77: FROM 4.05 MI NORTH OF SH-39, NORTH 2.5 MI THRU SLAUGHTERVILLE (4 20997(07) FFY 2012 LANE UNDIVIDED) CLEVELAND Div. 3 US077 2.500 Mi. Let 07/2012 $8,570,000 GRADE, DRAIN & SURFACE I-35 AT ROBINSON ST IN NORMAN, RECONSTRUCT NORTHBOUND ON/OFF 24029(04) FFY 2012 RAMPS (CITY TO FUND) CLEVELAND Div. 3 IS035 0.500 Mi. Let 06/2012 $1,110,000 RIGHT OF WAY I-35 OVER SOUTH CANADIAN RIVER IN NORMAN (BRIDGE WIDENING) (RW FOR 27896(05) FFY 2012 27896(04)) CLEVELAND Div. 3 IS035 0.710 Mi. Let 01/2012 $750,000 UTILITIES I-35 OVER SOUTH CANADIAN RIVER IN NORMAN (BRIDGE WIDENING) (UT FOR 27896(06) FFY 2012 27896(04) CLEVELAND Div. 3 IS035 0.710 Mi. Let 01/2012 $250,000 BRIDGE & APPROACHES SH-17: OVER SHETTLERS & BEAVER CREEKS APPROX 1.1 MILE E. OF SH-65 & 20956(04) FFY 2012 EXTEAST APPROX 0.7 MILE. COMANCHE Div. 7 SH017 0.700 Mi. Let 01/2012 $4,639,818 Wednesday, September 28, 2011 page 2 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY US-62 AT I-44 INTERCHANGE IN LAWTONRW FOR J.P. 27050(04) 27050(05) FFY 2012 COMANCHE Div. 7 US062 0.240 Mi. Let 03/2012 $400,000 UTILITIES US-62 AT I-44 INTERCHANGE IN LAWTONUT FOR 27050(04) 27050(06) FFY 2012 COMANCHE Div. 7 US062 0.240 Mi. Let 03/2012 $1,500,000 RIGHT OF WAY SH-5 OVER SOLDIERS CREEK BEGIN 4.2 MIS S. . OF JCT SH-53 EXTEND E.0.20 27964(05) FFY 2012 MIS (RW FOR J.P. 27964(04) COTTON Div. 7 SH005 0.200 Mi. Let 02/2012 $40,200 UTILITIES SH-5 OVER SOLDIERS CREEK BEGIN 4.2 MIS S. OF JCT SH-53 EXTEND E.0.20 MIS 27964(06) FFY 2012 (UT FOR J.P. 27964(04) COTTON Div. 7 SH005 0.200 Mi. Let 02/2012 $151,100 RIGHT OF WAY US-59: OVER RUSSEL CREEK APPROX. 1.3 MILES SOUTH OF THE 23126(05) FFY 2012 OKLAHOMA/KANSAS STATE LINE (RW FOR 2312604) CRAIG Div. 8 US059 0.150 Mi. Let 06/2012 $249,260 UTILITIES US-59: OVER RUSSEL CREEK APPROX. 1.3 MILES SOUTH OF THE 23126(06) FFY 2012 OKLAHOMA/KANSAS STATE LINE (UT FOR 2312604) CRAIG Div. 8 US059 0.150 Mi. Let 06/2012 $140,080 RIGHT OF WAY SH-10: EAST FORK OF BIG CREEK, 16 MILES WEST OF US-59(RW FOR 27069(04) 27069(05) FFY 2012 CRAIG Div. 8 SH010 0.300 Mi. Let 03/2012 $53,000 UTILITIES SH10: EAST FORK OF BIG CREEK, 16 MILES WEST OF SH-59(UT FOR 27069(04) 27069(06) FFY 2012 CRAIG Div. 8 SH010 0.300 Mi. Let 03/2012 $53,000 RIGHT OF WAY SH-51: COTTONWOOD CREEK, 8.5 MILES EAST OF JCT. SH-99 (RW FOR 27067(05) FFY 2012 2706704) CREEK Div. 8 SH051 0.250 Mi. Let 11/2011 $53,000 UTILITIES SH-51: COTTONWOOD CREEK, 8.5 MILES EAST OF JCT. SH-99(UT FOR 27067(04) 27067(06) FFY 2012 CREEK Div. 8 SH051 0.250 Mi. Let 11/2011 $53,000 BRIDGE PAINTING SH 99 OVER CIMARRON RIVER, 4.4 MI EAST OF PAYNE C/L 28932(04) FFY 2012 CREEK Div. 8 SH099 0.100 Mi. Let 07/2012 $440,000 GRADE, DRAIN & SURFACE US-183: FR WASHITA RIVER EXT NORTH THOUGH ARAPAHO(RECONST TO 09278(04) FFY 2012 4-LANE UNDIVIDED) CUSTER Div. 5 US183 3.050 Mi. Let 02/2012 $7,335,580 BRIDGE WATER PROOF SEAL DIVISION 5: BRIDGE WATER PROOF SEAL - SITES TO BE DETERMINED 24426(04) FFY 2012 CUSTER Div. 5 0.000 Mi. Let 04/2012 $125,345 BRIDGE REPAIR I-40: BRIDGE REPAIR AT EAST BOUND OFF RAMP AT MP 65 IN CLINTON. 28904(04) FFY 2012 CUSTER Div. 5 IS040 0.100 Mi. Let 04/2012 $388,000 RIGHT OF WAY CLEARANCE SH-10: OVER ELK RIVER APPROX 1.35 MILES SOUTH OF OTTAWA C/LROW 10441(08) FFY 2012 CLEARANCE FOR 1044104 DELAWARE Div. 8 SH010 0.340 Mi. Let 09/2012 $100,000 RIGHT OF WAY SH-85: OVER DUCK CR, 3.2 MILES EAST & NORTH OF THE CRAIG C/L (RW FOR 24147(05) FFY 2012 2414704) DELAWARE Div. 8 SH085 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH-85: OVER DUCK CR, 3.2 MILES EAST & NORTH OF THE CRAIG C/L (UT FOR 24147(06) FFY 2012 2414704) DELAWARE Div. 8 SH085 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH 3/US 270 FROM 2.0 MI NORTH OF THE EAST SH 51 JCT SOUTHEAST 8.0 MIUT 17671(12) FFY 2012 FOR 17671(09) (PARALLEL LANES) SMC 80/20 DEWEY Div. 5 US270 8.000 Mi. Let 11/2011 $470,122 UTILITIES SH 3/US 270 FROM 6.0 MI SOUTH OF SH 51 SOUTHEAST 8.0 MIUT FOR 17671(13) 17671(16) FFY 2012 (PARALLEL LANES) SMC 80/20 DEWEY Div. 5 US270 8.000 Mi. Let 11/2011 $470,122 INTERSECT MODIF US-270/SH-3: INTERSECTION MODIFICATION AT THE SH-51 EAST JCT(FOR A 26491(04) FFY 2012 FOUR LANE DIVIDED SECTION ON US-270) DEWEY Div. 5 US270 0.500 Mi. Let 09/2012 $2,947,352 BRIDGE & APPROACHES US-60: OVER SOUTHBOUND US 64, 3.8 MILES NORTH OF JCT. US-412 23300(04) FFY 2012 GARFIELD Div. 4 US060 0.100 Mi. Let 03/2012 $2,956,680 RIGHT OF WAY SH-45 OVER AN UNNAMED CR, APPROX. 2.3 MI EAST OF THE ALFALFA C/L RW 24162(05) FFY 2012 FOR 24162(04) GARFIELD Div. 4 SH045 0.100 Mi. Let 11/2011 $159,000 UTILITIES SH-45 OVER AN UNNAMED CR, APPROX. 2.3 MI EAST OF THE ALFALFA C/L UT 24162(06) FFY 2012 FOR 24162(04) GARFIELD Div. 4 SH045 0.100 Mi. Let 11/2011 $159,000 RIGHT OF WAY SH-76: FROM SH-19, NORTH 3.0 MI INTO MCCLAIN COUNTY (RW FOR 23264(04)) 23264(05) FFY 2012 GARVIN Div. 3 SH076 3.000 Mi. Let 05/2012 $4,017,000 UTILITIES SH-76: FROM SH-19, NORTH 3.0 MI INTO MCCLAIN COUNTY (UT FOR 23264(04)) 23264(06) FFY 2012 GARVIN Div. 3 SH076 3.000 Mi. Let 05/2012 $401,700 Wednesday, September 28, 2011 page 3 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES SH-37: OVER BUGGY CREEK, 0.6 MI. EAST OF US-81 20960(04) FFY 2012 GRADY Div. 7 SH037 0.050 Mi. Let 04/2012 $2,700,000 RIGHT OF WAY SH-19 OVER WASHITA RIVER AND WASHITA RIVER O'FLOW BEGIN APPROX 1.5 28038(05) FFY 2012 MIS NW OF GARVIN C/L EXTEND SW APPROX 0.88 MIS (RW FOR J.P. 28038(004)) GRADY Div. 7 SH019 0.880 Mi. Let 02/2012 $250,000 UTILITIES SH-19 OVER WASHITA RIVER AND WASHITA RIVER O'FLOW BEGIN APPROX 1.5 28038(06) FFY 2012 MIS NW OF GARVIN C/L EXTEND SW APPROX 0.88 MIS (UT FOR J.P. 28038(004)) GRADY Div. 7 SH019 0.880 Mi. Let 02/2012 $725,000 RIGHT OF WAY SH-11 FROM 13.0 MI EAST OF THE ALFALFA C/L, EAST TO US-81 IN MEDFORD 24163(08) FFY 2012 RW FOR 24163(04)(05)(06)(07) GRANT Div. 4 SH011 7.130 Mi. Let 11/2011 $530,000 UTILITIES SH-11 FROM 13.0 MI EAST OF THE ALFALFA C/L, EAST TO US-81 IN MEDFORD 24163(09) FFY 2012 UT FOR 24163(04)(05)(06)(07) GRANT Div. 4 SH011 7.130 Mi. Let 11/2011 $530,000 RIGHT OF WAY US-64 OVER AN UNNAMED CR, APPROX 3.5 MI EAST OF THE ALFALFA C/L RW 24178(05) FFY 2012 FOR 24178(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 UTILITIES US-64 OVER AN UNNAMED CR, APPROX 3.5 MI EAST OF THE ALFALFA C/L UT 24178(06) FFY 2012 FOR 24178(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 RIGHT OF WAY US-64 OVER AN UNNAMED CR, APPROX 5.5 MI EAST OF THE ALFALFA C/L RW 24179(05) FFY 2012 FOR 24179(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 UTILITIES US-64 OVER AN UNNAMED CR, APPROX 5.5 MI EAST OF THE ALFALFA C/L UT 24179(06) FFY 2012 FOR 24179(04) GRANT Div. 4 US064 0.100 Mi. Let 11/2011 $159,000 RIGHT OF WAY SH 149 AT BEAVER RIVER APPROX 2.44 MI E OF US-283 RW FOR 10448(04) 10448(05) FFY 2012 HARPER Div. 6 SH149 1.000 Mi. Let 03/2012 $25,750 UTILITIES SH 149 AT BEAVER RIVER APPROX 2.44 MI E OF US-283 UT FOR 10448(04) 10448(06) FFY 2012 HARPER Div. 6 SH149 1.000 Mi. Let 03/2012 $25,750 BRIDGE PAINTING DIVISION 6 BRIDGE PAINTING 20935(04) FFY 2012 HARPER Div. 6 0.000 Mi. Let 03/2012 $750,000 JOINT SEAL/REPAIR DIVISION 6 BRIDGE JOINT 21724(04) FFY 2012 HARPER Div. 6 0.000 Mi. Let 03/2012 $250,000 BRIDGE WATER PROOF SEAL DIVISION 6 BRIDGE SILANE (WATERPROOFING SEAL) 23274(09) FFY 2012 HARPER Div. 6 0.000 Mi. Let 04/2012 $53,000 SAFETY IMPROVEMENT DIVISION SIX SAFETY IMPROVEMENTS (SITES TO BE DETERMINED) 27002(05) FFY 2012 HARPER Div. 6 0.000 Mi. Let 04/2012 $250,000 RIGHT OF WAY SH-2: OVER BEAVER CREEK, 1.3 MILES WEST OF JCT SH-31RW FOR JP 27046(05) FFY 2012 27046(04) HASKELL Div. 1 SH002 0.400 Mi. Let 07/2012 $190,550 UTILITIES SH-2: OVER BEAVER CREEK, 1.3 MILES WEST OF JCT SH-31UT FOR JP 27046(06) FFY 2012 27046(04) HASKELL Div. 1 SH002 0.400 Mi. Let 07/2012 $185,400 RIGHT OF WAY SH-51 OVER TURKEY CR, 1.6 WEST OF US-81RW FOR 24211(05) 24211(06) FFY 2012 KINGFISHER Div. 4 SH051 0.100 Mi. Let 11/2011 $103,000 UTILITIES SH-51 OVER TURKEY CR, 1.6 WEST OF US-81UT FOR 24211(05) 24211(07) FFY 2012 KINGFISHER Div. 4 SH051 0.100 Mi. Let 11/2011 $103,000 RIGHT OF WAY SH 51: FROM US 81 IN HENNESSEY E. 7.53 MILESRW FOR 27945(04) 27945(05) FFY 2012 KINGFISHER Div. 4 SH051 7.530 Mi. Let 11/2011 $412,000 UTILITIES SH 51: FROM US 81 IN HENNESSEY E. 7.53 MILESUT FOR 27945(04) 27945(06) FFY 2012 KINGFISHER Div. 4 SH051 7.530 Mi. Let 11/2011 $412,000 GRADE, DRAIN & SURFACE US-183: FROM 1.5 MILES NORTH OF THE SH-9 WEST JCT AND EXT NORTH 3.0 16063(45) FFY 2012 MILES.(4 LANE DIVIDED SECTION)(SURFACING FOR 16063(44) KIOWA Div. 5 US183 3.000 Mi. Let 04/2012 $4,800,000 RIGHT OF WAY SH-9: OVER ELK CREEK, 12.0, 12.4, & 12.7 MIS EAST OF GREER C/LROW 20806(05) FFY 2012 20806(04) KIOWA Div. 5 SH009 1.200 Mi. Let 03/2012 $242,480 UTILITIES SH-9: OVER ELK CREEK, 12.0, 12.4, & 12.7 MIS EAST OF GREER C/LUT FOR 20806(06) FFY 2012 20806(04) KIOWA Div. 5 SH009 1.200 Mi. Let 03/2012 $210,384 GRADE, DRAIN & SURFACE SH-82 BEG APPROX. 6.4 MILE NORTH OF US-270 & EXT NORTH APPROX 0.7 MILE 00464(14) FFY 2012 (LANDSLIDE REPAIR) LATIMER Div. 2 SH082 0.700 Mi. Let 06/2012 $7,004,000 Wednesday, September 28, 2011 page 4 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt GRADE,DRAINING,BRIDGE & SURFACE SH-1 OVER 2 ROCK CREEKS, APPROX. .16 MILE WEST OF THELEFLORE C/L & .16 21735(04) FFY 2012 MILE EAST OF THE LATIMER C/L LATIMER Div. 2 SH001 0.100 Mi. Let 08/2012 $5,150,000 RIGHT OF WAY US-59 FROM SUNSET CORNERS EXTEND WEST. (RECONST TO 4 LANE 17127(13) FFY 2012 DIVIDED) RW FOR JP# 17127(04) LEFLORE Div. 2 US059 5.000 Mi. Let 08/2012 $2,266,000 UTILITIES US 59 FROM SUNSET CORNERS EXTEND WEST. (RECONST TO 4 LANE) UT FOR 17127(14) FFY 2012 17127(04) LEFLORE Div. 2 US059 5.000 Mi. Let 08/2012 $412,000 RIGHT OF WAY SH-63 FROM TALIHINA EAST 5.0 MI RW FOR 24213(04) 24213(05) FFY 2012 LEFLORE Div. 2 SH063 5.000 Mi. Let 07/2012 $1,060,000 UTILITIES SH-63 FROM TALIHINA EAST 5.0 MI UT FOR 24213(04) 24213(06) FFY 2012 LEFLORE Div. 2 SH063 5.000 Mi. Let 07/2012 $212,000 WIDEN, RESURFACE & BRIDGE US-177 OVER SPRING CREEK & DEEP FORK NORTH CANADIAN RIVER, 0.24 & 24180(08) FFY 2012 0.53 MI NORTH OF SH-66 LINCOLN Div. 3 US177 0.740 Mi. Let 01/2012 $5,053,600 CROSSING IMPR. & R/R SIGNALS US-177 OVER SPRING CREEK & DEEP FORK NORTH CANADIAN RIVER, 0.24 & 24180(11) FFY 2012 0.53 MINORTH OF SH-66 (RR XING WITHIN 24180(08) (AARDOT = 668848L) LINCOLN Div. 3 US177 0.740 Mi. Let 01/2012 $275,000 WIDEN & RESURFACE US-62: FROM 0.05 MI EAST OF SH-102, EAST .46 MI (100% TRIBAL FUNDS) 24228(07) FFY 2012 LINCOLN Div. 3 US062 0.460 Mi. Let 08/2012 $1,130,800 GRADE, DRAIN & SURFACE US-62/SH-102 INTERSECTION RECONSTRUCTION, 2.97 MI EAST OF OKLAHOMA 24228(10) FFY 2012 C/L LINCOLN Div. 3 US062 0.240 Mi. Let 08/2012 $1,460,000 RIGHT OF WAY SH-33: OVER COTTONWOOD CREEK, NOBLE STREET RAILROAD IN 21860(05) FFY 2012 GUTHRIE.ROW FOR 21860(04) LOGAN Div. 4 SH033 0.100 Mi. Let 01/2012 $1,409,320 UTILITIES SH-33: OVER COTTONWOOD CREEK, NOBLE STREET RAILROAD IN GUTHRIE.UT 21860(06) FFY 2012 FOR 21860(04) LOGAN Div. 4 SH033 0.100 Mi. Let 01/2012 $1,368,745 RIGHT OF WAY SH-74 OVER SKELETON CR, APPROX 13.5 MI NORTH OF SH-33 RW FOR 24216(05) FFY 2012 24216(04) LOGAN Div. 4 SH074 0.100 Mi. Let 11/2011 $159,000 UTILITIES SH-74 OVER SKELETON CR, APPROX 13.5 MI NORTH OF SH-33 UT FOR 24216(06) FFY 2012 24216(04) LOGAN Div. 4 SH074 0.100 Mi. Let 11/2011 $159,000 SHOULDER IMPROVEMENT & RESURFACE SH-33: ADD SHOULDERS AND RESURFACE FROM 4.51 MI. E. OF THE KINGFISHER 24381(04) FFY 2012 C/L E. 1 MI. TO SH-74 LOGAN Div. 4 SH033 1.000 Mi. Let 01/2012 $824,000 RESURFACE SH0: RESURFACING FROM EW 73 E. 1.1 MIS. IN COYLE (INCLUDES PEDESTRIAN 27729(04) FFY 2012 IMPROVEMENTS) LOGAN Div. 4 SH000 1.100 Mi. Let 08/2012 $600,000 RIGHT OF WAY SH-32: BEG APPROX 3.89 MILE EAST OF SH-96 & EXT. EAST 4.1 MILE(RW FOR 10147(08) FFY 2012 10147(05)) LOVE Div. 7 SH032 4.100 Mi. Let 05/2012 $260,000 UTILITIES SH-32: BEG APPROX 3.89 MILE EAST OF SH-96 & EXT. EAST 4.1 MILE(UT FOR 10147(09) FFY 2012 10147(05)) LOVE Div. 7 SH032 4.100 Mi. Let 05/2012 $300,000 RIGHT OF WAY I-35 INTERCHANGE AT ROGERS ROAD, 3.24 MILES N. OF TEXAS STATE LINERW 28584(05) FFY 2012 FOR 28584(04) (TRIBAL FUNDING) LOVE Div. 7 IS035 1.450 Mi. Let 10/2011 $4,087,000 UTILITIES I-35 INTERCHANGE AT ROGERS ROAD, 3.24 MILES N. OF TEXAS STATE LINEUT 28584(06) FFY 2012 FOR 28584(04) (TRIBAL FUNDING) LOVE Div. 7 IS035 1.450 Mi. Let 10/2011 $485,300 GRADE & DRAIN SH-15/US-412: FR WOODWARD C/L EXT. EAST 2.04 MILES 10067(08) FFY 2012 MAJOR Div. 6 US412 2.040 Mi. Let 08/2012 $3,295,207 BRIDGE & APPROACHES SH-58 OVER INDIAN CREEK APPROX. 5.7 MILE NORTH OF JCT SH-58/SH-8. 24230(04) FFY 2012 MAJOR Div. 6 SH058 0.400 Mi. Let 06/2012 $3,281,250 RIGHT OF WAY SH-199: FROM 1.0 MI EAST OF MADILL EAST 5.0 MI RW FOR 24410(04) 24410(05) FFY 2012 MARSHALL Div. 2 SH199 5.000 Mi. Let 08/2012 $681,050 UTILITIES SH-199: FROM 1.0 MI EAST OF MADILL EAST 5.0 MI UT FOR 24410(04) 24410(06) FFY 2012 MARSHALL Div. 2 SH199 5.000 Mi. Let 08/2012 $265,000 RIGHT OF WAY SH-199: FROM 5.17 MI EAST OF MADILL, EAST 6.0 MI RW FOR 24411(04) 24411(05) FFY 2012 MARSHALL Div. 2 SH199 6.000 Mi. Let 08/2012 $1,700,000 UTILITIES SH-199: FROM 5.17 MI EAST OF MADILL, EAST 6.0 MI UT FOR 24411(04) 24411(06) FFY 2012 MARSHALL Div. 2 SH199 6.000 Mi. Let 08/2012 $500,000 Wednesday, September 28, 2011 page 5 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY CLEARANCE SH-28: OVER BIG CABIN CREEK APPROX. 7.5 MILE EAST OF JCT OF 21910(07) FFY 2012 SH-28/US-69.ROW CLEARANCE FOR 2191004 MAYES Div. 8 SH028 0.150 Mi. Let 09/2012 $100,000 BRIDGE & APPROACHES SH-82: OVER GRAND RIVER, APPROX. 2.7 MILES NORTH OF JCT. OF 21911(04) FFY 2012 SH-82/SH-20 MAYES Div. 8 SH082 0.160 Mi. Let 09/2012 $6,784,000 RIGHT OF WAY SH-69A: OVER PRYOR CREEK, 4.2 MILES EAST OF US-69 (RW FOR 2423504) 24235(05) FFY 2012 MAYES Div. 8 SH069A 0.500 Mi. Let 11/2011 $93,280 UTILITIES SH-69A OVER PRYOR CREEK, 4.2 MILES EAST OF US-69UT FOR 24235(04) 24235(06) FFY 2012 MAYES Div. 8 SH069A 0.500 Mi. Let 11/2011 $1,316,017 RIGHT OF WAY I-35/SH-9 INTERCHANGE (PHASE III) (WEST=19076(04)) (RW FOR 19314(04) 19314(06) FFY 2012 MCCLAIN Div. 3 IS035 0.200 Mi. Let 07/2012 $10,000,000 UTILITIES I-35/SH-9 INTERCHANGE (PHASE III) (WEST=19076(04)) (UT FOR 19314(04)) 19314(07) FFY 2012 MCCLAIN Div. 3 IS035 0.200 Mi. Let 07/2012 $825,000 RIGHT OF WAY SH-76 OVER NORTH FORK WALNUT CREEK, 2.87 MI NORTH OF US-62 (RW FOR 27936(05) FFY 2012 27936(04)) MCCLAIN Div. 3 SH076 0.020 Mi. Let 06/2012 $206,000 UTILITIES SH-76 OVER NORTH FORK WALNUT CREEK, 2.87 MI NORTH OF US-62 (UT FOR 27936(06) FFY 2012 27936(04)) MCCLAIN Div. 3 SH076 0.020 Mi. Let 06/2012 $103,000 RIGHT OF WAY US-70 FROM CHOCTAW COUNTY LINE EXTEND EAST 2.4 MILES (PARALLEL 18853(05) FFY 2012 LANES) R/W FOR 18853(04) MCCURTAIN Div. 2 US070 2.400 Mi. Let 08/2012 $1,030,000 UTILITIES US-70 FROM CHOCTAW COUNTY LINE EXTEND EAST 2.4 MILES (PARALLEL 18853(06) FFY 2012 LANES) UT FOR 18853(04) MCCURTAIN Div. 2 US070 2.400 Mi. Let 08/2012 $206,000 RIGHT OF WAY SH-37 OVER THE RED RIVER RW FOR 26178(04) 26178(05) FFY 2012 MCCURTAIN Div. 2 SH037 0.200 Mi. Let 06/2012 $50,000 UTILITIES SH-37 OVER THE RED RIVER UT FOR 26178(04) 26178(06) FFY 2012 MCCURTAIN Div. 2 SH037 0.200 Mi. Let 06/2012 $50,000 RIGHT OF WAY US-259 OVER RED RIVER AT OKLAHOMA/TEXAS STATE LINERW FOR 27915(05) 27915(05) FFY 2012 MCCURTAIN Div. 2 US259 0.500 Mi. Let 05/2012 $51,500 UTILITIES US-259 OVER RED RIVER AT OKLAHOMA/TEXAS STATE LINEUT FOR 27915(05) 27915(06) FFY 2012 MCCURTAIN Div. 2 US259 0.500 Mi. Let 05/2012 $51,500 RIGHT OF WAY US-266: OVER PUTTY CREEK, 4.7 MI. E OF OKMULGEE C/L(RW FOR: 20731 (04)) 21731(05) FFY 2012 MCINTOSH Div. 1 US266 0.200 Mi. Let 02/2012 $120,840 UTILITIES US-266: OVER PUTTY CREEK, 4.7 MI. E OF OKMULGEE C/L(UT FOR: 20731 (04)) 21731(06) FFY 2012 MCINTOSH Div. 1 US266 0.200 Mi. Let 02/2012 $132,924 RIGHT OF WAY US-266: OVER WAYNE CREEK, 6.2 MILES EAST OF OKMULGEE COUNTY LINE RW 27225(05) FFY 2012 FOR 27037(04) MCINTOSH Div. 1 US266 0.500 Mi. Let 01/2012 $196,100 UTILITIES US-266: OVER WAYNE CREEK, 6.2 MILES EAST OF OKMULGEE COUNTY LINE UT 27225(06) FFY 2012 FOR 27037(04) MCINTOSH Div. 1 US266 0.500 Mi. Let 01/2012 $116,600 BRIDGE WATER PROOF SEAL DIVISION WIDE (BRIDGE WATERPROOF SEAL), FOR DIVISION (1) SILANE 23105(09) FFY 2012 MUSKOGEE Div. 1 0.100 Mi. Let 04/2012 $51,500 SURFACE US-64 FROM BOUNDARY STREET IN PERRY & EXT EAST 7.0 MILE SURFACING 20311(09) FFY 2012 FOR 20311(04) NOBLE Div. 4 US064 7.000 Mi. Let 03/2012 $11,130,963 RIGHT OF WAY US-177: FR US-64 (BILLS CORNER), EXT NORTH 6.1 MILES R/W FOR 20983(04) 20983(05) FFY 2012 NOBLE Div. 4 US177 6.100 Mi. Let 10/2011 $1,376,274 UTILITIES US-177: FR US-64 (BILLS CORNER), EXT NORTH 6.1 MILES UT FOR 20983(04) 20983(06) FFY 2012 NOBLE Div. 4 US177 6.100 Mi. Let 10/2011 $1,099,879 BRIDGE & APPROACHES US-77: OVER BLACK BEAR CREEK APPROX. 4.2 MILE NORTH OF JCT OF 21861(04) FFY 2012 US-77/US-64 NOBLE Div. 4 US077 0.070 Mi. Let 01/2012 $2,044,186 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOF SEAL FOR DIVISION (4) SILANE 23306(09) FFY 2012 NOBLE Div. 4 0.100 Mi. Let 03/2012 $106,000 BRIDGE PAINTING DIVISION (4): BRIDGE PAINTING PROJECTS 23316(04) FFY 2012 NOBLE Div. 4 0.100 Mi. Let 03/2012 $1,060,000 Wednesday, September 28, 2011 page 6 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY SH-164 OVER EAST WARREN CR, 1.3 MI EAST OF THE GARFIELD C/L RW FOR 24237(05) FFY 2012 24237(04) NOBLE Div. 4 SH164 0.100 Mi. Let 11/2011 $116,083 UTILITIES SH-164 OVER EAST WARREN CR, 1.3 MI EAST OF THE GARFIELD C/L UT FOR 24237(06) FFY 2012 24237(04) NOBLE Div. 4 SH164 0.100 Mi. Let 11/2011 $116,083 RIGHT OF WAY SH-156 OVER DEADMAN CR, 0.8 MI SOUTH OF THE KAY C/L RW FOR 24249(04) 24249(05) FFY 2012 NOBLE Div. 4 SH156 0.100 Mi. Let 11/2011 $159,000 UTILITIES SH-156 OVER DEADMAN CR, 0.8 MI SOUTH OF THE KAY C/L UT FOR 24249(04) 24249(06) FFY 2012 NOBLE Div. 4 SH156 0.100 Mi. Let 11/2011 $159,000 CABLE BARRIER CABLE BARRIER: I-35 FROM MM 180 TO MM 182 28977(04) FFY 2012 NOBLE Div. 4 IS035 2.000 Mi. Let 07/2012 $250,000 BRIDGE REHABILITATION SH-28: OVER BIG CREEK APPROX. 4.5 MILES NORTH OF JCT. OF SH-28/US-60 23128(04) FFY 2012 NOWATA Div. 8 SH028 0.120 Mi. Let 09/2012 $1,694,641 RIGHT OF WAY SH-28: OVER THE VERDIGRIS RIVER, 1.0 MILE EAST OF US-169RW FOR 24252(05) FFY 2012 24252(04) NOWATA Div. 8 SH028 0.500 Mi. Let 11/2011 $215,180 UTILITIES SH-28: OVER THE VERDIGRIS RIVER, 1.0 MILE EAST OF US-169UT FOR 24252(06) FFY 2012 24252(04) NOWATA Div. 8 SH028 0.500 Mi. Let 11/2011 $143,100 RIGHT OF WAY US-169: HICKORY CREEK,13.5 MILES NORTH OF JCT. US-60ROW FOR 24750(04) 24750(05) FFY 2012 NOWATA Div. 8 US169 0.250 Mi. Let 04/2012 $53,000 UTILITIES US-169: HICKORY CREEK,13.5 MILES NORTH OF JCT. US-60UT FOR 24750(04) 24750(06) FFY 2012 NOWATA Div. 8 US169 0.250 Mi. Let 04/2012 $53,000 UTILITIES I-235: NW 50TH AND BNSF BRIDGES AND APPROACHES (SEGMENT 4A) UT FOR 09033(12) FFY 2012 09033(16) OKLAHOMA Div. 4 IS235 0.200 Mi. Let 11/2011 $974,400 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 3.4, GR, DR, BR & SURFACE FROM AGNEW WEST 0.7 MI 17428(58) FFY 2012 OKLAHOMA Div. 4 IS040 0.750 Mi. Let 04/2012 $21,528,822 BRIDGE & APPROACHES I-40 CROSSTOWN: DECONSTRUCTION OF THE EXISTING X-TOWN BRIDGE 17428(77) FFY 2012 OKLAHOMA Div. 4 IS040 1.520 Mi. Let 04/2012 $12,000,000 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 3.5, WEST CONNECTION OF NEW XTOWN WITH THE 17428(81) FFY 2012 BOULEVARD OKLAHOMA Div. 4 IS040 0.750 Mi. Let 01/2012 $11,317,219 RIGHT OF WAY I-40: FR MILE MARKER 165 TO 167, LN ADDS & RECONSTRUCTION OF CHOCTAW 20324(05) FFY 2012 RD INTERCHANGE (RW FOR 20324(04) OKLAHOMA Div. 4 IS040 2.000 Mi. Let 11/2011 $2,120,000 UTILITIES I-40: FR MILE MARKER 165 TO 167, LN ADDS & RECONSTRUCTION OF CHOCTAW 20324(06) FFY 2012 RD INTERCHANGE (UT FOR 20324(04)) OKLAHOMA Div. 4 IS040 2.000 Mi. Let 11/2011 $1,060,000 GRADE, DRAIN & SURFACE I-235/HARRISON AVE. NORTH BOUND OFF RAMP RELOCATION TO 10TH STREET 23660(04) FFY 2012 IN OKLAHOMA CITY OKLAHOMA Div. 4 IS235 0.200 Mi. Let 07/2012 $3,320,603 RIGHT OF WAY SH-66: ADD SHOULDERS & RESURFACE BEG APPROX. 14.13 MILE EAST OF I-35 24357(05) FFY 2012 & EXT. EAST APPROX. 2.37 MILE TO THE LINCOLN C/L (RW FOR 24357(04)) OKLAHOMA Div. 4 SH066 2.370 Mi. Let 03/2012 $810,865 UTILITIES SH-66: ADD SHOULDERS & RESURFACE BEG APPROX. 14.13 MILE EAST OF I-35 24357(06) FFY 2012 & EXT. EAST APPROX. 2.37 MILE TO THE LINCOLN C/L (UT FOR 24357(04)) OKLAHOMA Div. 4 SH066 2.370 Mi. Let 03/2012 $659,927 STRIPING & PAVEMENT MARKING OKLAHOMA CITY: INSTALL PAVEMENT MARKINGS ON THE INTERSTATE 26457(04) FFY 2012 HIGHWAYS AT VARIOUS LOCATION IN THE OKC METRO AREA OKLAHOMA Div. 4 IS040 1.000 Mi. Let 01/2012 $649,075 CABLE BARRIER I-240: CABLE BARRIER FROM SOONER RD. E. 3.0 MIS. TO DOUGLAS BLVD. 28975(04) FFY 2012 OKLAHOMA Div. 4 IS240 3.000 Mi. Let 07/2012 $450,000 RIGHT OF WAY US-266: OVER HOFFMAN CREEK APPROX. 8.7 MI. EAST OF US-62(RW FOR 21739(05) FFY 2012 212739(04)) OKMULGEE Div. 1 US266 0.200 Mi. Let 02/2012 $27,000 UTILITIES US-266: OVER HOFFMAN CREEK APPROX 8.7 MI. EAST OF US-62(UT FOR 21739(06) FFY 2012 21739(04)) OKMULGEE Div. 1 US266 0.200 Mi. Let 02/2012 $16,700 RIGHT OF WAY US-75A BEG AT JCT US-75A/SH-16 & EXTEND NORTH 8.0 MILE TO THE CREEK 24369(06) FFY 2012 C/L.(RW FOR 24369(04)(05)) OKMULGEE Div. 1 US075A 8.000 Mi. Let 11/2011 $3,100,000 UTILITIES US-75A BEG AT JCT US-75A/SH-16 & EXTEND NORTH 8.0 MILE TO THE CREEK 24369(07) FFY 2012 C/L.(UT FOR 24369(04)(05)) OKMULGEE Div. 1 US075A 8.000 Mi. Let 11/2011 $980,000 Wednesday, September 28, 2011 page 7 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE PAINTING I-40: COUNTY BRIDGE OVER/I-40 UNDER, 2.6 MILES EAST OF OKFUSKEE 27034(04) FFY 2012 COUNTY LINE (INCL FLAME STR BEAM REPAIR) OKMULGEE Div. 1 IS040 0.040 Mi. Let 02/2012 $164,300 BRIDGE & APPROACHES SH-18: OVER LOST MAN CREEK, APPROX. 2.0 MILES NORTH OF JCT. OF 21913(04) FFY 2012 SH-18/US-60 OSAGE Div. 8 SH018 0.050 Mi. Let 06/2012 $1,258,220 RIGHT OF WAY SH-99: OVER AN ABANDONED RR, 11.6 MILES NORTH OF SH-20RW FOR 24261(05) FFY 2012 24261(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-99: OVER AN ABANDONED RR, 11.6 MILES NORTH OF SH-20UT FOR 24261(06) FFY 2012 24261(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 RIGHT OF WAY SH-18: OVER SALT CREEK, 2.0 MILES NORTH OF THE PAWNEE C/LRW FOR 24262(05) FFY 2012 24262(04) OSAGE Div. 8 SH018 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-18: OVER SALT CREEK, 2.0 MILES NORTH OF THE PAWNEE C/LUT FOR 24262(06) FFY 2012 24262(04) OSAGE Div. 8 SH018 0.500 Mi. Let 11/2011 $106,000 RIGHT OF WAY SH-99: OVER BIRCH CREEK, 1.4 MILES SOUTH OF SOUTH SH-11 RW FOR 24263(05) FFY 2012 24263(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-99: OVER BIRCH CREEK, 1.4 MILES SOUTH OF SOUTH SH-11 UT FOR 24263(06) FFY 2012 24263(04) OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 RIGHT OF WAY SH-99: OVER ROCK CREEK, 6.6 MILES NORTH OF US-60 RW FOR 24264(04) 24264(05) FFY 2012 OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 UTILITIES SH-99: OVER ROCK CREEK, 6.6 MILES NORTH OF US-60 UT FOR 24264(04) 24264(06) FFY 2012 OSAGE Div. 8 SH099 0.500 Mi. Let 11/2011 $106,000 BRIDGE PAINTING SH 99 OVER PENN CREEK, .3 MILES NORTH OF JCT SH 20 28932(05) FFY 2012 OSAGE Div. 8 SH099 0.100 Mi. Let 07/2012 $190,000 BRIDGE & APPROACHES US-69: OVER TAR CREEK, APPROX. 7.7 MILES NORTH OF JCT. US-69/US-59 21916(04) FFY 2012 OTTAWA Div. 8 US069 0.060 Mi. Let 09/2012 $2,818,447 BRIDGE & APPROACHES SH-10: OVER SYCAMORE CREEK, APPROX. 8.3 MILES NORTH OF THE 21918(04) FFY 2012 DELAWARE COUNTY LINE OTTAWA Div. 8 SH010 0.050 Mi. Let 07/2012 $2,836,460 RIGHT OF WAY SH-10: OVER SPRING RIVER, 3.7 MILES WEST OF SH-10CRW FOR 24272(04) 24272(05) FFY 2012 (TIED W/ 2427805) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $265,000 UTILITIES SH-10: OVER SPRING RIVER, 3.7 MILES WEST OF SH-10CUT FOR 24272(04) 24272(06) FFY 2012 (TIED W/ 2427806) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $265,000 RIGHT OF WAY US-60: OVER HORSE CREEK, 2.6 MILES NORTH OF THE DELAWARE C/LRW FOR 24273(05) FFY 2012 24273(04) OTTAWA Div. 8 US060 0.500 Mi. Let 01/2012 $106,000 UTILITIES US-60: OVER HORSE CREEK, 2.6 MILES NORTH OF THE DELAWARE C/LUT FOR 24273(06) FFY 2012 24273(04) OTTAWA Div. 8 US060 0.500 Mi. Let 01/2012 $106,000 RIGHT OF WAY US-59 OVER HORSE CR. TRIB, 4.5 MI N.W. OF THE DELAWARE C/LRW FOR 24274(05) FFY 2012 24274(04) OTTAWA Div. 8 US059 0.500 Mi. Let 01/2012 $106,000 UTILITIES US-59 OVER HORSE CR. TRIB, 4.5 MI N.W. OF THE DELAWARE C/LUT FOR 24274(06) FFY 2012 24274(04) OTTAWA Div. 8 US059 0.500 Mi. Let 01/2012 $106,000 RIGHT OF WAY SH-137: OVER AN UNNAMED CREEK, 4.0 MILES NORTH OF US-60RW FOR 24275(05) FFY 2012 24275(04) OTTAWA Div. 8 SH137 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH-137: OVER AN UNNAMED CREEK, 4.0 MILES NORTH OF US-60UT FOR 24275(06) FFY 2012 24275(04) OTTAWA Div. 8 SH137 0.500 Mi. Let 01/2012 $106,000 RIGHT OF WAY SH-10C OVER LOST CR, 3.3 MILES EAST OF SH-10RW FOR 24277(04) 24277(05) FFY 2012 OTTAWA Div. 8 SH010C 0.500 Mi. Let 01/2012 $371,000 UTILITIES SH-10C OVER LOST CR, 3.3 MILES EAST OF SH-10UT FOR 24277(04) 24277(06) FFY 2012 OTTAWA Div. 8 SH010C 0.500 Mi. Let 01/2012 $371,000 RIGHT OF WAY SH-10 OVER SPRING RIVER O'FLOW, 3.5 MI WEST OF SH-10CRW FOR 24278(04) 24278(05) FFY 2012 (TIED W/ 2427205) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $106,000 UTILITIES SH-10 OVER SPRING RIVER O'FLOW, 3.5 MI WEST OF SH-10CUT FOR 24278(04) 24278(06) FFY 2012 (TIED W/ 2427206) OTTAWA Div. 8 SH010 0.500 Mi. Let 01/2012 $106,000 Wednesday, September 28, 2011 page 8 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES US-64: OVER PANTHER CREEK, 0.9 MILES EAST OF NOBLE COUNTY LINE (TIED 20896(04) FFY 2012 W/ 2089804) PAWNEE Div. 8 US064 0.020 Mi. Let 09/2012 $1,123,600 BRIDGE & APPROACHES US-64: OVER BNSF RAILROAD, 6.1 MILES EAST OF SH-18 20897(04) FFY 2012 PAWNEE Div. 8 US064 0.030 Mi. Let 09/2012 $1,693,204 BRIDGE REPAIR US-64: OVER AN UNNAMED CREEK, 1.9 MILES EAST OF NOBLE COUNTY LINE 20898(04) FFY 2012 (BOX STR) (TIED W/ 20896(04) PAWNEE Div. 8 US064 0.010 Mi. Let 09/2012 $341,850 RIGHT OF WAY US-64: PEDESTRIAN BRIDGE OVER US-64, APPROX. 0.2 MILES SOUTH OFJCT. 23158(05) FFY 2012 US-64/SH-99 (RW FOR 2315804) PAWNEE Div. 8 US064 0.050 Mi. Let 07/2012 $409,940 UTILITIES US-64: PEDESTRIAN BRIDGE OVER US-64, APPROX. 0.2 MILES SOUTH OFJCT. 23158(06) FFY 2012 US-64/SH-99 (UT FOR 2315804) PAWNEE Div. 8 US064 0.050 Mi. Let 07/2012 $368,740 RIGHT OF WAY US-64 OVER AN UNNAMED CR, 2.5 MI EAST OF SH-99RW FOR 24321(04) 24321(05) FFY 2012 PAWNEE Div. 8 US064 0.500 Mi. Let 01/2012 $106,000 UTILITIES US-64 OVER AN UNNAMED CR, 2.5 MI EAST OF SH-99UT FOR 24321(04) 24321(06) FFY 2012 PAWNEE Div. 8 US064 0.500 Mi. Let 01/2012 $106,000 BRIDGE PAINTING SH 18 OVER COAL CREEK, 7.5 MILES NORTH OF JCT US 64 28934(04) FFY 2012 PAWNEE Div. 8 SH018 0.100 Mi. Let 08/2012 $120,000 GRADE,DRAINING,BRIDGE & SURFACE US-177: FROM THE LINCOLN C/L N. TO THE PERKINS CITY LIMITS, INCLUDES 20332(04) FFY 2012 BRIDGE REPLACEMENTS AT THE CIMARRON RIVER & DUGOUT CREEK PAYNE Div. 4 US177 2.210 Mi. Let 08/2012 $7,135,181 GRADE, DRAIN & SURFACE US-177: BEG. APPROX. 1.5 MILE SOUTH OF JCT OF SH-33 & EXTENDING NORTH 21932(04) FFY 2012 PAYNE Div. 4 US177 1.500 Mi. Let 08/2012 $6,188,679 CABLE BARRIER I-35: CABLE BARRIER FROM MM 170 TO MM 174 28976(04) FFY 2012 PAYNE Div. 4 IS035 4.000 Mi. Let 07/2012 $500,000 INTERCHANGE C-TREE ROAD OVER US-69 AT MCALESTER ARMY AMMUNITION PLANT 28995(04) FFY 2012 PITTSBURG Div. 2 US069 0.200 Mi. Let 09/2012 $2,650,000 RIGHT OF WAY C-TREE ROAD OVER US-69 AT MCALESTER ARMY AMMUNITION PLANT RW 28995(05) FFY 2012 FOR 28995(04) PITTSBURG Div. 2 US069 0.200 Mi. Let 07/2012 $50,000 UTILITIES C-TREE ROAD OVER US-69 AT MCALESTER ARMY AMMUNITION PLANT UT FOR 28995(06) FFY 2012 28995(04) PITTSBURG Div. 2 US069 0.200 Mi. Let 07/2012 $50,000 BRIDGE PAINTING DIVISION 3: BRIDGE PAINT PROJECTS 21925(04) FFY 2012 PONTOTOC Div. 3 0.000 Mi. Let 04/2012 $700,000 JOINT SEAL/REPAIR DIVISION 3: BRIDGE JOINT SEAL/REPAIR PROJECTS 21926(04) FFY 2012 PONTOTOC Div. 3 0.000 Mi. Let 04/2012 $300,000 BRIDGE WATER PROOF SEAL DIVISION 3: BRIDGE WATER PROOFING SEAL (SILANE) 22973(10) FFY 2012 PONTOTOC Div. 3 0.000 Mi. Let 04/2012 $100,000 RIGHT OF WAY I-40: INGRESS/EGRESS IMPROVEMENT AT MILE MARK 187 (RW FOR 27133(04) 27133(05) FFY 2012 POTTAWATOMIE Div. 3 IS040 1.160 Mi. Let 04/2012 $2,400,000 UTILITIES I-40: INGRESS/EGRESS IMPROVEMENT AT MILE MARK 187 (UT FOR 27133(04) 27133(06) FFY 2012 POTTAWATOMIE Div. 3 IS040 1.160 Mi. Let 04/2012 $140,000 BRIDGE WATER PROOF SEAL DIVISION WIDE (BRIDGE WATERPROOF SEAL), FOR DIVISION (2) SILANE 23144(09) FFY 2012 PUSHMATAHA Div. 2 0.100 Mi. Let 04/2012 $53,000 JOINT SEAL/REPAIR DIVISION 2 - BRIDGE MAINTENANCE - VARIOUS LOCATIONS (JOINT REPAIR) 23145(05) FFY 2012 (16629,16633,15860,13511) PUSHMATAHA Div. 2 0.100 Mi. Let 01/2012 $200,000 BRIDGE PAINTING DIVISION 2 - MAINTENANCE - VARIOUS LOCATIONS BRIDGE PAINTING 23145(07) FFY 2012 (16629,16633,15860,13511,13499) PUSHMATAHA Div. 2 0.100 Mi. Let 01/2012 $800,000 RIGHT OF WAY US-271: OVER KIAMICHI RIVER, APPROX 2.0 MI NORTH OF SH-3 RW FOR 26346(05) FFY 2012 26346(04) PUSHMATAHA Div. 2 US271 0.100 Mi. Let 08/2012 $445,200 UTILITIES US-271: OVER KIAMICHI RIVER, APPROX 2.0 MI NORTH OF SH-3 UT FOR 26346(06) FFY 2012 26346(04) PUSHMATAHA Div. 2 US271 0.100 Mi. Let 08/2012 $53,000 BRIDGE & APPROACHES SH-33: OVER NINE-MILE CR APPROX. 11.4 MI EAST OF SH-33/US-283 JCT 21702(04) FFY 2012 ROGER MILLS Div. 5 SH033 0.500 Mi. Let 10/2011 $2,062,405 Wednesday, September 28, 2011 page 9 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY SH-47 OVER RUSH CREEK APPROX. 0.5 MILE SOUTH OF JCT SH-47/SH-30.(RW 24358(05) FFY 2012 FOR 24358(04)) ROGER MILLS Div. 5 SH047 0.500 Mi. Let 12/2011 $97,718 UTILITIES SH-47 OVER RUSH CREEK APPROX. 0.5 MILE SOUTH OF JCT SH-47/SH-30.(UT 24358(06) FFY 2012 FOR 24358(04)) ROGER MILLS Div. 5 SH047 0.500 Mi. Let 12/2011 $84,739 RIGHT OF WAY I-44: INTERCHANGE AT 163RD STREET IN THE CITY OF TULSA (RW FOR 20315(05) FFY 2012 20315(04) ( IM EARMARK) ROGERS Div. 8 IS044 0.040 Mi. Let 03/2012 $4,425,243 UTILITIES I-44: INTERCHANGE AT 163RD STREET UT FOR 20315(04) (IM EARMARK) 20315(06) FFY 2012 ROGERS Div. 8 IS044 0.040 Mi. Let 03/2012 $2,232,237 RIGHT OF WAY SH-20: INTERSECTION AT SH-20 & CLUBHOUSE/SOUTHAVEN ROAD, APPROX. 27167(05) FFY 2012 9.5 MILES EAST OF TULSA COUNTY LINE (RW FOR 27167(04) ROGERS Div. 8 SH020 0.100 Mi. Let 09/2012 $257,500 UTILITIES SH-20: INTERSECTION AT SH-20 & CLUBHOUSE/SOUTHAVEN ROAD, APPROX. 27167(06) FFY 2012 9.5 MILES EAST OF TULSA COUNTY LINE (UT FOR 27167(04) ROGERS Div. 8 SH020 0.100 Mi. Let 09/2012 $257,500 RIGHT OF WAY US-64: OVER BIG SALLISAW CREEK, 3.1 MILES WEST OF US-59 IN SALLISAW. 09242(15) FFY 2012 RW FOR 09242(06) SEQUOYAH Div. 1 US064 0.070 Mi. Let 02/2012 $297,398 UTILITIES US-64: OVER BIG SALLISAW CREEK, 3.1 MILES WEST OF US-59 IN SALLISAW.UT 09242(16) FFY 2012 FOR 09242(06) SEQUOYAH Div. 1 US064 0.070 Mi. Let 02/2012 $358,000 WIDEN, RESURFACE & BRIDGE SH-100: FROM GORE NORTH 6.25(EXTENDING 2 BRIDGE RCB STRUCTURES) 12531(04) FFY 2012 SEQUOYAH Div. 1 SH100 6.250 Mi. Let 08/2012 $10,150,676 UTILITIES US-81: SOUTH CONNECTION BYPASS, NORTHWESTERLY TO RELOCATED SH-7 20316(06) FFY 2012 AT 27THSTREET (UT FOR 20316(04) STEPHENS Div. 7 US081 1.600 Mi. Let 12/2011 $872,000 BRIDGE PAINTING DIVISION SEVEN BRIDGE PAINT (SITES TO BE DEFINED AT ALATER DATE) 20328(05) FFY 2012 STEPHENS Div. 7 0.000 Mi. Let 06/2012 $520,000 JOINT SEAL/REPAIR DIVISION SEVEN BRIDGE JOINT SEAL/REPAIR (SITES TO BE DEFINED AT 20328(08) FFY 2012 ALATER DATE) STEPHENS Div. 7 0.000 Mi. Let 06/2012 $400,000 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOFING SEAL FOR DIVISION 7 (FFY 2012) 23125(09) FFY 2012 STEPHENS Div. 7 0.000 Mi. Let 04/2012 $80,000 GRADE,DRAINING,BRIDGE & SURFACE I-44: AT LEWIS AVENUE (RECONSTRUCT TO 6 LANES) (IM EARMARK) 06374(47) FFY 2012 TULSA Div. 8 IS044 1.200 Mi. Let 06/2012 $51,697,928 BRIDGE REPAIR US-64: OVER EUCHEE CREEK, 6.4 MILES SOUTHEAST OF OSAGE COUNTY LINE 20925(04) FFY 2012 (BOX STR) TULSA Div. 8 US064 0.010 Mi. Let 06/2012 $636,000 RIGHT OF WAY SH-266 OVER US-169 APPROX. 5.8 MILE NORTH OF JCT US-169/I-44.(RW FOR 23167(05) FFY 2012 2316704) TULSA Div. 8 SH266 0.040 Mi. Let 05/2012 $409,940 UTILITIES SH-266 OVER US-169 APPROX. 5.8 MILE NORTH OF JCT US-169/I-44.(UT FOR 23167(06) FFY 2012 2316704) TULSA Div. 8 SH266 0.040 Mi. Let 05/2012 $368,740 SAFETY IMPROVEMENT SAFETY IMPROVEMENT PROJECTS WITHIN DIVISION 8(SITES TO BE SELECTED 23170(04) FFY 2012 LATER) TULSA Div. 8 0.000 Mi. Let 08/2012 $1,000,000 BRIDGE & APPROACHES I-244 OVER I-244 RAMP W-N APPROX. 5.39 MILE EAST OF JCT I-244/I-444. 23171(04) FFY 2012 TULSA Div. 8 IS244 0.050 Mi. Let 03/2012 $1,811,148 BRIDGE WATER PROOF SEAL 2012 DIVISION 8 SILANE PROJECTS (BRIDGES TO BE DETERMINED LATER) 23185(09) FFY 2012 TULSA Div. 8 0.000 Mi. Let 03/2012 $325,000 RIGHT OF WAY SH-11: OVER HOMINY CREEK APPROX. 7.4 MILES SOUTH OF THE WASHINGTON 24365(05) FFY 2012 C/L(RW FOR 2436504) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $248,230 UTILITIES SH-11: OVER HOMINY CREEK APPROX. 7.4 MILES SOUTH OF THE WASHINGTON 24365(06) FFY 2012 C/L(UT FOR 2436504) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $140,080 RIGHT OF WAY SH-11: OVER FLAT ROCK CREEK, APPROX. 15.2 MILES SOUTH OF THE 24365(08) FFY 2012 WASHINGTON C/L (RW FOR 2436507) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $248,230 UTILITIES SH-11: OVER FLAT ROCK CREEK, APPROX. 15.2 MILES SOUTH OF THE 24365(09) FFY 2012 WASHINGTON C/L (UT FOR 2436507) TULSA Div. 8 SH011 0.500 Mi. Let 07/2012 $140,080 RIGHT OF WAY SH-11: DELAWARE CREEK, 11 MI. SOUTH OF WASHINGTON COUNTY LINEROW 27066(05) FFY 2012 FOR 27066(04) TULSA Div. 8 SH011 0.250 Mi. Let 04/2012 $53,000 Wednesday, September 28, 2011 page 10 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH-11: DELAWARE CREEK, 11 MI. SOUTH OF WASHINGTON COUNTY LINEUT 27066(06) FFY 2012 FOR 27066(04) TULSA Div. 8 SH011 0.250 Mi. Let 04/2012 $53,000 BRIDGE REHABILITATION I-244: I-244 E-S RAMP( I-444 UNDER), APPROX. 6.9 MI. NORTH OF I-44 (IM 27929(04) FFY 2012 EARMARK) TULSA Div. 8 IS244 0.250 Mi. Let 05/2012 $2,020,792 BRIDGE PAINTING GARNETT ROAD OVER I-244, .53 MILES EAST OF JCT US 169 28935(04) FFY 2012 TULSA Div. 8 IS244 0.100 Mi. Let 08/2012 $250,000 GRADE & DRAIN SH-51: FR TAYLOR'S FERRY AREA, APPROX 7.8 MILE EAST OF JCT 10006(07) FFY 2012 SH-51/US-69,EXT EAST TO SEQUOYAH STATE PARK IN CHEROKEE CO. WAGONER Div. 1 SH051 1.770 Mi. Let 06/2012 $11,742,000 BRIDGE PAINTING US 69 NORTHBOUND OVER MP & UP RR, 0.7 AND 1.5 MILES NORTH OF JCT SH 16233(07) FFY 2012 51 WAGONER Div. 1 US069 0.200 Mi. Let 02/2012 $243,800 INTERSECT MODIF US-75: AT US-60 IN BARTLESVILLE 21903(04) FFY 2012 WASHINGTON Div. 8 US075 0.040 Mi. Let 04/2012 $371,000 RIGHT OF WAY US-60: BEGIN APPROX. 2.5 MILES EAST OF US-75, IN BARTLESVILLE, & EXTEND 24242(05) FFY 2012 EAST APPROX. 4.48 MILES TO THE NOWATA C/L (RW FOR 24242(04) WASHINGTON Div. 8 US060 4.480 Mi. Let 08/2012 $720,154 UTILITIES US-60: BEGIN APPROX. 2.5 MILES EAST OF US-75, IN BARTLESVILLE, & EXTEND 24242(06) FFY 2012 EAST APPROX. 4.48 MILES TO THE NOWATA C/L (UT FOR 2424204) WASHINGTON Div. 8 US060 4.480 Mi. Let 08/2012 $1,132,339 BRIDGE & APPROACHES US-64 OVER WHITE HORSE CREEK APPROX. 9.0 MILE EAST OF JCT US-64/SH-50. 24243(04) FFY 2012 WOODS Div. 6 US064 0.500 Mi. Let 05/2012 $3,051,814 BRIDGE & APPROACHES US-64 OVER UNNAMED CREEK APPROX. 3.1 MILE EAST OF JCT US-64/SH-14. 24318(04) FFY 2012 WOODS Div. 6 US064 0.200 Mi. Let 04/2012 $942,205 RIGHT OF WAY US-64: OVER RED HORSE CREEK, 5.3 MILES EAST OF SH-50 JCT. RW FOR 27010(05) FFY 2012 27010(04) WOODS Div. 6 US064 1.000 Mi. Let 02/2012 $160,000 UTILITIES US-64: OVER RED HORSE CREEK, 5.3 MILES EAST OF SH-50 JCT. UT FOR 27010(06) FFY 2012 27010(04) WOODS Div. 6 US064 1.000 Mi. Let 02/2012 $160,000 GRADE, DRAIN & SURFACE US-412: FR APPROX 10 MI EAST OF MOORELAND EAST 4.1 MILES 10061(07) FFY 2012 WOODWARD Div. 6 US412 4.100 Mi. Let 08/2012 $7,150,000 RIGHT OF WAY SH-15 BEG APPROX. 3.1 MI EAST OF THE ELLIS C/L & EXT EAST APPROX. 2.95 24159(05) FFY 2012 MI. RW FOR 24159(07) WOODWARD Div. 6 SH015 2.950 Mi. Let 04/2012 $350,000 RIGHT OF WAY SH-15 OVER TURKEY (BULL) CREEK APPROX. 2.1 MILE EAST OF THE ELLIS C/L 24368(05) FFY 2012 RW FOR 24368(04) WOODWARD Div. 6 SH015 1.000 Mi. Let 01/2012 $152,297 UTILITIES SH-15 OVER TURKEY (BULL) CREEK APPROX. 2.1 MILE EAST OF THE ELLIS C/L 24368(06) FFY 2012 UT FOR 24368(04) WOODWARD Div. 6 SH015 1.000 Mi. Let 01/2012 $139,706 Wednesday, September 28, 2011 page 11 FFY 2013 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt Federal Fiscal Year 2013 GRADE & DRAIN US-59: FR 2 MILES NORTH OF WESTVILLE TO EXTEND NORTH 4.95 MI.(4 OR 5 16928(09) FFY 2013 LANE) ADAIR Div. 1 US059 4.950 Mi. Let 02/2013 $10,800,000 BRIDGE & APPROACHES SH-11: OVER SALT FORK RIVER & OVERFLOW APPROX. 5.1,5.7, 6.4 & 6.8 MI. 20940(04) FFY 2013 EAST OF THE JUNCTION OF SH-11/US-64 ALFALFA Div. 6 SH011 2.100 Mi. Let 11/2012 $8,784,657 BRIDGE & APPROACHES US-64 OVER EAST CLAY CR, 1.0 MI EAST OF SH-8 26493(04) FFY 2013 ALFALFA Div. 6 US064 1.000 Mi. Let 06/2013 $2,019,400 RIGHT OF WAY SH-23 FROM 1.0 MI SOUTH OF THE TEXAS ST. LN., EXTEND NORTH APPROX 3.0 24067(05) FFY 2013 MI (1.0 MILE IN TEXAS) RW FOR 24067(04) BEAVER Div. 6 SH023 2.000 Mi. Let 03/2013 $127,287 BRIDGE & APPROACHES SH-30: OVER NORTH FORK OF RED RIVER, 5.0 MI NORTH OF I-40 23243(04) FFY 2013 BECKHAM Div. 5 SH030 1.000 Mi. Let 04/2013 $7,931,000 RIGHT OF WAY SH-152 FROM SH-6 EAST 4.0 MI ROW FOR 24352(04) 24352(05) FFY 2013 BECKHAM Div. 5 SH152 4.000 Mi. Let 11/2012 $218,000 GRADE, DRAIN & SURFACE US-/270: FROM 3.0 MI SOUTH OF SH-33 IN WATONGA, SOUTH 2.25 MI(SURFACE 20237(07) FFY 2013 NEW PARALLEL LANES AND REHAB EXISTING) SURFACING FOR (08) BLAINE Div. 5 US270 2.250 Mi. Let 01/2013 $4,738,000 GRADE,DRAINING,BRIDGE & SURFACE SH-78/SH-48 : FR JCT US 69, NORTH 2.4 MILES TO JCT SH 48. 07092(04) FFY 2013 BRYAN Div. 2 SH078 2.400 Mi. Let 05/2013 $12,582,685 RIGHT OF WAY SH-78 FROM ACHILLE NORTH 4.17 MI RW FOR 24088(04) 24088(05) FFY 2013 BRYAN Div. 2 SH078 4.170 Mi. Let 05/2013 $567,736 UTILITIES SH-78 FROM ACHILLE NORTH 4.17 MI UT FOR 24088(04) 24088(06) FFY 2013 BRYAN Div. 2 SH078 4.170 Mi. Let 05/2013 $218,360 RIGHT OF WAY SH-78 FROM 4.17 MI NORTH OF ACHILLE NORTH 5.0 MI TO DURANT BYPASS 24389(05) FFY 2013 RW FOR 24389(04) BRYAN Div. 2 SH078 5.000 Mi. Let 07/2013 $681,250 UTILITIES SH-78 FROM 4.17 MI NORTH OF ACHILLE NORTH 5.0 MI TO DURANT BYPASS UT 24389(06) FFY 2013 FOR 24389(04) BRYAN Div. 2 SH078 5.000 Mi. Let 07/2013 $272,500 BRIDGE & APPROACHES US-69B: OVER MINERAL BAYOU CR, 0.5 MI SOUTH OF US-70 26231(04) FFY 2013 BRYAN Div. 2 US069B 0.100 Mi. Let 05/2013 $1,308,000 RIGHT OF WAY SH-58 FROM SH-152 S. OF EAKLY, EXT. N. 6.0 MILESRW FOR 24092(04) 24092(05) FFY 2013 CADDO Div. 7 SH058 6.000 Mi. Let 04/2013 $103,000 UTILITIES SH-58 FROM SH-152 S. OF EAKLY, EXT. N. 6.0 MILESUT FOR 24092(04) 24092(06) FFY 2013 CADDO Div. 7 SH058 6.000 Mi. Let 04/2013 $935,343 GRADE,DRAINING,BRIDGE & SURFACE SH19: FROM 1.7 MI EAST OF THE KIOWA C/L EAST 0.5 MI(CURVE CORRECTION) 24414(04) FFY 2013 CADDO Div. 7 SH019 0.500 Mi. Let 01/2013 $2,527,847 BRIDGE REPAIR I-40: RCB REPAIR AT MILEPOST 103.5. 26488(07) FFY 2013 CADDO Div. 5 IS040 0.100 Mi. Let 10/2012 $687,834 RIGHT OF WAY SH-58: WIDEN & OVERLAY, BEGIN 0.65 MIS N. OF SH-9 EXTEND N. 1.65 MIS.(RW 28815(05) FFY 2013 FOR 28815(04), 27039(04) AND 28027(04)) CADDO Div. 7 SH058 1.650 Mi. Let 03/2013 $1,571,325 UTILITIES SH-58: WIDEN & OVERLAY, BEGIN 0.65 MIS N. OF SH-9 EXTEND N. 1.65 MIS.(UT 28815(06) FFY 2013 FOR 28815(04), 27039(04) AND 28027(04)) CADDO Div. 7 SH058 1.650 Mi. Let 03/2013 $1,405,600 RIGHT OF WAY US-281: OVER THE SOUTH CANADIAN RV AT THE CADDO C/L RW FOR 26360(05) FFY 2013 26360(04) CANADIAN Div. 4 US281 0.500 Mi. Let 10/2012 $545,000 UTILITIES US-281: OVER THE SOUTH CANADIAN RV AT THE CADDO C/L UT FOR 26360(04) 26360(06) FFY 2013 CANADIAN Div. 4 US281 0.500 Mi. Let 10/2012 $545,000 GRADE,DRAINING,BRIDGE & SURFACE SH-53 OVER CADDO CR, CADDO CR O'FLOWS AND BEAR CR., BEGIN APPROX 23291(04) FFY 2013 5.5 MIE. OF SH-76, EXT. E. APPROX 1.37 MI CARTER Div. 7 SH053 1.370 Mi. Let 01/2013 $7,104,387 RIGHT OF WAY SH-53 FROM 6.87 MI EAST OF SH-76, E. APPROX 6.13 MI ROW FOR 24104(04) 24104(05) FFY 2013 AND 24105(05) CARTER Div. 7 SH053 6.130 Mi. Let 02/2013 $1,442,000 RIGHT OF WAY SH-51: BEGIN AT US-62 JCT AND EXTEND SE 0.75 MI. (BARON FORK BR)RW FOR 10437(05) FFY 2013 10437(04) CHEROKEE Div. 1 SH051 0.750 Mi. Let 01/2013 $365,700 Wednesday, September 28, 2011 page 12 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH-51: BEGIN AT US-62 JCT AND EXTEND SE 0.75 MI. (BARON FORK BR)UT FOR 10437(06) FFY 2013 10437(04) CHEROKEE Div. 1 SH051 0.750 Mi. Let 01/2013 $152,600 BRIDGE PAINTING SH-51: OVER DOUBLE SPRING CREEK, 7.0 MILES EAST OF THE WAGONER CO 27044(04) FFY 2013 LINE CHEROKEE Div. 1 SH051 0.040 Mi. Let 01/2013 $180,000 RIGHT OF WAY SH-100: BRIDGE OVER DRY CREEK, 0,5 MILES EAST OF JCT SH-82RW FOR JP 28029(05) FFY 2013 28029(04) CHEROKEE Div. 1 SH100 0.500 Mi. Let 08/2013 $625,400 UTILITIES SH-100: BRIDGE OVER DRY CREEK, 0,5 MILES EAST OF JCT SH-82UT FOR JP 28029(06) FFY 2013 28029(04) CHEROKEE Div. 1 SH100 0.500 Mi. Let 08/2013 $466,400 BANK PROTECTION/RIP-RAP SH-10: FROM APPROX. 2 MILES NORTH OF JCT. SH-51(ILLINOIS RIVER) 28970(04) FFY 2013 CHEROKEE Div. 1 SH010 0.200 Mi. Let 06/2013 $950,000 GRADE, DRAIN & SURFACE I-35: 6 LANE FROM 0.5 MI SOUTH OF MAIN ST, NORTH 1.0 MI IN NORMAN (I-35 09031(10) FFY 2013 MAINLINE AT MAIN STREET) CLEVELAND Div. 3 IS035 1.000 Mi. Let 11/2012 $12,826,000 GRADE & DRAIN I-35: 6 LANE FROM RIVER, NORTH 0.34 MI IN NORMAN (SH-9 RAMP 09031(11) FFY 2013 CONSTRUCTION INCLUDING SURCHARGE) CLEVELAND Div. 3 IS035 0.340 Mi. Let 06/2013 $5,300,000 GRADE,DRAINING,BRIDGE & SURFACE SH-9: FROM JUST WEST OF 24TH, EAST TO 36TH STREET IN NORMAN 20266(04) FFY 2013 CLEVELAND Div. 3 SH009 1.250 Mi. Let 05/2013 $3,675,000 BRIDGE REHABILITATION I-35 OVER SOUTH CANADIAN RIVER IN NORMAN (BRIDGE WIDENING) 27896(04) FFY 2013 CLEVELAND Div. 3 IS035 0.710 Mi. Let 09/2013 $19,600,000 RIGHT OF WAY US-75 OVER COAL CREEK, 2.2 MI NORTH OF ATOKA C/L (RW FOR 20317(04)) 20317(05) FFY 2013 COAL Div. 3 US075 0.020 Mi. Let 04/2013 $163,461 UTILITIES US-75 OVER COAL CREEK, 2.2 MI NORTH OF ATOKA C/L (UT FOR 20317(04)) 20317(06) FFY 2013 COAL Div. 3 US075 0.020 Mi. Let 04/2013 $108,974 GRADE,DRAINING,BRIDGE & SURFACE US-277: BEG 0.04 MIS E. OF US-62 JCT. AT PORTER HILL & EXT. E. APPROX4.46 21717(04) FFY 2013 MIS COMANCHE Div. 7 US277 4.460 Mi. Let 04/2013 $13,790,057 BRIDGE & APPROACHES SH-17 OVER WHISKEY CREEK BEGIN APPROX. 0.79 MILE WEST OF SH-65. 23297(04) FFY 2013 COMANCHE Div. 7 SH017 0.250 Mi. Let 03/2013 $3,995,859 BRIDGE & APPROACHES I-44 BRIDGE REPLACEMENT, REHAB, & SAFETY UPGRADES AT VARIOUS 27165(04) FFY 2013 BRIDGES IN THE TRI-LEVEL INTERCHANGE IN LAWTON COMANCHE Div. 7 IS044 0.450 Mi. Let 01/2013 $2,450,622 RIGHT OF WAY US-277 OVER DEEP RED CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 28036(05) FFY 2013 2.9MIS N. OF JCT US-70 EXTEND N. APPROX 0.85 MIS. COTTON Div. 7 US277 0.850 Mi. Let 11/2012 $50,100 UTILITIES US-277 OVER DEEP RED CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 28036(06) FFY 2013 2.9MIS N. OF JCT US-70 EXTEND N. APPROX 0.85 MIS. COTTON Div. 7 US277 0.850 Mi. Let 11/2012 $151,100 RIGHT OF WAY SH-5A OVER WEST CACHE CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 3.45 MIS E. OF JCT US-277 EXTEND E. APPROX 0.55 MIS. (RW FOR J.P. 28037(04) 28037(05) FFY 2013 COTTON Div. 7 SH005A 0.550 Mi. Let 11/2012 $103,000 UTILITIES SH-5A OVER WEST CACHE CREEK AND TWO O'FLOW BRIDGES BEGIN APPROX 28037(06) FFY 2013 3.45 MIS E. OF JCT US-277 EXTEND E. APPROX 0.55 MIS. (UT FOR J.P. 28037(04) COTTON Div. 7 SH005A 0.550 Mi. Let 11/2012 $257,500 RIGHT OF WAY US-59: OVER THE MKT RAILROAD, 1.1 MILES NORTH OF SH-10(RW FOR 24115(05) FFY 2013 2411504) CRAIG Div. 8 US059 0.500 Mi. Let 01/2013 $249,260 UTILITIES US-59: OVER THE MKT RAILROAD, 1.1 MILES NORTH OF SH-10 24115(06) FFY 2013 (UT FOR 2411504) CRAIG Div. 8 US059 0.500 Mi. Let 01/2013 $140,080 RIGHT OF WAY SH-10: BIG CREEK, 17 MILES WEST OF US-59 (RW 27070(05) FFY 2013 FOR 270704) CRAIG Div. 8 SH010 0.300 Mi. Let 03/2013 $54,500 UTILITIES SH-10: BIG CREEK, 17 MILES WEST OF US-59 (UT 27070(06) FFY 2013 FOR 2707004) CRAIG Div. 8 SH010 0.300 Mi. Let 03/2013 $54,500 RIGHT OF WAY US-60: MADDEN CREEK , 0.6 MILES EAST OF NOWATA COUNTY LINE 27082(05) FFY 2013 (RW FOR 2708204) CRAIG Div. 8 US060 0.250 Mi. Let 03/2013 $54,500 UTILITIES US-60: MADDEN CREEK , 0.6 MILES EAST OF NOWATA COUNTY LINE 27082(06) FFY 2013 (UT FOR 2708204) CRAIG Div. 8 US060 0.250 Mi. Let 03/2013 $54,500 RIGHT OF WAY SH-82: LOCUST CREEK, 6.5 MILES NORTH OF MAYES COUNTY LINE 27089(05) FFY 2013 (RW FOR 2708904) CRAIG Div. 8 SH082 0.300 Mi. Let 06/2013 $54,500 Wednesday, September 28, 2011 page 13 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH-82: LOCUST CREEK, 6.5 MILES NORTH OF MAYES COUNTY LINE 27089(06) FFY 2013 (UT FOR 2708904) CRAIG Div. 8 SH082 0.300 Mi. Let 06/2013 $54,500 BRIDGE & APPROACHES SH-16: OVER SKULL CREEK APPROX. 5.7 MILES EAST OF JCT. SH-16/SH-48 21908(04) FFY 2013 CREEK Div. 8 SH016 0.040 Mi. Let 04/2013 $800,060 RIGHT OF WAY SH-51: CIMARRON RIVER, 3.5 MILES EAST OF JCT. SH-99 (RW 27071(05) FFY 2013 FOR 2707104) CREEK Div. 8 SH051 0.350 Mi. Let 06/2013 $218,000 UTILITIES SH-51: CIMARRON RIVER, 3.5 MILES EAST OF JCT. SH-99 (UT 27071(06) FFY 2013 FOR 2707104) CREEK Div. 8 SH051 0.350 Mi. Let 06/2013 $109,000 RIGHT OF WAY US75A: SL & SF R.R. UNDER, 1.9 MI. NORTH OF OKLMULGEE COUNTY LINEROW 27075(05) FFY 2013 FOR 27075(04) CREEK Div. 8 US075A 0.350 Mi. Let 06/2013 $109,000 UTILITIES US75A: SL & SF R.R. UNDER, 1.9 MI. NORTH OF OKLMULGEE COUNTY LINEUT 27075(06) FFY 2013 FOR 27075(04) CREEK Div. 8 US075A 0.350 Mi. Let 06/2013 $109,000 RIGHT OF WAY SH-54, BEGIN 1.8 NORTH OF THE I-40 JCT (NORTH WEATHERFORD CITY LMTS) 24145(05) FFY 2013 ANDEXTEND NORTH 5.0 MILES. ROW FOR 24145(04) CUSTER Div. 5 SH054 5.000 Mi. Let 11/2012 $875,684 BRIDGE WATER PROOF SEAL DIVISION 5 - BRIDGE WATER PROOF SEAL 24391(04) FFY 2013 CUSTER Div. 5 0.000 Mi. Let 03/2013 $122,448 RESURFACE I-40: FROM MILE MARKER 77 TO 84 26490(04) FFY 2013 CUSTER Div. 5 IS040 7.000 Mi. Let 02/2013 $6,370,076 INTERCHANGE I-40: IMPROVEMENT TO INTERCHANGE AT EXIT 82, ADD EB OFF RAMP, POSSIBLE 27911(04) FFY 2013 BRIDGE WIDENING. (PENDING FUNDING BY OTHERS) CUSTER Div. 5 IS040 0.300 Mi. Let 02/2013 $4,299,999 RIGHT OF WAY US-59 FROM 0.69 MI SOUTH OF SH-127 NORTH, NORTH 5.46 MILES (RW FOR 24150(05) FFY 2013 2415004) (TIED W/ 2415105) DELAWARE Div. 8 US059 5.460 Mi. Let 05/2013 $4,326,000 UTILITIES US-59 FROM 0.69 MI SOUTH OF SH-127 NORTH, NORTH 5.46 MILES (UT FOR 24150(06) FFY 2013 2415004) (TIED W/ 2415106) DELAWARE Div. 8 US059 5.460 Mi. Let 05/2013 $1,545,000 RIGHT OF WAY US-59: FROM 2.92 MILES NORTH OF SH-20, NORTH 0.79 MILES (RW FOR 24151(05) FFY 2013 2415104) ( TIED W/ 2415005) DELAWARE Div. 8 US059 0.790 Mi. Let 05/2013 $367,710 UTILITIES US-59: FROM 2.92 MILES NORTH OF SH-20, NORTH 0.79 MILES (UT FOR 24151(06) FFY 2013 2415104) (TIED W/ 2415006) DELAWARE Div. 8 US059 0.790 Mi. Let 05/2013 $381,615 RIGHT OF WAY US-412: FROM THE ARKANSAS STATE LINE WEST TO US-59(RW FOR 2650604) 26506(05) FFY 2013 DELAWARE Div. 8 US412 0.070 Mi. Let 04/2013 $103,000 UTILITIES US-412: FROM THE ARKANSAS STATE LINE WEST TO US-59(UT FOR 2650604) 26506(06) FFY 2013 DELAWARE Div. 8 US412 0.070 Mi. Let 04/2013 $103,000 BRIDGE & APPROACHES SH-74 OVER UNNAMED CREEK, 0.24 MI NORTH OF CARTER C/L 20969(04) FFY 2013 GARVIN Div. 3 SH074 0.590 Mi. Let 03/2013 $2,873,700 RIGHT OF WAY SH-74 OVER BEEF CREEK, 13.35 MI NORTH OF SH-29 (RW FOR 27062(04)) 27062(05) FFY 2013 GARVIN Div. 3 SH074 0.200 Mi. Let 08/2013 $430,025 UTILITIES SH-74 OVER BEEF CREEK, 13.35 MI NORTH OF SH-29 (UT FOR 27062(04)) 27062(06) FFY 2013 GARVIN Div. 3 SH074 0.200 Mi. Let 08/2013 $135,960 RIGHT OF WAY SH-37: FR 0.8 MIS E OF US-81 IN MINCO, EXT E 3.8 MI TO BRAUM'SROAD WEST 20301(05) FFY 2013 OF TUTTLE RW FOR 202301(04) GRADY Div. 7 SH037 3.800 Mi. Let 01/2013 $1,385,781 UTILITIES SH-37: FR 0.8 MIS E OF US-81 IN MINCO, EXT E 3.8 MI TO BRAUM'SROAD WEST 20301(06) FFY 2013 OF TUTTLE. UT FOR 20301(04) GRADY Div. 7 SH037 3.800 Mi. Let 01/2013 $468,651 RIGHT OF WAY SH-39 FROM 3.6 MI EAST OF US-62, EXTEND EAST 3.0 MIS RW FOR 20302(04) 20302(05) FFY 2013 GRADY Div. 7 SH039 3.000 Mi. Let 02/2013 $800,000 UTILITIES SH-39 FROM 3.6 MI EAST OF US-62, EXTEND EAST 3.0 MIS UT FOR 20302(04) 20302(06) FFY 2013 GRADY Div. 7 SH039 3.000 Mi. Let 02/2013 $636,000 RIGHT OF WAY US-81 FROM SH-9 SOUTH 6.3 MI TO US-277(CHICKASHA BYPASS) ROW FOR 24428(05) FFY 2013 24428(04) GRADY Div. 7 US081 6.300 Mi. Let 03/2013 $4,800,000 UTILITIES US-81 FROM SH-9 SOUTH 6.3 MI TO US-277(CHICKASHA BYPASS) UT FOR 24428(06) FFY 2013 24428(04) GRADY Div. 7 US081 6.300 Mi. Let 03/2013 $2,600,000 Wednesday, September 28, 2011 page 14 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES US 81: BRIDGE OVER KILLPECKER CREEK IN POND CREEK 13413(04) FFY 2013 GRANT Div. 4 US081 0.300 Mi. Let 02/2013 $1,910,886 BRIDGE & APPROACHES US-60: OVER POND CREEK APPROX. 1.5 MILE EAST OF THE JCT. OF 21849(04) FFY 2013 US-60/SH-74 GRANT Div. 4 US060 0.100 Mi. Let 01/2013 $3,432,000 BRIDGE & APPROACHES US-81: OVER POLE CAT & UNNAMED CREEKS APPROX. 6.0 & 6.7 MILE N. OF THE 21851(04) FFY 2013 JCT OF US-81/SH-11 GRANT Div. 4 US081 1.880 Mi. Let 02/2013 $6,663,700 RIGHT OF WAY SH-34 OVER SALT FORK, 1.2 MI SOUTH OF US-283ROW FOR 24207(04) 24207(05) FFY 2013 GREER Div. 5 SH034 0.500 Mi. Let 10/2012 $100,564 UTILITIES SH-34 OVER SALT FORK, 1.2 MI SOUTH OF US-283UT FOR 24207(04) 24207(06) FFY 2013 GREER Div. 5 SH034 0.500 Mi. Let 10/2012 $97,672 RIGHT OF WAY SH-5 OVER SANDY CR, 2.9 MI NORTH OF THE JACKSON C/LROW FOR 24208(04) 24208(05) FFY 2013 HARMON Div. 5 SH005 0.500 Mi. Let 10/2012 $100,564 UTILITIES SH-5 OVER SANDY CR, 2.9 MI NORTH OF THE JACKSON C/LUT FOR 24208(04) 24208(06) FFY 2013 HARMON Div. 5 SH005 0.500 Mi. Let 10/2012 $97,674 BRIDGE WATER PROOF SEAL DIVISION 6 BRIDGE SILANE (WATERPROOFING SEAL) 23274(10) FFY 2013 HARPER Div. 6 0.000 Mi. Let 03/2013 $54,500 BRIDGE PAINTING DIVISION 6 BRIDGE PAINTING 23277(04) FFY 2013 HARPER Div. 6 0.000 Mi. Let 03/2013 $400,001 JOINT SEAL/REPAIR DIVISION 6 BRIDGE JOINT 23277(05) FFY 2013 HARPER Div. 6 0.000 Mi. Let 03/2013 $250,000 RIGHT OF WAY SH-34 OVER BUFFALO CR, 5.9 MI SOUTH OF US-64 RW FOR 26494(04) 26494(05) FFY 2013 HARPER Div. 6 SH034 0.500 Mi. Let 03/2013 $54,500 SAFETY IMPROVEMENT DIVISION SIX SAFETY IMPROVEMENTS (SITES TO BE DETERMINED) 27005(05) FFY 2013 HARPER Div. 6 0.000 Mi. Let 05/2013 $250,000 BRIDGE & APPROACHES US-270 OVER ABANDONED RAILROAD, 3.2 MI SOUTHEAST OF SEMINOLE C/L 21789(04) FFY 2013 HUGHES Div. 3 US270 0.640 Mi. Let 11/2012 $2,541,963 RIGHT OF WAY SH-9 OVER WEWOKA CREEK, 3.2 MI EAST OF US-75 (RW FOR 27059(04)) 27059(05) FFY 2013 HUGHES Div. 3 SH009 0.200 Mi. Let 11/2012 $220,523 UTILITIES SH-9 OVER WEWOKA CREEK, 3.2 MI EAST OF US-75 (UT FOR 27059(04)) 27059(06) FFY 2013 HUGHES Div. 3 SH009 0.200 Mi. Let 11/2012 $74,366 RIGHT OF WAY SH-6 OVER SANDY CR, 5.7 MI NORTHEAST OF THE TEXAS S/LROW FOR 24209(05) FFY 2013 24209(04) JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-6 OVER SANDY CR, 5.7 MI NORTHEAST OF THE TEXAS S/LUT FOR 24209(04) 24209(06) FFY 2013 JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $97,672 RIGHT OF WAY SH-6 OVER TURKEY CR, 8.9 MI NORTHEAST OF SH-34ROW FOR 24210(04) 24210(05) FFY 2013 JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-6 OVER TURKEY CR, 8.9 MI NORTHEAST OF SH-34ROW FOR 24210(04) 24210(06) FFY 2013 JACKSON Div. 5 SH006 0.500 Mi. Let 12/2012 $97,672 BRIDGE & APPROACHES SH-48A OVER LITTLE SANDY & UNNAMED CREEKS, 2.62 & 7.19 MI NORTH & 20972(04) FFY 2013 EAST OF SH-78 JOHNSTON Div. 3 SH048A 0.650 Mi. Let 11/2012 $3,733,235 RIGHT OF WAY SH-99: FROM 5.64 MI NORTH OF SH-22, NORTH 4.19 MI (RW FOR 23268(04) & 23268(05) FFY 2013 (07)) JOHNSTON Div. 3 SH099 3.770 Mi. Let 06/2013 $490,486 UTILITIES SH-99: FROM 5.64 MI NORTH OF SH-22, NORTH 4.19 MI (UT FOR 23268(04) & 23268(06) FFY 2013 (07)) JOHNSTON Div. 3 SH099 3.770 Mi. Let 06/2013 $182,001 BRIDGE & APPROACHES US-60: OVER BOIS D'ARC CREEK APPROX. 12.9 MILE EAST OF US-60/I-35 21853(04) FFY 2013 KAY Div. 4 US060 0.050 Mi. Let 01/2013 $7,758,840 BRIDGE & APPROACHES SH-33: OVER CAMPBELL CREEK APPROX. 12.0 MILE EAST OF THE JCT OF 21855(04) FFY 2013 SH-33/US-81 KINGFISHER Div. 4 SH033 0.040 Mi. Let 02/2013 $1,260,132 BRIDGE & APPROACHES SH-33: OVER UNCLE JOHN'S, O'FLOW & UNNAMED CREEKS 0.5 TO 0.8 MILES E. 21856(04) FFY 2013 OF THE JCT OF SH-33/US-81 KINGFISHER Div. 4 SH033 0.060 Mi. Let 03/2013 $2,780,045 Wednesday, September 28, 2011 page 15 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY SH-6: BEGIN 5.0 MI. S. OF THE SH-6/SH-55E JCT. IN BECKHAM CO & EXT 15027(05) FFY 2013 NORTH5.0 MILE (R/W FOR 15027(04)) 4 LANE KIOWA Div. 5 SH006 5.040 Mi. Let 10/2012 $536,615 GRADE,DRAINING,BRIDGE & SURFACE SH-9: OVER ELK CREEK, 12.0, 12.4, & 12.7 MIS EAST OF GREER C/L 20806(04) FFY 2013 KIOWA Div. 5 SH009 1.200 Mi. Let 05/2013 $6,083,610 BRIDGE & APPROACHES SH-54: OVER RAINY MTN AND TWO UNNAMED CREEKS, 6.0, 6.4 AND 6.8 MILES 23244(04) FFY 2013 SOUTH OF THE SH-9 JUNCTION. KIOWA Div. 5 SH054 1.100 Mi. Let 10/2012 $4,409,885 BRIDGE & APPROACHES SH-54 OVER AN UNNAMED CREEK APPROX. 1.4 MILE SOUTH OF JCT SH-54/SH-9 23400(04) FFY 2013 KIOWA Div. 5 SH054 0.500 Mi. Let 10/2012 $1,581,863 BRIDGE & APPROACHES SH-54 OVER GOTEBO CREEK APPROX. 0.9 MILE NORTH OF JCT SH-54/SH-9. 23401(04) FFY 2013 KIOWA Div. 5 SH054 0.500 Mi. Let 10/2012 $1,642,208 RIGHT OF WAY SH-2 FROM 10.7 MI NORTH OF THE PUSHMATAHA C/L NORTH 6.5 MI RW FOR 24212(05) FFY 2013 24212(04) LATIMER Div. 2 SH002 6.500 Mi. Let 08/2013 $1,594,126 UTILITIES SH-2 FROM 10.7 MI NORTH OF THE PUSHMATAHA C/L NORTH 6.5 MI UT FOR 24212(06) FFY 2013 24212(04) LATIMER Div. 2 SH002 6.500 Mi. Let 08/2013 $637,650 RIGHT OF WAY US-59: OVER SHAWNEE CR, 2.6 MI WEST & NORTH OF US-259 RW FOR 26347(05) FFY 2013 26347(04) LEFLORE Div. 2 US059 0.100 Mi. Let 07/2013 $103,000 UTILITIES US-59: OVER SHAWNEE CR, 2.6 MI WEST & NORTH OF US-259 UT FOR 26347(06) FFY 2013 26347(04) LEFLORE Div. 2 US059 0.100 Mi. Let 07/2013 $103,000 RIGHT OF WAY US-59 OVER CEDAR CREEK & OVERFLOW 5.5 & 5.6 MI WEST OF US-259 RW 27024(05) FFY 2013 FOR 27024(04) (2 BRIDGES) LEFLORE Div. 2 US059 0.100 Mi. Let 05/2013 $423,661 UTILITIES US-59 OVER CEDAR CREEK & OVERFLOW 5.5 & 5.6 MI WEST OF US-259 UT 27024(06) FFY 2013 FOR 27024(04) (2 BRIDGES) LEFLORE Div. 2 US059 0.100 Mi. Let 05/2013 $105,915 WIDEN, RESURFACE & BRIDGE SH-66 OVER DEEP FORK NORTH CANADIAN RIVER, 7.7 MI EAST OF OKLAHOMA 26787(04) FFY 2013 C/L (PENDING TRIBAL/BIA FUNDS) LINCOLN Div. 3 SH066 0.680 Mi. Let 06/2013 $3,144,796 BRIDGE & APPROACHES SH-74 OVER SKELETON CR, APPROX 13.5 MI NORTH OF SH-33 24216(04) FFY 2013 LOGAN Div. 4 SH074 0.100 Mi. Let 06/2013 $1,552,119 INTERCHANGE I-35 INTERCHANGE AT ROGERS ROAD, 3.24 MILES N. OF TEXAS STATE 28584(04) FFY 2013 LINE(TRIBAL FUNDING, CENG = ODOT) LOVE Div. 7 IS035 1.450 Mi. Let 03/2013 $9,891,817 SURFACE SH-15/US-412: FR WOODWARD C/L EXT. EAST 2.04 MILES (SURFACING FOR 10067(09) FFY 2013 10067(08) MAJOR Div. 6 US412 2.040 Mi. Let 07/2013 $2,755,437 RIGHT OF WAY US-70: MADILL BYPASS FROM SH-199 EAST 4.8 MILES RW FOR 18835(05) FFY 2013 18835(04,07,08) MARSHALL Div. 2 US070 4.800 Mi. Let 07/2013 $2,947,860 UTILITIES US-70: MADILL BYPASS FROM SH-199 EAST 4.8 MILES UT FOR 18835(06) FFY 2013 18835(04,07,08) SMC=80/20 MARSHALL Div. 2 US070 4.800 Mi. Let 07/2013 $109,180 RIGHT OF WAY US-70:FROM 4.8 MILES EAST OF SH-199, EXTEND SOUTHEAST 5.5 18838(06) FFY 2013 MILES(KINGSTON BYPASS) RW FOR 18838(04,05,08) MARSHALL Div. 2 US070 5.500 Mi. Let 06/2013 $2,120,000 UTILITIES US-70:FROM 4.8 MILES EAST OF SH-199, EXTEND SOUTHEAST 5.5 18838(07) FFY 2013 MILES(KINGSTON BYPASS) UT FOR 18838(04,05,08) MARSHALL Div. 2 US070 5.500 Mi. Let 06/2013 $243,119 BRIDGE & APPROACHES SH-28 OVER ROCK CREEK, APPROX. 4.5 MILES EAST OF JCT. OF SH-28/US-69 21909(04) FFY 2013 MAYES Div. 8 SH028 0.040 Mi. Let 04/2013 $1,744,000 UTILITIES SH-76 OVER WALNUT CREEK, FROM 0.1 MI SOUTH OF SH-74B, NORTH TO US-62 01964(08) FFY 2013 NEAR BLANCHARD (UT FOR 01964(06)) MCCLAIN Div. 3 SH076 2.100 Mi. Let 02/2013 $661,887 RIGHT OF WAY SH-76 OVER WALNUT CREEK, FROM 0.1 MI SOUTH OF SH-74B, NORTH TO US-62 01964(12) FFY 2013 NEAR BLANCHARD (RW FOR 01964(06)) MCCLAIN Div. 3 SH076 2.100 Mi. Let 02/2013 $386,456 RIGHT OF WAY I-35 UNDER LADD ROAD, 5.9 MI SOUTH OF CLEVELAND C/L (RAMP REPAIR 27220(05) FFY 2013 WORK AND BRIDGE GRADE RAISE) (RW FOR 27220(05)) MCCLAIN Div. 3 IS035 0.100 Mi. Let 07/2013 $154,500 UTILITIES I-35 UNDER LADD ROAD, 5.9 MI SOUTH OF CLEVELAND C/L (RAMP REPAIR 27220(06) FFY 2013 WORK AND BRIDGE GRADE RAISE) (UT FOR 27220(05)) MCCLAIN Div. 3 IS035 0.100 Mi. Let 07/2013 $51,500 RIGHT OF WAY US-70:FROM 2.4 MILES EAST OF CHOCTAW COUNTY LINE,EAST 4.6 MILES R/W 18859(05) FFY 2013 FOR 18859(04,08,09) MCCURTAIN Div. 2 US070 4.600 Mi. Let 06/2013 $1,816,802 Wednesday, September 28, 2011 page 16 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES US-70:FROM 2.4 MILES EAST OF CHOCTAW COUNTY LINE, EAST 4.6 MILES UT 18859(06) FFY 2013 FOR 18859(04,08,09) MCCURTAIN Div. 2 US070 4.600 Mi. Let 06/2013 $2,201,061 RIGHT OF WAY SH-3 FROM JCT US-259 EXTEND WEST 5.09 MILES RW FOR 24219(04) 24219(05) FFY 2013 MCCURTAIN Div. 2 SH003 5.090 Mi. Let 07/2013 $2,180,000 UTILITIES SH-3 FROM JCT US-259 EXTEND WEST 5.09 MI UT FOR 24219(04) 24219(06) FFY 2013 MCCURTAIN Div. 2 SH003 5.090 Mi. Let 07/2013 $981,000 RIGHT OF WAY SH-37 FROM THE TEXAS S/L, NORTH & EAST 7.54 MI RW FOR 24405(04) 24405(05) FFY 2013 MCCURTAIN Div. 2 SH037 7.540 Mi. Let 06/2013 $981,000 UTILITIES SH-37 FROM THE TEXAS S/L, NORTH & EAST 7.54 MI UT FOR 24405(04) 24405(06) FFY 2013 MCCURTAIN Div. 2 SH037 7.540 Mi. Let 06/2013 $381,500 RIGHT OF WAY SH-3 FROM 16.05 MI EAST OF THE PUSHMATAHA C/L EAST 6.0 MI RW FOR 24409(05) FFY 2013 24409(04) MCCURTAIN Div. 2 SH003 6.000 Mi. Let 07/2013 $3,270,000 UTILITIES SH-3 FROM 16.05 MI EAST OF THE PUSHMATAHA C/L EAST 6.0 MI UT FOR 24409(06) FFY 2013 24409(04) MCCURTAIN Div. 2 SH003 6.000 Mi. Let 07/2013 $1,308,000 BRIDGE & APPROACHES US-70: SOUTHBOUND OVER YASHAU CR, 9.1 MI NORTHEAST OF US-259 26234(04) FFY 2013 MCCURTAIN Div. 2 US070 0.100 Mi. Let 05/2013 $2,398,000 RIGHT OF WAY US-259: FROM 8.0 MILES NORTH OF THE TEXAS STATE LINE, NORTH 5.09 26343(05) FFY 2013 MILESRW FOR 26343(04) MCCURTAIN Div. 2 US259 5.090 Mi. Let 07/2013 $500,000 UTILITIES US-259: FROM 8.0 MILES NORTH OF THE TEXAS STATE LINE, NORTH 5.09 MILES 26343(06) FFY 2013 UT FOR 26343(04) MCCURTAIN Div. 2 US259 5.090 Mi. Let 07/2013 $100,000 BRIDGE & APPROACHES SH-9: OVER RR, .4 MI. SE OF US-69B JCT. 21730(04) FFY 2013 MCINTOSH Div. 1 SH009 0.200 Mi. Let 07/2013 $2,938,320 BRIDGE WATER PROOF SEAL DIVISION WIDE (BRIDGE WATERPROOF SEAL), FOR DIVISION (1) SILANE 23105(10) FFY 2013 MUSKOGEE Div. 1 0.100 Mi. Let 04/2013 $54,500 RIGHT OF WAY US-62: OVER CANE CR TRIB & CANE CR, 10.7 & 11.02 MI EAST & NORTH OFTHE 26287(05) FFY 2013 OKMULGEE C/L (ROW FOR 26287(04) MUSKOGEE Div. 1 US062 1.000 Mi. Let 01/2013 $116,761 UTILITIES US-62: OVER CANE CR TRIB & CANE CR, 10.7 & 11.02 MI EAST & NORTH OFTHE 26287(06) FFY 2013 OKMULGEE C/L (UT FOR 26287(04) MUSKOGEE Div. 1 US062 1.000 Mi. Let 01/2013 $12,100 RIGHT OF WAY US-62: OVER CANE CREEK, 1.5 MI EAST OF JCT. SH-16 28954(05) FFY 2013 MUSKOGEE Div. 1 US062 0.300 Mi. Let 04/2013 $300,000 UTILITIES US-62: OVER CANE CREEK, 1.5 MI EAST OF JCT. SH-16 28954(06) FFY 2013 MUSKOGEE Div. 1 US062 0.300 Mi. Let 04/2013 $45,000 GRADE, DRAIN & BRIDGE US-64 BEG APPROX 7.0 M. E. OF BOUNDARY ST. IN PERRY & EXT E. 4.5 MI. TO 20311(07) FFY 2013 US-177 JCT (BILLS CORNER) NOBLE Div. 4 US064 4.500 Mi. Let 01/2013 $5,513,921 BRIDGE & APPROACHES US-64: OVER COW CREEK APPROX. 0.7 MILE EAST OF JCT. OF US-64/US-77. 21862(04) FFY 2013 NOBLE Div. 4 US064 0.050 Mi. Let 02/2013 $1,853,828 BRIDGE & APPROACHES US-64: OVER MULE CREEK APPROX. 7.8 MILE EAST OF JCT OF US-64/US-77 21863(04) FFY 2013 WITHIN 20311(07) NOBLE Div. 4 US064 0.050 Mi. Let 01/2013 $1,503,007 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOF SEAL FOR DIVISION (4) SILANE 23306(10) FFY 2013 NOBLE Div. 4 0.100 Mi. Let 04/2013 $107,972 BRIDGE PAINTING DIVISION (4): PAINT AND JOINT PROJECTS 23317(04) FFY 2013 NOBLE Div. 4 0.100 Mi. Let 03/2013 $1,079,717 RIGHT OF WAY SH-86 OVER COW CR, 0.5 MI EAST OF US-77 IN PERRY RW FOR 26421(04) 26421(05) FFY 2013 NOBLE Div. 4 SH086 0.100 Mi. Let 10/2012 $161,957 UTILITIES SH-86 OVER COW CR, 0.5 MI EAST OF US-77 IN PERRY UT FOR 26421(04) 26421(06) FFY 2013 NOBLE Div. 4 SH086 0.100 Mi. Let 10/2012 $161,957 RIGHT OF WAY US-60: BEGIN AT WASHINGTON C/L & EXTEND EAST APPROX. 5.15 MILES(RW 24269(05) FFY 2013 FOR 24269(04) NOWATA Div. 8 US060 5.150 Mi. Let 11/2012 $873,440 UTILITIES US-60: BEGIN AT WASHINGTON C/L & EXTEND EAST APPROX. 5.15 MILES(UT 24269(06) FFY 2013 FOR 24269(04) NOWATA Div. 8 US060 5.150 Mi. Let 11/2012 $1,513,145 Wednesday, September 28, 2011 page 17 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY I-240: EB TO SB I-35 AT CROSSROADS INTERCHANGE RW FOR 09032(17) 09032(14) FFY 2013 OKLAHOMA Div. 4 IS035 0.500 Mi. Let 02/2013 $5,000,000 UTILITIES I-240: EB TO SB I-35 AT CROSSROADS INTERCHANGE UT FOR 09032(17) 09032(18) FFY 2013 OKLAHOMA Div. 4 IS035 0.500 Mi. Let 02/2013 $1,800,000 BRIDGE & APPROACHES I-40 CROSSTOWN: WP 1.5, BNSF BRIDGE AT BOULEVARD 17428(25) FFY 2013 OKLAHOMA Div. 4 IS040 0.040 Mi. Let 01/2013 $6,686,495 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 4.4, GR, DR, BR & SURFACE FROM THE OKLAHOMA CITY 17428(59) FFY 2013 CANALEAST 0.9 MI & SHIFT I-40 TRAFFIC TO NEW ALIGNMENT OKLAHOMA Div. 4 IS040 0.750 Mi. Let 11/2012 $30,000,000 GRADE,DRAINING,BRIDGE & SURFACE I-40 CROSSTOWN: WP 4.5, GR, DR, BR & SURFACE THE BOULEVARD FROMBNSF 17428(60) FFY 2013 EAST TO I-40 OKLAHOMA Div. 4 IS040 0.750 Mi. Let 04/2013 $6,116,431 GRADE,DRAINING,BRIDGE & SURFACE WP 5.1: OVRLAY & STRIPE I-40 MAINLINE FR PENN TO WESTERN, GR, DR, BR & SURFMULTI-LANE RDWY ON FORMER I-40 XTWN BR ALNMT FR CLASSEN TO E.K.GAYLORD. 17428(80) FFY 2013 OKLAHOMA Div. 4 IS040 2.170 Mi. Let 05/2013 $24,000,000 RIGHT OF WAY SH-66: 4-LANES FROM 4.0 MIS. E. OF I-35 E. APPROX. 1.29 MIS.RW FOR 24356(05) FFY 2013 24356(04) OKLAHOMA Div. 4 SH066 1.290 Mi. Let 11/2012 $500,000 UTILITIES SH-66: 4-LANES FROM 4.0 MIS. E. OF I-35 E. APPROX. 1.29 MIS.UT FOR 24356(06) FFY 2013 24356(04) OKLAHOMA Div. 4 SH066 1.290 Mi. Let 11/2012 $500,000 RIGHT OF WAY SH-66 FROM APPROX 6.50 MI EAST OF I-35, EAST APPROX 7.63 MI RW FOR 26423(05) FFY 2013 26423(04) OKLAHOMA Div. 4 SH066 7.630 Mi. Let 11/2012 $545,000 UTILITIES SH-66 FROM APPROX 6.50 MI EAST OF I-35, EAST APPROX 7.63 MI UT FOR 26423(06) FFY 2013 26423(04) OKLAHOMA Div. 4 SH066 7.630 Mi. Let 11/2012 $545,000 BRIDGE & APPROACHES US-266: OVER COAL CREEK, 3.7 MI. E OF US-62/75 JCT. 21738(04) FFY 2013 OKMULGEE Div. 1 US266 0.200 Mi. Let 04/2013 $4,650,000 RIGHT OF WAY US-75: BRIDGES FOR RDWY 7.0 MI NORTH OF I-40, NORTH 2.6 MI. 21740(06) FFY 2013 OKMULGEE Div. 1 US075 2.600 Mi. Let 04/2013 $50,000 UTILITIES US-75: BRIDGES FOR RDWY 7.0 MI NORTH OF I-40, NORTH 2.6 MI. 21740(07) FFY 2013 OKMULGEE Div. 1 US075 2.600 Mi. Let 04/2013 $30,000 RIGHT OF WAY US-62: BRIDGE OVER GRAVE CREEK TRIB, 2.4 MILES EAST OF JCTSH-52RW FOR 27098(05) FFY 2013 JP 27098(04) OKMULGEE Div. 1 US062 0.500 Mi. Let 01/2013 $148,400 UTILITIES US-62: BRIDGE OVER GRAVE CREEK TRIB, 2.4 MILES EAST OF JCTSH-52UT FOR 27098(06) FFY 2013 JP 27098(04) OKMULGEE Div. 1 US062 0.500 Mi. Let 01/2013 $95,400 RIGHT OF WAY SH-20: SYCAMORE CREEK , 7.9 MILE EAST OF SH-18ROW FOR 24752(??) 24752(06) FFY 2013 OSAGE Div. 8 SH020 0.250 Mi. Let 07/2013 $54,500 UTILITIES SH-20: SYCAMORE CREEK , 7.9 MILE EAST OF SH-18UT FOR 24752(??) 24752(07) FFY 2013 OSAGE Div. 8 SH020 0.250 Mi. Let 07/2013 $54,500 RIGHT OF WAY US-60: OVER US-59 APPROX. 7.5 MILES NORTHWEST OF THE 23157(05) FFY 2013 OTTAWA/DELAWARE C/L (RW FOR 2315704) OTTAWA Div. 8 US060 0.100 Mi. Let 04/2013 $434,248 UTILITIES US-60: OVER US-59 APPROX. 7.5 MILES NORTHWEST OF THE 23157(06) FFY 2013 OTTAWA/DELAWARE C/L (UT FOR 23157(04) OTTAWA Div. 8 US060 0.100 Mi. Let 04/2013 $391,201 RIGHT OF WAY SH-10: COUNCIL HOLLOW CREEK, 4.2 MI. NORTH OF DELAWARECO. LINE RW 27074(05) FFY 2013 FOR 27074(04) OTTAWA Div. 8 SH010 0.250 Mi. Let 07/2013 $54,500 UTILITIES SH-10: COUNCIL HOLLOW CREEK, 4.2 MI. NORTH OF DELAWARECO. LINE UT 27074(06) FFY 2013 FOR 27074(04) OTTAWA Div. 8 SH010 0.250 Mi. Let 07/2013 $54,500 BRIDGE & APPROACHES SH-18: OVER ARKANSAS RIVER, FROM EAST EDGE OF RALSTON, IN PAWNEE 20895(04) FFY 2013 CO.,NORTH APPROX. 0.84 MILES ( .50 MILES IN OSAGE CO.) PAWNEE Div. 8 SH018 0.780 Mi. Let 09/2013 $4,833,600 BRIDGE & APPROACHES SH-18: OVER SALT CREEK APPROX. 0.3 MILE SOUTH OF THE PAWNEE COUNTY 21867(04) FFY 2013 LINE. PAYNE Div. 4 SH018 0.060 Mi. Let 03/2013 $1,608,987 WIDEN, RESURFACE & BRIDGE SH-33: OVER AN UNNAMED CREEK APPROX. 3.2 MILE WEST OF JCT OF 21868(04) FFY 2013 SH-33/SH-108 & EXTENDING EAST 1.77 MILE. PAYNE Div. 4 SH033 1.770 Mi. Let 04/2013 $3,140,000 RIGHT OF WAY US-177; BEG @ THE CIMARRON TURNPIKE SPUR & EXT NORTH APPROX 4.0 MILE 26555(05) FFY 2013 INTO NOBLE CO. RW FOR 26555(04) PAYNE Div. 4 US177 4.000 Mi. Let 11/2012 $545,000 Wednesday, September 28, 2011 page 18 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES US-177; BEG @ THE CIMARRON TURNPIKE SPUR & EXT NORTH APPROX 4.0 MILE 26555(06) FFY 2013 INTO NOBLE CO. UT FOR 26555(04) PAYNE Div. 4 US177 4.000 Mi. Let 11/2012 $500,000 RIGHT OF WAY SH-31 FROM 1.13 MI EAST OF MCALESTER, EAST 2.95 MI RW FOR 24331(04) 24331(05) FFY 2013 PITTSBURG Div. 2 SH031 2.950 Mi. Let 06/2013 $436,720 UTILITIES SH-31 FROM 1.13 MI EAST OF MCALESTER, EAST 2.95 MI UT FOR 24331(04) 24331(06) FFY 2013 PITTSBURG Div. 2 SH031 2.950 Mi. Let 06/2013 $191,065 RIGHT OF WAY SH-71: OVER AN UNNAMED CR, 3.0 MI NORTH OF SH-31 RW FOR 26348(04) 26348(05) FFY 2013 PITTSBURG Div. 2 SH071 0.100 Mi. Let 08/2013 $103,000 UTILITIES SH-71: OVER AN UNNAMED CR, 3.0 MI NORTH OF SH-31 UT FOR 26348(04) 26348(06) FFY 2013 PITTSBURG Div. 2 SH071 0.100 Mi. Let 08/2013 $154,500 WIDEN & RESURFACE SH-19: FROM 4.3 MI EAST OF THE GARVIN C/L, EAST 5.61 MI THRU PICKETT 21841(07) FFY 2013 PONTOTOC Div. 3 SH019 5.640 Mi. Let 07/2013 $13,432,745 BRIDGE WATER PROOF SEAL DIVISION 3: BRIDGE WATER PROOFING SEAL (SILANE) 22973(11) FFY 2013 PONTOTOC Div. 3 0.000 Mi. Let 04/2013 $100,000 BRIDGE PAINTING DIVISION 3: BRIDGE PAINT PROJECTS 23284(04) FFY 2013 PONTOTOC Div. 3 0.100 Mi. Let 04/2013 $700,000 JOINT SEAL/REPAIR DIVISION 3: BRIDGE JOINT SEAL/REPAIR PROJECTS 23285(04) FFY 2013 PONTOTOC Div. 3 0.100 Mi. Let 04/2013 $300,000 RIGHT OF WAY SH-99 OVER WALNUT & 2 UNNAMED CR, FROM 0.5 MI NORTH OF SH-99A, 23286(05) FFY 2013 NORTH 3.0 MI (RW FOR 23286(04)) PONTOTOC Div. 3 SH099 3.000 Mi. Let 05/2013 $495,842 UTILITIES SH-99 OVER WALNUT & 2 UNNAMED CR, FROM 0.5 MI NORTH OF SH-99A, 23286(06) FFY 2013 NORTH 3.0 MI (UT FOR 23286(04)) PONTOTOC Div. 3 SH099 3.000 Mi. Let 05/2013 $758,183 RIGHT OF WAY SH-19 OVER BIG SANDY CREEK, 1.0 MI EAST OF JUNCTION SH-3W (RW FOR 27988(05) FFY 2013 27988(04)) PONTOTOC Div. 3 SH019 0.020 Mi. Let 08/2013 $309,000 UTILITIES SH-19 OVER BIG SANDY CREEK, 1.0 MI EAST OF JUNCTION SH-3W (UT FOR 27988(06) FFY 2013 27988(04)) PONTOTOC Div. 3 SH019 0.020 Mi. Let 08/2013 $103,000 RIGHT OF WAY SH-102: FROM SH-9, NORTH 3.06 MI (RW FOR 21788(07)) 21788(08) FFY 2013 POTTAWATOMIE Div. 3 SH102 3.000 Mi. Let 03/2013 $490,486 UTILITIES SH-102: FROM SH-9, NORTH 3.06 MI (UT FOR 21788(07)) 21788(09) FFY 2013 POTTAWATOMIE Div. 3 SH102 3.000 Mi. Let 03/2013 $327,025 INTERCHANGE I-40: INGRESS/EGRESS IMPROVEMENT AT MILE MARK 187 (NOT FULLY FUNDED - 27133(04) FFY 2013 PENDING FUNDING BY OTHERS) POTTAWATOMIE Div. 3 IS040 1.160 Mi. Let 08/2013 $3,460,800 BRIDGE WATER PROOF SEAL DIVISION WIDE, DIVISION 2 - BRIDGE WATERPROOF SEAL 23144(10) FFY 2013 PUSHMATAHA Div. 2 0.100 Mi. Let 04/2013 $54,500 JOINT SEAL/REPAIR DIVISION 2: BRIDGE MAINTENANCE - VARIOUS LOCATIONS (JOINT REPAIR) 23145(06) FFY 2013 PUSHMATAHA Div. 2 0.100 Mi. Let 01/2013 $206,000 BRIDGE PAINTING DIVISION 2: MAINTENANCE - VARIOUS LOCATIONS BRIDGE PAINTING 23145(08) FFY 2013 PUSHMATAHA Div. 2 0.100 Mi. Let 01/2013 $824,000 BRIDGE & APPROACHES US-271: OVER HURD CR, 2.4 MI SOUTH OF CLAYTON 26232(04) FFY 2013 PUSHMATAHA Div. 2 US271 0.100 Mi. Let 05/2013 $1,220,800 BRIDGE & APPROACHES SH-47 OVER RUSH CREEK APPROX. 0.5 MILE SOUTH OF JCT SH-47/SH-30. 24358(04) FFY 2013 ROGER MILLS Div. 5 SH047 0.500 Mi. Let 04/2013 $1,259,789 RIGHT OF WAY SH-33 OVER TURKEY CREEK APPROX 1.2 MILE EAST OF JCT SH-33/SH-30.(RW 24359(05) FFY 2013 FOR 24359(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-33 OVER TURKEY CREEK APPROX 1.2 MILE EAST OF JCT SH-33/SH-30.(UT 24359(06) FFY 2013 FOR 24359(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $87,207 RIGHT OF WAY SH-33 OVER LITTLE TURKEY CREEK APPROX. 2.6 MILE EAST OF JCT 24360(05) FFY 2013 SH-33/SH-30.(RW FOR 24360(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $100,564 UTILITIES SH-33 OVER LITTLE TURKEY CREEK APPROX. 2.6 MILE EAST OF JCT 24360(06) FFY 2013 SH-33/SH-30.(UT FOR 24360(04)) ROGER MILLS Div. 5 SH033 0.500 Mi. Let 12/2012 $87,207 Wednesday, September 28, 2011 page 19 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES I-44: EASTBOUND & WESTBOUND BRIDGES AT 177TH EAST AVE. (LYNN LANE) 21898(04) FFY 2013 (IM EARMARK) ROGERS Div. 8 IS044 0.100 Mi. Let 03/2013 $9,810,000 BRIDGE & APPROACHES SH-66: OVER PRYOR CREEK, APPROX. 0.9 MILES NORTHEAST OF JCT. 21920(04) FFY 2013 SH-66/SH-28 ROGERS Div. 8 SH066 0.100 Mi. Let 07/2013 $3,400,000 GRADE, DRAIN & SURFACE SH-66 UNDER SH-266, ADD TURN LANE 23160(04) FFY 2013 ROGERS Div. 8 SH066 0.020 Mi. Let 04/2013 $400,001 RIGHT OF WAY SH-66: FR. END OF 4 LANE, .50 MI. S. OF CRAIG CO. LINE, EXTENDING NORTHEASTAPPROX. 1.25 MI. (0.75 MI. IN CRAIG CO. ), INCLUDING BOX REPLACEMENT 24121(05) FFY 2013 ROGERS Div. 8 SH066 1.250 Mi. Let 01/2013 $473,404 UTILITIES SH 66: FROM END OF 4 LANE, .50 MI. S. OF CRAIG CO., EXTENDING NORTHEASTAPPROX. 1.25 MI. (.75 MI. IN CRAIG CO.), INCLUDING BOX REPLACEMENT 24121(06) FFY 2013 ROGERS Div. 8 SH066 1.250 Mi. Let 01/2013 $276,444 RIGHT OF WAY SH-266: VERDIGRIS RIVER OVERFLOW, 5.9 MILE EAST OF TULSA C/LROW FOR 24957(05) FFY 2013 24957(04) ROGERS Div. 8 SH266 0.490 Mi. Let 03/2013 $218,000 UTILITIES SH-266: VERDIGRIS RIVER OVERFLOW, 5.9 MILE EAST OF TULSA C/LUT FOR 24957(06) FFY 2013 24957(04) ROGERS Div. 8 SH266 0.490 Mi. Let 03/2013 $109,000 MONEY ONLY PARTNERSHIP WITH CLAREMORE: RR GRADE SEPARATION, COUNTRY CLUB TO BLUE STARR (MONEY AVAIL. WHEN PRECONST. ACTIVITIES ARE COMPLETED BY OTHERS) 26242(04) FFY 2013 ROGERS Div. 8 0.000 Mi. Let 09/2013 $30,000,000 RIGHT OF WAY US-270 OVER WEWOKA CREEK & RAILROAD, FROM 4.89 MI EAST OF SH-270A 21006(08) FFY 2013 IN SEMINOLE, EAST 1.2 MI (RW FOR 21006(07)) SEMINOLE Div. 3 US270 1.200 Mi. Let 07/2013 $404,790 UTILITIES US-270 OVER WEWOKA CREEK & RAILROAD, FROM 4.89 MI EAST OF SH-270A 21006(09) FFY 2013 IN SEMINOLE, EAST 1.2 MI (UT FOR 21006(07)) SEMINOLE Div. 3 US270 1.200 Mi. Let 07/2013 $333,205 BRIDGE & APPROACHES US-64: OVER BIG SALLISAW CREEK, 3.1 MILES WEST OF US-59 IN SALLISAW. 09242(06) FFY 2013 W/I RDY PC 08 SEQUOYAH Div. 1 US064 0.070 Mi. Let 06/2013 $4,790,500 BRIDGE REPAIR DIVISION SEVEN BRIDGE PREVENTIVE MAINTENANCE (SITES TO BE DEFINED AT 20328(06) FFY 2013 ALATER DATE) STEPHENS Div. 7 0.000 Mi. Let 06/2013 $920,000 BRIDGE WATER PROOF SEAL DIVISION WIDE BRIDGE WATERPROOFING SEAL FOR DIVISION 7 (FFY 2013) 23125(10) FFY 2013 STEPHENS Div. 7 0.000 Mi. Let 04/2013 $80,000 RIGHT OF WAY SH-29 FROM 2.68 EAST OF US-81, EAST 8.8 MI (RECONSTRUCT ON EXISTING) 24412(05) FFY 2013 (PHASE I & II) ROW FOR 24412(04) STEPHENS Div. 7 SH029 8.800 Mi. Let 12/2012 $667,080 UTILITIES SH-29 FROM 2.68 EAST OF US-81, EAST 8.8 MI (RECONSTRUCT ON EXISTING)UT 24412(06) FFY 2013 FOR PHASE I & II. STEPHENS Div. 7 SH029 8.800 Mi. Let 12/2012 $1,000,000 RIGHT OF WAY SH-53 OVER NEGRO CREEK ON WEST SIDE OF LOCO, 5.84 MIS W. OF JCT 27045(05) FFY 2013 SH-89RW FOR J.P. 27045(04) STEPHENS Div. 7 SH053 0.150 Mi. Let 02/2013 $200,000 UTILITIES SH-53 OVER NEGRO CREEK ON WEST SIDE OF LOCO, 5.84 MIS W. OF JCT 27045(06) FFY 2013 SH-89UT FOR J.P. 27045(04) STEPHENS Div. 7 SH053 0.150 Mi. Let 02/2013 $200,000 RIGHT OF WAY US-54 BEG APPROX 8.5 MILE NORTH OF US-64 & EXT NORTH 2.0 MILE THRU 20839(09) FFY 2013 TYRONE RW FOR 20839(08) TEXAS Div. 6 US054 2.000 Mi. Let 02/2013 $209,000 RIGHT OF WAY CLEARANCE SH-136: BEGINNING AT THE TEXAS STATE LINE & EXTENDING NORTH 5.0 MILE 24241(11) FFY 2013 RW CLEARANCE FOR 24241(04) TEXAS Div. 6 SH136 5.000 Mi. Let 05/2013 $50,000 INTERCHANGE SH-266 OVER US-169 APPROX. 5.8 MILE NORTH OF JCT US-169/I-44. 23167(04) FFY 2013 TULSA Div. 8 SH266 0.040 Mi. Let 08/2013 $7,810,320 SAFETY IMPROVEMENT SAFETY IMPROVEMENT PROJECTS WITHIN DIVISION 8(SITES TO BE SELECTED 23170(05) FFY 2013 LATER) TULSA Div. 8 0.000 Mi. Let 08/2013 $1,000,000 BRIDGE WATER PROOF SEAL 2013 DIVISION 8 SILANE PROJECTS (BRIDGES TO BE DETERMINED LATER) 23185(10) FFY 2013 TULSA Div. 8 0.000 Mi. Let 02/2013 $109,000 BRIDGE & APPROACHES I-244 OVER ARKANSAS RIVER (EASTBOUND) (IM EARMARK) 26604(08) FFY 2013 TULSA Div. 8 IS244 0.560 Mi. Let 03/2013 $45,000,000 RIGHT OF WAY SH-266: FROM APPROX. 0.3 MI. EAST OF US169, EXT. EAST APPROX. 2.25 27053(05) FFY 2013 MILES(.45 MI. IN ROGERS CO.) ROW FOR 27053(04) TULSA Div. 8 SH266 2.250 Mi. Let 04/2013 $218,175 UTILITIES SH-266: FROM APPROX. 0.3 MI. EAST OF US169, EXT. EAST APPROX. 2.25 27053(06) FFY 2013 MILES(.45 MI. IN ROGERS CO.) UT FOR 27053(04) TULSA Div. 8 SH266 2.250 Mi. Let 04/2013 $218,175 Wednesday, September 28, 2011 page 20 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt GRADE,DRAINING,BRIDGE & SURFACE SH-51: FR TAYLOR'S FERRY AREA 7.8 MI E OF JCT SH-51/US-69, EAST 1.77 MI INCL BRIDGE OVER GRAND RIVER (FT GIBSON LAKE) AT WAGONER/CHEROKEE C/L 10006(12) FFY 2013 WAGONER Div. 1 SH051 1.770 Mi. Let 01/2013 $12,000,000 RIGHT OF WAY SH-55 OVER DRY ELK CREEK APPROX. 0.5 MILE WEST OF SH-44.(RW FOR 24367(05) FFY 2013 24367(04)) WASHITA Div. 5 SH055 0.500 Mi. Let 10/2012 $100,564 UTILITIES SH-55 OVER DRY ELK CREEK APPROX. 0.5 MILE WEST OF SH-44.(UT FOR 24367(06) FFY 2013 24367(04)) WASHITA Div. 5 SH055 0.500 Mi. Let 10/2012 $87,207 BRIDGE & APPROACHES US-281 OVER CIMARRON RIVER APPROX. 0.8 MILE NORTH OF WOODS/MAJOR 23278(04) FFY 2013 C/L. WOODS Div. 6 US281 1.000 Mi. Let 05/2013 $5,155,700 BRIDGE & APPROACHES US-281 OVER UNNAMED CREEK APPROX. 1.4 MILE WEST OF JCT US-281/SH-45 24319(04) FFY 2013 WOODS Div. 6 US281 0.500 Mi. Let 01/2013 $2,282,290 BRIDGE & APPROACHES US-64: OVER RED HORSE CREEK, 5.3 MILES EAST OF SH-50 JCT. 27010(04) FFY 2013 WOODS Div. 6 US064 1.500 Mi. Let 08/2013 $6,253,397 RIGHT OF WAY US-183/SH 3: FROM 5 MI. S.E. OF JCT. SH-50, EXT. S.E. 5 MI. R/W FOR 17457(16) 17457(18) FFY 2013 (PARALLEL LANES) WOODWARD Div. 6 US183 5.000 Mi. Let 08/2013 $600,000 RIGHT OF WAY SH 3: FROM 10 MI. S.E. OF JCT. SH-50, EXT. S.E. 4 MI. RW FOR JP 17457(20) 17457(23) FFY 2013 (PARALLEL LANES) WOODWARD Div. 6 US183 4.000 Mi. Let 07/2013 $491,470 UTILITIES SH-15 BEG APPROX. 3.1 MI EAST OF THE ELLIS C/L & EXT EAST APPROX. 2.95 24159(06) FFY 2013 MI. UT FOR 24159(07) WOODWARD Div. 6 SH015 2.950 Mi. Let 11/2012 $950,000 Wednesday, September 28, 2011 page 21 FFY 2014 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt Federal Fiscal Year 2014 UTILITIES US-64: OVER WAGON CREEK, 0.9 MILES WEST OF GRANT CO. LN. UT FOR 27006(06) FFY 2014 27006(04) ALFALFA Div. 6 US064 1.000 Mi. Let 11/2013 $160,000 UTILITIES SH-23 FROM 1.0 MI SOUTH OF THE TEXAS ST. LN., EXTEND NORTH APPROX 3.0 24067(06) FFY 2014 MI (1.0 MILE IN TEXAS) UT FOR 24067(04) BEAVER Div. 6 SH023 2.000 Mi. Let 11/2013 $364,644 RIGHT OF WAY US-270: OVER AURORA CREEK, 5.1 MILES SOUTH OF THE US-64 JCT. RW FOR 27007(05) FFY 2014 27007(04) BEAVER Div. 6 US270 1.000 Mi. Let 02/2014 $80,001 UTILITIES US-270: OVER AURORA CREEK, 5.1 MILES SOUTH OF THE US-64 JCT. UT FOR 27007(06) FFY 2014 27007(04) BEAVER Div. 6 US270 1.000 Mi. Let 02/2014 $60,000 GRADE, DRAIN & SURFACE SH-30: OVER NORTH FORK OF RED RIVER, 5.0 MI NORTH OF I-40(BRIDGE 23243(07) FFY 2014 TIE-INS) BECKHAM Div. 5 SH030 1.000 Mi. Let 04/2014 $2,264,078 GRADE, DRAIN & SURFACE US-70 FR JUST EAST OF SH-78,EXTEND EAST 4.3 MILES(DURANT BYPASS) 18847(08) FFY 2014 BR=18847(09) BRYAN Div. 2 US070 3.980 Mi. Let 05/2014 $10,070,000 BRIDGE & APPROACHES US-70 FR JUST EAST OF SH-78,EXTEND EAST 4.3 MILES(DURANT BYPASS) 18847(09) FFY 2014 GD&S=18847(08) BRYAN Div. 2 US070 3.980 Mi. Let 05/2014 $8,056,000 BRIDGE & APPROACHES SH-48 OVER THE BLUE RV & O'FLOW, 1.6 MI NORTH OF SH-78 26236(04) FFY 2014 BRYAN Div. 2 SH048 0.050 Mi. Let 04/2014 $4,360,000 RIGHT OF WAY SH-78 OVER CHUCKWA CREEK, .9 MILE NORTH OF JCT US-70 IN DURANTRW 27912(05) FFY 2014 FOR 27912(04) BRYAN Div. 2 SH078 0.010 Mi. Let 06/2014 $212,000 UTILITIES SH-78 OVER CHUCKWA CREEK, .9 MILE NORTH OF JCT US-70 IN DURANTUT FOR 27912(06) FFY 2014 27912(04) BRYAN Div. 2 SH078 0.010 Mi. Let 06/2014 $106,000 GRADE, DRAIN & SURFACE US-62: FROM SH-19 JCT. N, APPR0X 7.0 MI (BRIDGE EXCEPTION AT BOX ELDER 12571(04) FFY 2014 CR.BEGIN 1.6 MIS N OF SH-19 EXTEND 0.283 MIS) CADDO Div. 7 US062 7.260 Mi. Let 01/2014 $9,769,643 RIGHT OF WAY US-277: BEG 2.57 MIS W. OF GRADY C/L AT THE N. CURVE IN THE E. EDGE OF 20953(05) FFY 2014 CEMENT, EXT E. APPROX 4.0 MIS TO MIDDLE BILLS CR BR. (RW FOR (04)) CADDO Div. 7 US277 2.470 Mi. Let 11/2013 $550,000 UTILITIES US-277: BEG 2.57 MIS W. OF GRADY C/L AT THE N. CURVE IN THE E. EDGE OF 20953(06) FFY 2014 CEMENT, EXT E. APPROX 4.0 MIS TO MIDDLE BILLS CR BR. (UT FOR (04)) CADDO Div. 7 US277 2.470 Mi. Let 11/2013 $950,000 GRADE, DRAIN & BRIDGE SH-9 RECONSTRUCT ON EXISTING ALIGN. FROM 6.04 MI WEST OF US-62 EAST 24094(04) FFY 2014 TO US-62 CADDO Div. 7 SH009 6.400 Mi. Let 03/2014 $6,888,278 RIGHT OF WAY SH-8 BEGIN AT JCT SH-19/US-277 EXTEND NORTH AND WEST APPROX 5.0 27072(05) FFY 2014 MISRW FOR 27072(04) CADDO Div. 7 SH008 5.000 Mi. Let 12/2013 $950,000 UTILITIES SH-8 BEGIN AT JCT SH-19/US-277 EXTEND NORTH AND WEST APPROX 5.0 27072(06) FFY 2014 MISUT FOR J.P. 27072(04) CADDO Div. 7 SH008 5.000 Mi. Let 12/2013 $1,200,000 GRADE, DRAIN & SURFACE SH 4: FR SH-66 IN YUKON NORTH TO WILSHIRE, 5 LANE FR SH-66 NORTH 0.75 MI 04757(04) FFY 2014 THEN 2 LNE SECTION CANADIAN Div. 4 SH004 3.000 Mi. Let 01/2014 $4,517,864 BRIDGE & APPROACHES SH-4 OVER THE N. CANADIAN RV, & 2 O'FLOWS 1.92, 2.13 & 2.26 MI NORTH OF 04757(05) FFY 2014 SH-66 (WITHIN 04757(04) CANADIAN Div. 4 SH004 0.340 Mi. Let 01/2014 $2,804,369 GRADE, DRAIN & SURFACE SH 4 BEG 3.0 MIS. N. OF SH 66 IN YUKON AT WILSHIRE & EXT. N. TO SH 3-NW 04758(04) FFY 2014 HWY CANADIAN Div. 4 SH004 3.650 Mi. Let 06/2014 $6,365,600 RECONSTRUCT-ADDED LANES I-40: FROM FROM MILE MARKER 136 TO MILE MARKER 139.83 24424(07) FFY 2014 CANADIAN Div. 4 IS040 4.000 Mi. Let 02/2014 $48,905,772 RIGHT OF WAY I-40B: OVER THE UPAC RAILROAD ON THE SOUTH EDGE OF EL RENO RW FOR 27004(05) FFY 2014 27004(04) CANADIAN Div. 4 IS040B 0.200 Mi. Let 10/2013 $163,500 UTILITIES I-40B: OVER THE UPAC RAILROAD ON THE SOUTH EDGE OF EL RENO UT FOR 27004(06) FFY 2014 27004(04) CANADIAN Div. 4 IS040B 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 270: OVER AN UNNAMED CREEK 10.5 MILES E. OF THE BLAINE C/L RW FOR 27105(05) FFY 2014 27105(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 270: OVER AN UNNAMED CREEK 10.5 MILES E. OF THE BLAINE C/L UT FOR 27105(06) FFY 2014 27105(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 Wednesday, September 28, 2011 page 22 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY US 270: OVER UNNAMED CREEK 6.2 MILES E. OF THE BLAINE C/L RW FOR 27106(05) FFY 2014 27106(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 270: OVER UNNAMED CREEK 6.2 MILES E. OF THE BLAINE C/L UT FOR 27106(06) FFY 2014 27106(04) CANADIAN Div. 4 US270 0.200 Mi. Let 10/2013 $163,500 BRIDGE & APPROACHES SH 4: (MUSTANG ROAD) NORTHBOUND & SOUTHBOUND BRIDGES OVER I-40 27957(04) FFY 2014 CANADIAN Div. 4 SH004 0.200 Mi. Let 02/2014 $7,420,000 UTILITIES SH-53 FROM 6.87 MI EAST OF SH-76, E. APPROX 6.13 MI UT FOR 24104(04) AND 24104(06) FFY 2014 24105(05) CARTER Div. 7 SH053 6.130 Mi. Let 11/2013 $1,722,700 BRIDGE & APPROACHES SH-51: OVER FOURTEEN MILE CREEK, 5.0 MILES EAST OF WAGONER CO. LINE. 23138(04) FFY 2014 CHEROKEE Div. 1 SH051 0.060 Mi. Let 04/2014 $3,550,000 BRIDGE & APPROACHES SH-82: OVER FOURTEEN MILE AND THOMPSON BRANCH CREEK, 9.7 AND 9.9 23139(04) FFY 2014 MILESNORTH US-62 CHEROKEE Div. 1 SH082 1.760 Mi. Let 11/2013 $6,617,422 RIGHT OF WAY SH-51: BRIDGE OVER PECAN CREEK, 14.1 MILES EAST OF THE WAGONER CO 27038(05) FFY 2014 LINERW FOR JP 27038(04) CHEROKEE Div. 1 SH051 0.500 Mi. Let 02/2014 $400,001 UTILITIES SH-51: BRIDGE OVER PECAN CREEK, 14.1 MILES EAST OF THE WAGONER CO 27038(06) FFY 2014 LINEUT FOR JP 27038(04) CHEROKEE Div. 1 SH051 0.500 Mi. Let 02/2014 $209,700 GRADE, DRAIN & BRIDGE I-35: 6 LANE FROM RIVER, NORTH 0.34 MI IN NORMAN (SH-9 INTERCHANGE) 09031(05) FFY 2014 CLEVELAND Div. 3 IS035 0.340 Mi. Let 09/2014 $26,051,000 RIGHT OF WAY US-75 OVER ROCK CREEK, 7.09 MI NORTH OF SH-3 (RW FOR 27998(04)) 27998(05) FFY 2014 COAL Div. 3 US075 0.020 Mi. Let 02/2014 $62,222 UTILITIES US-75 OVER ROCK CREEK, 7.09 MI NORTH OF SH-3 (UT FOR 27998(04)) 27998(06) FFY 2014 COAL Div. 3 US075 0.020 Mi. Let 02/2014 $133,242 INTERCHANGE I-44/ FORT SILL KEY GATE INTERCHANGE (IM EARMARK)(OK103 & OK127) 18922(04) FFY 2014 COMANCHE Div. 7 IS044 0.300 Mi. Let 03/2014 $124,832 INTERCHANGE US-62 AT I-44 INTERCHANGE IN LAWTON 27050(04) FFY 2014 COMANCHE Div. 7 US062 1.120 Mi. Let 02/2014 $4,677,780 RIGHT OF WAY I-44: 1.0 MI NORTH OF THE TEXAS STATE LINE(INTERCHANGE IMPROVE) RW FOR 26500(05) FFY 2014 26500(04) COTTON Div. 7 IS044 0.300 Mi. Let 11/2013 $150,000 UTILITIES I-44: 1.0 MI NORTH OF THE TEXAS STATE LINE(INTERCHANGE IMPROVE) UT FOR 26500(06) FFY 2014 26500(04) COTTON Div. 7 IS044 0.300 Mi. Let 11/2013 $120,628 BRIDGE & APPROACHES US-59: OVER RUSSEL CREEK APPROX. 1.3 MILES SOUTH OF THE 23126(04) FFY 2014 OKLAHOMA/KANSAS STATE LINE CRAIG Div. 8 US059 0.150 Mi. Let 09/2014 $1,996,710 BRIDGE & APPROACHES SH-82: OVER MUSTANG CREEK, 1.6 MILES NORTH OF THE MAYES COUNTY LINE 24116(04) FFY 2014 CRAIG Div. 8 SH082 0.500 Mi. Let 04/2014 $1,591,400 BRIDGE & APPROACHES US-59: OVER AN UNNAMED CREEK, 0.9 MILES WEST OF THE OTTAWA COUNTY 24120(04) FFY 2014 LINE CRAIG Div. 8 US059 0.500 Mi. Let 06/2014 $1,591,400 BRIDGE & APPROACHES SH-66: OVER SAND CREEK, 1.8 MILES NORTH OF THE NORTH SH-48 JCT. 24122(04) FFY 2014 CREEK Div. 8 SH066 0.500 Mi. Let 07/2014 $1,591,400 BRIDGE & APPROACHES SH-66: OVER SAND CREEK (NORTH & SOUTHBOUND), 0.8 MILES NORTH OF THE 24123(04) FFY 2014 NORTH SH-48 JCT. CREEK Div. 8 SH066 0.500 Mi. Let 07/2014 $3,270,000 RIGHT OF WAY SH-16: FROM SH-48 EAST 6.0 MILES (RW FOR 2413104) 24131(05) FFY 2014 CREEK Div. 8 SH016 6.000 Mi. Let 12/2013 $925,485 UTILITIES SH-16: FROM SH-48 EAST 6.0 MILES (UT FOR 2413104) 24131(06) FFY 2014 CREEK Div. 8 SH016 6.000 Mi. Let 12/2013 $308,515 RIGHT OF WAY SH-66: FROM APPROX. 0.25 MILES EAST OF DEPEW, NORTHEAST, ON NEW 24132(05) FFY 2014 ALIGNMENT (CURVE CORRECTION) (RW FOR 2413204) CREEK Div. 8 SH066 1.000 Mi. Let 12/2013 $168,127 UTILITIES SH-66: FROM APPROX. 0.25 MILES EAST OF DEPEW, NORTHEAST, ON NEW 24132(06) FFY 2014 ALIGNMENT (CURVE CORRECTION) (UT FOR 2413204) CREEK Div. 8 SH066 1.000 Mi. Let 12/2013 $112,085 BRIDGE & APPROACHES SH-51: COTTONWOOD CREEK, 8.5 MILES EAST OF JCT. SH-99 27067(04) FFY 2014 CREEK Div. 8 SH051 0.250 Mi. Let 05/2014 $3,048,512 Wednesday, September 28, 2011 page 23 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES SH-33 OVER DEER CR, 8.3 MI NORTHEAST OF THE NORTH US-183 JCT 24133(04) FFY 2014 CUSTER Div. 5 SH033 0.500 Mi. Let 10/2013 $2,203,418 BRIDGE WATER PROOF SEAL DIVISION 5 SILANE TREATMENT(WATERPROOF SEAL, SITES TO DETERMINED) 24134(04) FFY 2014 CUSTER Div. 5 0.000 Mi. Let 04/2014 $122,448 RIGHT OF WAY SH-54 FROM 5.0 MI NORTH OF THE NORTH WEATHERFORD C/L, NORTH 5.0 24145(08) FFY 2014 MIROW FOR 24145(07) CUSTER Div. 5 SH054 5.000 Mi. Let 12/2013 $1,029,812 RESURFACE I-40: FROM MILE MARKER 69 TO 77. (FROM I-40B EAST JCT IN CLINTON ANDEXT 24427(05) FFY 2014 EAST 8.0 MILES) CUSTER Div. 5 IS040 8.000 Mi. Let 02/2014 $7,534,321 BRIDGE & APPROACHES SH-85: OVER DUCK CR, 3.2 MILES EAST & NORTH OF THE CRAIG C/L 24147(04) FFY 2014 DELAWARE Div. 8 SH085 0.500 Mi. Let 08/2014 $926,500 RIGHT OF WAY US-183: FROM 16.13 MILES N OF THE CUSTER C/L AND EXTEND NORTH 1.41 06377(25) FFY 2014 MILES.(STARTING AT THE NORTH CITY LIMITS OF TALOGA.) R/W FOR (14)&(20) DEWEY Div. 5 US183 1.410 Mi. Let 12/2013 $25,000 UTILITIES US-183: FROM 16.13 MILES N OF THE CUSTER C/L AND EXTEND NORTH 1.41 06377(26) FFY 2014 MILES.(STARTING AT THE NORTH CITY LIMITS OF TALOGA.) UT FOR (14)&(20) DEWEY Div. 5 US183 1.410 Mi. Let 12/2013 $20,000 BRIDGE & APPROACHES SH-132 OVER TURKEY CR, APPROX. 13.3 MI NORTH OF THE KINGFISHER C/L 24161(04) FFY 2014 GARFIELD Div. 4 SH132 0.100 Mi. Let 11/2013 $1,597,327 BRIDGE & APPROACHES SH-45 OVER AN UNNAMED CR, APPROX. 2.3 MI EAST OF THE ALFALFA C/L 24162(04) FFY 2014 GARFIELD Div. 4 SH045 0.100 Mi. Let 02/2014 $1,597,327 SHOULDER REHAB. US 60: FROM GARLAND RD. E. 1.5 MILES TO HOOVER ST. IN ENID 26375(04) FFY 2014 GARFIELD Div. 4 US060 1.500 Mi. Let 01/2014 $457,735 RESURFACE I-35: FROM SH-19, NORTH 3.21 MI 20970(08) FFY 2014 GARVIN Div. 3 IS035 3.210 Mi. Let 01/2014 $7,632,000 GRADE,DRAINING,BRIDGE & SURFACE SH-19 OVER WASHITA RIVER, FROM 0.74 MI EAST OF US-77, EAST 1.46 MI 21786(04) FFY 2014 GARVIN Div. 3 SH019 1.460 Mi. Let 11/2013 $7,797,996 RIGHT OF WAY SH-19: FROM 1.0 MI EAST OF US-177 IN STRATFORD, EAST 4.6 MI (RW FOR 21841(05) FFY 2014 21841(04)) GARVIN Div. 3 SH019 4.600 Mi. Let 03/2014 $1,295,638 UTILITIES SH-19: FROM 1.0 MI EAST OF US-177 IN STRATFORD, EAST 4.6 MI (UT FOR 21841(06) FFY 2014 21841(04)) GARVIN Div. 3 SH019 4.600 Mi. Let 03/2014 $837,082 BRIDGE & APPROACHES SH-74 OVER UNNAMED CREEK, 6.6 MI NORTH OF CARTER C/L 23263(04) FFY 2014 GARVIN Div. 3 SH074 0.200 Mi. Let 04/2014 $470,004 RIGHT OF WAY US-77 OVER OWL CREEK, 0.6 MI SOUTH OF PAOLI (RW FOR 27061(04)) 27061(05) FFY 2014 GARVIN Div. 3 US077 0.200 Mi. Let 11/2013 $39,220 UTILITIES US-77 OVER OWL CREEK, 0.6 MI SOUTH OF PAOLI (UT FOR 27061(04)) 27061(06) FFY 2014 GARVIN Div. 3 US077 0.200 Mi. Let 11/2013 $11,766 RIGHT OF WAY SH-19 OVER LITTLE PEAVINE CREEK, 6.7 MI EAST OF US-77 (RW FOR 27064(04)) 27064(05) FFY 2014 GARVIN Div. 3 SH019 0.200 Mi. Let 11/2013 $14,840 UTILITIES SH-19 OVER LITTLE PEAVINE CREEK, 6.7 MI EAST OF US-77 (UT FOR 27064(04)) 27064(06) FFY 2014 GARVIN Div. 3 SH019 0.200 Mi. Let 11/2013 $91,160 RIGHT OF WAY SH-76 OVER WASHITA RIVER, 9.4 MI NORTH OF STEPHENS C/L (RW FOR 27997(05) FFY 2014 27997(04)) GARVIN Div. 3 SH076 0.020 Mi. Let 01/2014 $43,460 UTILITIES SH-76 OVER WASHITA RIVER, 9.4 MI NORTH OF STEPHENS C/L (UT FOR 27997(06) FFY 2014 27997(04)) GARVIN Div. 3 SH076 0.020 Mi. Let 01/2014 $236,380 RIGHT OF WAY US-77 OVER WASHITA RIVER, 2.95 MI NORTH OF MURRAY C/L (RW FOR 27999(05) FFY 2014 27999(04)) GARVIN Div. 3 US077 0.020 Mi. Let 02/2014 $324,360 UTILITIES US-77 OVER WASHITA RIVER, 2.95 MI NORTH OF MURRAY C/L (UT FOR 27999(06) FFY 2014 27999(04)) GARVIN Div. 3 US077 0.020 Mi. Let 02/2014 $392,200 RIGHT OF WAY SH-74 OVER WASHITA RIVER, 1.41 MI NORTH OF SH-19 (RW FOR 28000(04)) 28000(05) FFY 2014 GARVIN Div. 3 SH074 0.020 Mi. Let 03/2014 $63,600 UTILITIES SH-74 OVER WASHITA RIVER, 1.41 MI NORTH OF SH-19 (UT FOR 28000(04)) 28000(06) FFY 2014 GARVIN Div. 3 SH074 0.020 Mi. Let 03/2014 $424,000 Wednesday, September 28, 2011 page 24 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt RIGHT OF WAY US-277: BEG 1.45 MIS E. OF CADDO C/L AT E. SIDE OF MIDDLE BILL'S CREEK, EXT E. 2.7 MIS ON OFFSET ALIGN TO H.E. BAILEY T.P. OVERPASS BR. (RW FOR (04)) 20962(05) FFY 2014 GRADY Div. 7 US277 3.300 Mi. Let 11/2013 $800,000 BRIDGE & APPROACHES SH-11 OVER SAND CR, APPROX. 6.1 MI EAST OF THE ALFALFA C/L 24174(04) FFY 2014 GRANT Div. 4 SH011 0.100 Mi. Let 04/2014 $1,597,327 BRIDGE & APPROACHES US-64 OVER COLDWATER, SAND & 3 UNNAMED CREEKS, APPROX. 6.5 MI TO 7.5 24175(04) FFY 2014 MILES E. OF THE ALFALFA C/L GRANT Div. 4 US064 1.100 Mi. Let 02/2014 $5,995,000 BRIDGE & APPROACHES SH-11 OVER POLECAT CR, APPROX. 5.9 MI EAST OF US-81 24176(04) FFY 2014 GRANT Div. 4 SH011 0.100 Mi. Let 01/2014 $1,597,327 BRIDGE & APPROACHES US-60 OVER BOGGEY CR, APPROX 4.2 MI WEST OF THE KAY C/L 24177(04) FFY 2014 GRANT Div. 4 US060 0.100 Mi. Let 01/2014 $1,597,327 BRIDGE & APPROACHES US-64 OVER AN UNNAMED CR, APPROX 3.5 MI EAST OF THE ALFALFA C/L 24178(04) FFY 2014 GRANT Div. 4 US064 0.100 Mi. Let 01/2014 $1,597,327 BRIDGE & APPROACHES US-64 OVER AN UNNAMED CR, APPROX 5.5 MI EAST OF THE ALFALFA C/L 24179(04) FFY 2014 GRANT Div. 4 US064 0.100 Mi. Let 01/2014 $1,597,327 SHOULDER IMPROVEMENT & RESURFACE SH-11: FROM 6.43 MI EAST OF THE ALFALFA C/L EAST 6.57 MI BR = 24429(05) 24429(04) FFY 2014 GRANT Div. 4 SH011 6.570 Mi. Let 05/2014 $8,867,034 BRIDGE & APPROACHES SH-11: OVER CROOKED CR, 7.0 MI EAST OF THE ALFALFA C/L RDY = 24429(04) 24429(05) FFY 2014 GRANT Div. 4 SH011 0.100 Mi. Let 05/2014 $798,664 RIGHT OF WAY SH 74: OVER UNNAMED CREEK 1.9 MILES N. OF THE GARFIELD C/L RW FOR 27130(05) FFY 2014 27130(04) GRANT Div. 4 SH074 0.200 Mi. Let 10/2013 $163,500 UTILITIES SH 74: OVER UNNAMED CREEK 1.9 MILES N. OF THE GARFIELD C/L UT FOR 27130(06) FFY 2014 27130(04) GRANT Div. 4 SH074 0.200 Mi. Let 10/2013 $163,500 BRIDGE & APPROACHES SH-34 OVER SALT FORK OF THE RED RIVER, 1.2 MI SOUTH OF US-283 24207(04) FFY 2014 GREER Div. 5 SH034 0.500 Mi. Let 04/2014 $4,856,607 BRIDGE & APPROACHES SH-5 OVER SANDY CR, 2.9 MI NORTH OF THE JACKSON C/L 24208(04) FFY 2014 HARMON Div. 5 SH005 0.500 Mi. Let 03/2014 $2,154,712 BRIDGE & APPROACHES SH 149 AT BEAVER RIVER APPROX 2.44 MI E OF US-283 10448(04) FFY 2014 HARPER Div. 6 SH149 1.000 Mi. Let 02/2014 $2,668,980 BRIDGE WATER PROOF SEAL DIVISION 6 BRIDGE SILANE (WATERPROOFING SEAL) 23274(11) FFY 2014 HARPER Div. 6 0.000 Mi. Let 04/2014 $50,000 JOINT SEAL/REPAIR DIVISION 6 BRIDGE JOINT 23276(05) FFY 2014 HARPER Div. 6 0.000 Mi. Let 03/2014 $250,000 BRIDGE PAINTING DIVISION 6 BRIDGE PAINT 24392(04) FFY 2014 HARPER Div. 6 0.000 Mi. Let 03/2014 $750,000 UTILITIES SH-34 OVER BUFFALO CR, 5.9 MI SOUTH OF US-64 UT FOR 26494(04) 26494(06) FFY 2014 HARPER Div. 6 SH034 0.500 Mi. Let 11/2013 $50,000 SAFETY IMPROVEMENT DIVISION SIX SAFETY IMPROVEMENTS (SITES TO BE DETERMINED) 27002(06) FFY 2014 HARPER Div. 6 0.000 Mi. Let 03/2014 $250,000 BRIDGE & APPROACHES SH-2: OVER BEAVER CREEK, 1.3 MILES WEST OF JCT SH-31 27046(04) FFY 2014 HASKELL Div. 1 SH002 0.400 Mi. Let 04/2014 $3,062,900 RIGHT OF WAY SH-82: BRIDGE OVER OWL CREEK, 5.6 MILES NORTH OF JCT SH-31RW FOR JP 27102(05) FFY 2014 27102(04) HASKELL Div. 1 SH082 0.520 Mi. Let 10/2013 $92,650 UTILITIES SH-82: BRIDGE OVER OWL CREEK, 5.6 MILES NORTH OF JCT SH-31UT FOR JP 27102(06) FFY 2014 27102(04) HASKELL Div. 1 SH082 0.520 Mi. Let 10/2013 $87,200 RIGHT OF WAY SH-9 OVER UNNAMED CREEK, 10.15 MI EAST OF SEMINOLE C/L (RW FOR 28921(05) FFY 2014 28921(04)) HUGHES Div. 3 SH009 0.200 Mi. Let 08/2014 $159,000 UTILITIES SH-9 OVER UNNAMED CREEK, 10.15 MI EAST OF SEMINOLE C/L (UT FOR 28921(06) FFY 2014 28921(04)) HUGHES Div. 3 SH009 0.200 Mi. Let 08/2014 $53,000 BRIDGE & APPROACHES SH-6 OVER SANDY CR, 5.7 MI NORTHEAST OF THE TEXAS S/L 24209(04) FFY 2014 JACKSON Div. 5 SH006 0.500 Mi. Let 03/2014 $2,770,764 Wednesday, September 28, 2011 page 25 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt BRIDGE & APPROACHES SH-6 OVER TURKEY CR, 8.9 MI NORTHEAST OF SH-34 24210(04) FFY 2014 JACKSON Div. 5 SH006 0.500 Mi. Let 03/2014 $3,063,336 UTILITIES US-283: BEGIN APPROX 0.5 MILE NORTH OF THE RED RIVER BRIDGE & EXTEND 24379(06) FFY 2014 NORTH4.25 MILE. (UT FOR 24379(04) JACKSON Div. 5 US283 4.250 Mi. Let 10/2013 $1,270,409 WIDEN, RESURFACE & BRIDGE US-283: BEGIN APPROX 0.1 MILE SOUTH OF SH-5 EAST & EXTEND NORTH 6.1 24379(07) FFY 2014 MILE. JACKSON Div. 5 US283 6.100 Mi. Let 11/2013 $8,233,010 BRIDGE & APPROACHES SH-99 OVER UNNAMED CREEK, 2.25 MI NORTH OF SH-7 20971(04) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 11/2013 $976,260 BRIDGE & APPROACHES SH-99 OVER UNNAMED CREEK, 3.68 MI NORTH OF SH-7 23265(04) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 11/2013 $1,384,360 BRIDGE & APPROACHES SH-99 OVER DIAMOND SPRING BRANCH CREEK, 4.35 MI NORTH OF SH-7 23266(04) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 11/2013 $1,266,700 RIGHT OF WAY SH-22 OVER BUTCHER PEN CREEK, 4.3 MI WEST OF SH-78 (RW FOR 27058(04)) 27058(05) FFY 2014 JOHNSTON Div. 3 SH022 0.200 Mi. Let 11/2013 $47,700 UTILITIES SH-22 OVER BUTCHER PEN CREEK, 4.3 MI WEST OF SH-78 (UT FOR 27058(04)) 27058(06) FFY 2014 JOHNSTON Div. 3 SH022 0.200 Mi. Let 11/2013 $68,158 RIGHT OF WAY SH-99 OVER WASHITA RIVER, 1.2 MI SOUTH OF SH-22 (RW FOR 27142(04)) 27142(05) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 01/2014 $142,040 UTILITIES SH-99 OVER WASHITA RIVER, 1.2 MI SOUTH OF SH-22 (UT FOR 27142(04)) 27142(06) FFY 2014 JOHNSTON Div. 3 SH099 0.200 Mi. Let 01/2014 $30,740 BRIDGE & APPROACHES US-77: OVER BIRD'S NEST CREEK APPROX. 1.3 MILE NORTH OF THE NOBLE C/L 21854(04) FFY 2014 KAY Div. 4 US077 0.050 Mi. Let 04/2014 $2,632,387 SHOULDER REHAB. SH 11: FROM I-35 E. 2.0 MILES TO BLACKWELL (WESTBOUND ONLY) 26373(04) FFY 2014 KAY Div. 4 SH011 2.000 Mi. Let 01/2014 $582,605 RIGHT OF WAY I-35: UNDER HUBBARD ROAD 11.0 MILES N. OF THE NOBLE C/L RW FOR 27100(05) FFY 2014 27100(04) KAY Div. 4 IS035 0.200 Mi. Let 10/2013 $163,500 UTILITIES I-35: UNDER HUBBARD ROAD 11.0 MILES N. OF THE NOBLE C/L UT FOR 27100(06) FFY 2014 27100(04) KAY Div. 4 IS035 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 177: OVER UNNAMED CREEK 7.3 MILES N. OF SH 11 RW FOR 27119(04) 27119(05) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 177: OVER UNNAMED CREEK 7.3 MILES N. OF SH 11 UT FOR 27119(04) 27119(06) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 177: OVER UNNAMED CREEK 5.6 MILES N. OF SH 11 RW FOR 27123(04) 27123(05) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 177: OVER UNNAMED CREEK 5.6 MILES N. OF SH 11 UT FOR 27123(04) 27123(06) FFY 2014 KAY Div. 4 US177 0.200 Mi. Let 10/2013 $163,500 BRIDGE REHABILITATION SH-51: OVER SKELETON CREEK APPROX. 11.3 MILE EAST OF JCT OF 21858(04) FFY 2014 SH-51/US-81. KINGFISHER Div. 4 SH051 0.150 Mi. Let 03/2014 $1,090,000 BRIDGE & APPROACHES SH-51 OVER TURKEY CR, 1.6 WEST OF US-81 24211(05) FFY 2014 KINGFISHER Div. 4 SH051 0.100 Mi. Let 02/2014 $2,038,301 BRIDGE & APPROACHES SH 51: 2 BRIDGE BOX EXTENSIONS & 1 REPLACEMENT FROM US 81 IN 27945(07) FFY 2014 HENNESSEY E.7.53 MIS. WITHIN 27945(04) KINGFISHER Div. 4 SH051 6.520 Mi. Let 01/2014 $1,160,000 UTILITIES SH-6: BEGIN 5.0 MI S. OF THE SH-6/SH-55E JCT. IN BECKHAM CO & EXT NORTH5.0 MILE, S OF RETROP (UT FOR 15027(04)) 4 LANE ECON CORRIDOR RTE 15027(06) FFY 2014 KIOWA Div. 5 SH006 5.040 Mi. Let 10/2013 $1,858,102 RIGHT OF WAY SH-19 OVER AN UNNAMED CR, 0.3 MI EAST OF SH-115ROW FOR 26477(04) 26477(05) FFY 2014 KIOWA Div. 5 SH019 0.500 Mi. Let 10/2013 $50,000 UTILITIES SH-19 OVER AN UNNAMED CR, 0.3 MI EAST OF SH-115UT FOR 26477(04) 26477(06) FFY 2014 KIOWA Div. 5 SH019 0.500 Mi. Let 10/2013 $50,000 RIGHT OF WAY SH 1 OVER BUFFALO CREEK AND 2 OVERFLOWS2.58 MI EAST OF SH 2 (3 27138(05) FFY 2014 BRIDGES) RW FOR 2138(04) LATIMER Div. 2 SH001 0.520 Mi. Let 03/2014 $1,962,000 Wednesday, September 28, 2011 page 26 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt UTILITIES SH 1 OVER BUFFALO CREEK AND 2 OVERFLOWS (3 BRIDGES) UT FOR 27138(06) FFY 2014 27138(04) LATIMER Div. 2 SH001 0.520 Mi. Let 03/2014 $272,500 RIGHT OF WAY SH-63 OVER KIAMICHI RIVER, 2.1 MI EAST OF JCT US-259 RW FOR 27029(04) 27029(05) FFY 2014 LEFLORE Div. 2 SH063 0.200 Mi. Let 01/2014 $1,007,000 UTILITIES SH-63 OVER KIAMICHI RIVER, 2.1 MI EAST OF JCT US-259 UT FOR 27029(04) 27029(06) FFY 2014 LEFLORE Div. 2 SH063 0.200 Mi. Let 01/2014 $265,000 BRIDGE & APPROACHES SH-18 OVER WEST BEAVER CREEK, 10.8 MI NORTH OF SH-66 23280(04) FFY 2014 LINCOLN Div. 3 SH018 0.200 Mi. Let 11/2013 $2,419,980 RIGHT OF WAY SH-105 OVER HEADQUARTERS CREEK, 1.0 MI EAST OF US-177 (RW FOR 27060(05) FFY 2014 27060(04)) LINCOLN Div. 3 SH105 0.200 Mi. Let 07/2014 $54,060 UTILITIES SH-105 OVER HEADQUARTERS CREEK, 1.0 MI EAST OF US-177 (UT FOR 27060(06) FFY 2014 27060(04)) LINCOLN Div. 3 SH105 0.200 Mi. Let 07/2014 $50,562 BRIDGE & APPROACHES SH-33: OVER COTTONWOOD CREEK, NOBLE STREET RAILROAD IN GUTHRIE. 21860(04) FFY 2014 LOGAN Div. 4 SH033 0.100 Mi. Let 04/2014 $13,584,466 BRIDGE & APPROACHES US-77 OVER LAWRIE CR, APPROX 5.37 MI NORTH OF SH-33 24214(04) FFY 2014 LOGAN Div. 4 US077 0.100 Mi. Let 06/2014 $1,597,327 BRIDGE & APPROACHES SH-74 OVER CROW CR, APPROX 11.0 MI NORTH OF SH-33 24215(04) FFY 2014 LOGAN Div. 4 SH074 0.100 Mi. Let 06/2014 $1,597,327 SHOULDER REHAB. SH 33: FROM PINE ST. IN GUTHRIE E. 1.0 MILES TO THE SH 105 JCT. 26379(04) FFY 2014 LOGAN Div. 4 SH033 1.000 Mi. Let 03/2014 $401,761 RIGHT OF WAY SH 33: ADD SHOULDERS & RESURFACE FROM THE KINGFISHER C/L E. 3.51 26996(05) FFY 2014 MILES RW FOR 26996(04) LOGAN Div. 4 SH033 3.510 Mi. Let 10/2013 $545,000 UTILITIES SH 33: ADD SHOULDERS & RESURFACE FROM THE KINGFISHER C/L E. 3.51 26996(06) FFY 2014 MILES UT FOR 26996(04) LOGAN Div. 4 SH033 3.510 Mi. Let 10/2013 $545,000 RIGHT OF WAY SH 51: OVER WEST BEAVER CREEK 12.6 MILES E. OF THE KINGFISHER C/L RW 27099(05) FFY 2014 FOR 27099(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 UTILITIES SH 51: OVER WEST BEAVER CREEK 12.6 MILES E. OF THE KINGFISHER C/L UT 27099(06) FFY 2014 FOR 27099(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY US 77: OVER THE CIMARRON RIVER 2.8 MILES N. OF SH 33 RW FOR 27103(04) 27103(05) FFY 2014 LOGAN Div. 4 US077 0.200 Mi. Let 10/2013 $163,500 UTILITIES US 77: OVER THE CIMARRON RIVER 2.8 MILES N. OF SH 33 UT FOR 27103(04) 27103(06) FFY 2014 LOGAN Div. 4 US077 0.200 Mi. Let 10/2013 $163,500 RIGHT OF WAY SH 51: OVER MIDDLE BEAVER CREEK 13.7 MILES E. OF THE KINGFISHER C/L 27122(05) FFY 2014 RW FOR 27122(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 UTILITIES SH 51: OVER MIDDLE BEAVER CREEK 13.7 MILES E. OF THE KINGFISHER C/L UT 27122(06) FFY 2014 FOR 27122(04) LOGAN Div. 4 SH051 0.200 Mi. Let 10/2013 $163,500 GRADE,DRAINING,BRIDGE & SURFACE SH-32: BEG APPROX. 3.89 MILE EAST OF SH-96 & EXT EAST 4.1 MILES. (ADD 10147(05) FFY 2014 PVD SHLDRS + RESURF) LOVE Div. 7 SH032 4.100 Mi. Let 01/2014 $8,399,440 RIGHT OF WAY SH-32: OVER MUD CREEK BRIDGE AND TWO O'FLOWS BEGIN APPROX 3.45 MIS EAST OF THE JEFFERSON C/L, EXTEND EAST APPROX 1.5 MIS (ROW FOR 26502(04)) 26502(05) FFY 2014 LOVE Div. 7 SH032 1.500 Mi. Let 11/2013 $600,000 UTILITIES SH-32: OVER MUD CREEK BRIDGE AND TWO O'FLOWS BEGIN APPROX 3.45 MIS EAST OF THE JEFFERSON C/L, EXTEND EAST APPROX 1.5 MIS (UT FOR 26502(04)) 26502(06) FFY 2014 LOVE Div. 7 SH032 1.500 Mi. Let 11/2013 $800,000 GRADE,DRAINING,BRIDGE & SURFACE US-412: FR 0.1 MILES EAST OF JCT US-281, EXTEND EAST APPROX 3.7 MILES 17358(10) FFY 2014 MAJOR Div. 6 US412 3.680 Mi. Let 03/2014 $8,307,183 RIGHT OF WAY US-60 OVER CIMARRON RIVER, 1.8 MILES SOUTH OF THE SH-8 JCT. RW FOR 27009(05) FFY 2014 27009(04) MAJOR Div. 6 US060 1.000 Mi. Let 04/2014 $100,000 UTILITIES US-60 OVER CIMARRON RIVER, 1.8 MILES SOUTH OF THE SH-8 JCT. UT FOR 27009(06) FFY 2014 27009(04) MAJOR Div. 6 US060 1.000 Mi. Let 04/2014 $163,500 BRIDGE REHABILITATION SH-69A: OVER PRYOR CREEK, 4.2 MILES EAST OF US-69 24235(04) FFY 2014 MAYES Div. 8 SH069A 0.500 Mi. Let 07/2014 $1,596,850 Wednesday, September 28, 2011 page 27 8 YEAR CONSTRUCTION WORK PLAN REPORT WorkPlanBook.rpt GRADE,DRAINING,BRIDGE & SURFACE US-70 FROM 6.2 MI EAST OF US-259 EAST 3.12 MI 17427(04) FFY 2014 MCCURTAIN Div. 2 US070 3.120 Mi. Let 07/2014 $14,170,001 RIGHT OF WAY US-259: FROM 2.0 MI NORTH OF THE TEXAS S/L, NORTH 6.0 MI RW FOR 24404(05) FFY 2014 24404(04) MCCURTAIN Div |
Date created | 2011-11-10 |
Date modified | 2011-11-10 |