Skip to main content

Add or remove other collections to your search:



Narrow your search by:



You've searched: All Collections

  • All fields: locations
(2998 results)



Display: 50

    • Fish hatchery operations and maintenance

    • Fish hatcheries--Oklahoma--Periodicals.
    • To maintain and operate four state fish hatcheries to produce 30 million fish (black basses, sunfish, catfish, walleye, saugeye, striped bass and hybrid bass) for stocking in Oklahoma waters to maintain 19 million angler-days recreational fishing...
    • Directory of literacy resources in Oklahoma

    • Literacy--Oklahoma--Directories.
    • The Oklahoma Literacy Clearinghouse, in response to the OLIC's recommendation 4.1, and Oklahoma State Statute, Title 70, Section 8005, has compiled a statewide directory of literacy programs and related services.; The Clearinghouse is maintaining...
    • Proposed plan, Tulsa Fuel and Manufacturing Superfund site, Collinsville, Oklahoma.

    • Hazardous waste site remediation--Oklahoma--Collinsville--Planning.; Tulsa Fuel & Manufacturing Superfund Site (Okla.); Soil remediation--Oklahoma--Collinsville--Planning.
    • This Proposed Plan, part of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process, identifies the preferred alternative for remediating the contamination associated with the Tulsa Fuel and Manufacturing...
    • Annual report

    • Oklahoma State Regents for Higher Education--Periodicals.;Education, Higher--Oklahoma--Periodicals.
    • A look at higher education in Oklahoma today and profiles of Oklahoma's 25 colleges and universities.
    • Arkansas River striped bass fishery assessment.

    • Striped bass--Arkansas River.; Fishery management--Arkansas River.
    • "1) To determine the size (total length) and age structure of the Arkansas River striped bass population at five points along the river system: Kaw Dam, Keystone Dam and Zink Dam, the lower Illinois River below Lake Tenkiller, and the Eufaula...
    • Guidelines for engineering reports for water projects

    • Water-supply engineering--Oklahoma--Planning.; Water-supply, Rural--Oklahoma--Planning.; Government report writing--Oklahoma.
    • The following documents were created by a joint effort of the state and federal funding and regulatory agencies that make up the Funding Agency Coordinating Team (FACT) to provide water and wastewater applicants a single, uniform method for...
    • Evaluation of social, economic and environmental impacts of Encompass 2035

    • Transportation--Oklahoma--Oklahoma City Metropolitan Area--Planning.; Transportation--Social aspects--Oklahoma--Oklahoma City Metropolitan Area.; Transportation--Environmental aspects--Oklahoma--Oklahoma City Metropolitan Area.
    • ACOG staff developed a list of social, economic, and environmental impacts relevant to the study area. Data relating to these topics was gathered and analyzed in relation to the transportation networks and considered for the Encompass 2035. This...
    • Transit supportive development guidebook : central Oklahoma.

    • Local transit--Oklahoma--Oklahoma City Metropolitan Area--Planning.; Transportation and state--Oklahoma--Oklahoma City Metropolitan Area.
    • This document represents the beginning of a journey to bring a regional transit system to Central Oklahoma. The benefits of such a system are numerous, giving Central Oklahomans access to a better, more livable lifestyle, while decreasing air...
    • CIRB, county improvements for roads and bridges : FY-2012 through FY-2016 construction work plan

    • Roads--Oklahoma--Maintenance and repair--Planning.; Roads--Oklahoma--Design and construction--Planning.; Bridges--Oklahoma--Maintenance and repair--Planning.; Bridges--Oklahoma--Design and construction--Planning.; Oklahoma. Department of...
    • With the passage of House Bill 1176 in the summer of 2006, a new section of law was codified in the Oklahoma Statutes as Section 507 of Title 69. This law effectively creates the County Improvements for Roads and Bridges (CIRB) program; The funds...
    • Quality assurance project plan for hydrodynamic and water quality modeling for Lake Thunderbird...

    • Hydrology--Oklahoma--Thunderbird, Lake, Reservoir--Computer simulation--Planning.; Water quality management--Oklahoma--Thunderbird, Lake, Reservoir--Computer simulation--Planning.; Thunderbird, Lake, Reservoir (Okla.); Water quality--Mathematical...
    • Instead of the typical TMDL study that is usually developed to address water quality issues in impaired waters, the Oklahoma DEQ will develop a watershed-based management plan. An important component of the watershed plan will be the identification...
    • Oklahoma agritourism : resource manual.

    • Agritourism--Oklahoma--Management.; Rural tourism--Oklahoma--Management.; Agritourism--Management.; Rural tourism--Management.
    • Throughout this site you will find information that will walk you through the process of starting an agritourism business, the resources available for your business, developing a business plan, and letting the public know what you have to offer. A...
    • Oklahoma comprehensive water plan. River basin water allocation modeling report

    • Water-supply--Oklahoma--Computer simulation.; Water resources development--Oklahoma--Planning.; Water-supply--Oklahoma--Forecasting.; Hydrologic models--Oklahoma.
    • The project objective was to create a new set of scenarios and options for the Oklahoma Water Resource Board (OWRB) water allocation models that would facilitate comparison of results with those of the OCWP gap analysis model. Subject basins were...
    • Frequently asked questions

    • Unemployment insurance--Oklahoma.;
    • The Oklahoma Debit Card. The Oklahoma Employment Security Commission (OESC) has implemented a new 'all electronic' payment program for receiving your payments by using either a new prepaid debit card called the Oklahoma Debit MasterCard Card or...
    • Regional & statewide opportunities & solutions

    • Water-supply--Oklahoma--Planning.
    • The following report was developed by the Oklahoma Water Resources Board and CDM, the OCWP’s lead engineering firm, to present the results of OCWP analyses with particular emphasis on planning basins (i.e., "hot spots") with the most significant...
    • Buildings & sites database user manual

    • Commercial buildings--Oklahoma--Information systems.; Industrial sites--Oklahoma--Information systems.; Geographic information systems--Oklahoma.
    • This document is a step-by-step guide to searching for available buildings and sites in the Oklahoma Department of Commerce Buildings & Sites database.
    • Muskogee Generating Station best available retrofit control technology evaluation

    • Coal-fired powerplants--Environmental aspects--Oklahoma--Muskogee.; Air quality management--Oklahoma--Economic aspect.; Air--Pollution--Oklahoma--Prevention.; Air--Pollution--Oklahoma--Mathematical models.; Coal-fired power plants--Fume...
    • On July 6, 2005, the U.S. Environmental Protection Agency (EPA) published the final “Regional Haze Regulations and Guidelines for Best Available Retrofit Technology Determinations” (the “Regional Haze Rule” 70 FR 39104).; The Regional Haze...
    • Turbidity total maximum daily load for Black Bear Creek, Oklahoma

    • Turbidity--Oklahoma--Black Bear Creek (Garfield County-Pawnee County); Water--Pollution--Total maximum daily load--Oklahoma--Black Bear Creek (Garfield County-Pawnee County); Suspended sediments--Oklahoma--Black Bear Creek (Garfield County-Pawnee...
    • This report documents the data and assessment used to establish a TMDL for Black Bear Creek, a tributary of the Arkansas River. The 2008 Integrated Water Quality Assessment Report (Oklahoma Department of Environmental Quality [ODEQ] 2008)...
    • Oklahoma comprehensive water plan. Programmatic work plan

    • Water resources development--Oklahoma--Planning.; Water-supply--Oklahoma--Planning.;
    • Programmatic planning has been conducted to provide overall guidance and direction for technical elements of the Water Plan. This Programmatic Work Plan(PWP) was developed through a partnership between OWRB and the U.S. Army Corps of Engineers...
    • Watershed based plan for the Illinois River Watershed

    • Watershed management--Illinois River Watershed (Ark. and Okla.); Watershed management--Arkansas.; Watershed management--Oklahoma.; Watershed restoration--Illinois River Watershed (Ark. and Okla.); Watershed restoration--Arkansas.; Watershed...
    • The Illinois River watershed spans the Oklahoma-Arkansas border in the northeastern part of the state and is located in Benton, Washington, and Crawford Counties in Arkansas and Delaware, Adair, Cherokee, and Sequoyah Counties in Oklahoma.; This...
    • Oklahoma state plan on aging

    • Older people--Services for--Oklahoma--Periodicals.
    • The Aging Services Division (ASD) of the Oklahoma Departmentof Human Services (OKDHS) has long served as Oklahoma's lead agency in services for older Oklahomans. The Special Unit on Aging was created in 1963 and the Aging Services Division was...
    • Turbidity total maximum daily loads for Sulphur Creek, Oklahoma (OK410600010030_00)

    • Turbidity--Oklahoma--Sulphur Creek (Bryan Co.); Turbidity--Oklahoma.; Water--Pollution--Total maximum daily load--Oklahoma--Sulphur Creek (Bryan Co.); Water--Pollution--Total maximum daily load--Oklahoma.
    • "This report documents the data and assessment used to establish a TMDL for Sulphur Creek, a tributary of the Blue River. The 2008 Integrated Water Quality Assessment Report (Oklahoma Department of Environmental Quality [ODEQ] 2008) identified...
    • Research highlights.

    • Agriculture--Research--Oklahoma--Periodicals.
    • The OCES continues to strive to disseminate the research information generated by OAES to the public through field days, workshops, tours, and demonstrations. This has been and will continue to be a major focus of our efforts at the Oklahoma...
    • Phase 1 targeted brownfield assessment for the Pauls Valley Armory.

    • Armories--Environmental aspects--Oklahoma--Pauls Valley.; Brownfields--Oklahoma--Pauls Valley.; Environmental impact analysis--Oklahoma--Pauls Valley.
    • The purpose of this assessment is to look at the environmental conditions within the target area and provide this information to the City of Pauls Valley to assist in its revitalization planning as well as meet the All Appropriate Inquiry...
    • Oklahoma enhanced 9-1-1 (E9-1-1) assessment and strategic plan

    • Telephone--Emergency reporting systems--Oklahoma.; Telephone--Emergency reporting systems--Oklahoma--Planning.
    • The Oklahoma Statewide Nine-One-One Advisory Board entered into an agreement with one of the country’s leading E9-1-1 experts to assist in assessing the status of E9-1-1 in Oklahoma and develop a strategic plan that can be used as the basis for...
    • 2030 Osage County comprehensive plan

    • Osage County (Okla.)--Planning.; Regional planning--Oklahoma--Osage County.
    • The 2030 Plan will be a “living document’ and the result of a very public process whereby a vision of the County and its physical development is reduced to statements of standards and strategies, goals, policies objectives and detailed plans...
    • 45th Fires Brigade

    • United States. Army. Fires Brigade, 45th.; Oklahoma--National Guard--Reorganization.; Artillery, Field and mountain--United States.; Iraq War, 2003- --Regimental histories--United States--Pictorial works.
    • Mission of the 45th Fires Brigade •Vision Statement; Transformation •Organization of the 45th Fires Brigade •Unit Locations •Mobilizations and Deployments •Past Events •Upcoming Event
    • Functional needs guidance and resource book

    • Emergency management--Oklahoma.; People with disabilities--Care--Oklahoma--Planning.; Older people--Care--Oklahoma--Planning.; Evacuation of civilians--Oklahoma.
    • Natural disasters negatively impact everyone. Preparing for disasters and emergencies is important for all individuals, and is especially critical for those with functional needs who may need specialized assistance during an emergency. To help...
    • State Capitol facade report.

    • Oklahoma State Capitol (Oklahoma City, Okla.); Capitols--Evaluation.
    • On September 14 and September 19, 2011, Zahl-Ford, Inc. (ZFI) performed a limited-scope, visual-only, structural inspection of the above referenced building.
    • Arbuckle-Simpson hydrology study : distributed water resources assessment

    • Hydrology--Oklahoma--Blue River.;Water balance (Hydrology)--Oklahoma--Blue River.;Blue River (Okla.);Arbuckle-Simpson Aquifer (Okla.)
    • "This study characterizes the hydrologic water budget in the Blue River basin and for the adjacent Clear and Muddy Boggy basins during the study period, 1994-2006. The water budget is computed by accounting for precipitation that becomes baseflow...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK